Resolved
RESOLVED that, subject to the conditions in the report, PLANNING PERMISSION be granted.
Planning Committee decided this item on Wednesday 26 April 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that, subject to the conditions in the report, PLANNING PERMISSION be granted.
P/17/0262/FP HILL HEAD EASTERN SOLENT COASTAL AGENT: EASTERN SOLENT PARTNERSHIP COASTAL PARTNERSHIP RECONSTRUCTION OF 150 METRES OF SEAWALL HILL HEAD BEACH HILL HEAD FAREHAM HAMPSHIRE
Report By Richard Wright - direct dial 01329 824758 Site Description This application relates to a stretch of coastline located to the east of the Hill Head Sailing Club building and public car park and toilets to the south of Cliff Road. The application site involves approximately 150 metres of the promenade and beach adjacent to the immediate north of which lie a number of beach huts.
At present the promenade is surfaced in concrete and shingle in front of the beach huts. The edge of the promenade where it meets the shingle beach is a sea wall constructed of gabion baskets and concrete filled bags which was built approximately 25 - 30 years ago. The land, and therefore these coastal defences, are owned by Fareham Borough Council. The frontage has been significantly affected in the last 12 years with a 30m section of the sea wall and promenade being rebuilt with similar materials in 2005. A further 30m section of frontage failed and was re-built and patched in 2014.
In September 2016 planning permission was granted for a beach recharge involving the importation of shingle onto the beach to top up the levels which had become depleted over time (reference P/16/0800/D3). Repairs were also carried out to the existing timber groynes on the beach to help protect the seawall from waves.
The application site lies adjacent to, and work will occur temporarily within, the Solent & Southampton Water Special Protection Area (SPA) and the Solent and Dorset proposed Special Protection Area (pSPA). In addition the site is adjacent to and, temporary works would take place within, the Lee-on-the-Solent to Itchen Estuary SSSI and close by to the Titchfield Haven SSSI.
Description of Proposal Planning permission is sought for the reconstruction of a 150 metre stretch of the existing seawall.
It is proposed to partially encapsulate the existing seawall within the new structure which would be built extending the promenade in width to the south onto the beach. A sheet piled wall clad in reinforced concrete would be constructed where the extended promenade abuts the beach and the gap behind the sheet piles would be infilled. On top of the sheet piles, which would be at the finished level of the promenade concrete slab, would be a further 600mm high recurve 'upstand' wall sloped towards the sea at its top. On top of the upstand would be a stainless steel barrier rail at an additional height of 500mm with posts a maximum of 1 metre apart (revised drawings were provided by the applicant on 10th April to change the design and materials of the rail barrier from a pre-galvanized "Kee Klamp" style). In total the upstand and barrier rail would be 1100mm (1.1m) higher than the level of the promenade. The height of the upstand and barrier rail on the beach side of the structure would vary according to the level of shingle on the beach.
Access to the beach from the promenade is proposed via a concrete slipway at the western end of the new wall, a set of steps approximately 45 metres east of there and another set of steps around 20 metres from the eastern end of the new wall. The eastern end of the wall would link into the existing seawall to the east of the site. That end of the promenade would also be wider than the rest with the aim being to correct the existing 'kink' in the wall at that point. An area for four benches plus a strip of vegetated shingle would be located on the northern side of the promenade at that point also.
Policies The following policies apply to this application:
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
P/17/0262/FP: HILL HEAD BEACH HILL HEAD FAREHAMReport | 1.2 MB | DownloadRead as text |
Follow Planning Committee at Fareham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 9 Sep 2026 | Minutes of Previous MeetingRESOLVED that the minutes of the Planning Committee meeting held on the 12 August 2026 be confirmed and signed as a c... | Decided | Open |
| 9 Sep 2026 | Q/0559/26 - Land Between 75 & 77 Church Road Warsash Southampton SO31 9GDRESOLVED that Members delegate authority to the Head of Planning, in consultation with the Solicitor to the Council, ... | Agreed | Open |
| 9 Sep 2026 | P/26/0722/FP - Single Storey Side Extension at 44 Crispin Close Locks Heath SO31 6TDRESOLVED that: - (i) IT BE CONFIRMED that had the planning application for a side extension at 44 Crispin Close (as p... | Decided | Open |
| 9 Sep 2026 | P/26/0791/AD - Barchester Care Home Stubbington Lane Stubbington PO14 2NFRESOLVED that: - (i) Advertisement Consent for Five Years be GRANTED , subject to:- (a) the Conditions in the report;... | Decided | Open |
| 12 Aug 2026 | Minutes of Previous MeetingRESOLVED that the minutes of the Planning Committee meeting held on the 15 July 2026 be confirmed and signed as a cor... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.