Resolved
RESOLVED that, subject to the conditions in the report and update report, PLANNING PERMISSION be granted.
Planning Committee decided this item on Wednesday 17 July 2019. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that, subject to the conditions in the report and update report, PLANNING PERMISSION be granted.
OFFICER REPORT FOR COMMITTEE DATE: 17/07/2019
P/19/0344/FP WARSASH SOLENT UNIVERSITY AGENT: VAIL WILLIAMS LLP
CONSTRUCTION OF NEW UNIVERSITY BUILDING TO BE USED AS FIRE AND POOL TRAINING CENTRES AND ASSOCIATED LANDSCAPING, SERVICE ROADS, AREAS OF HARD SURFACING, PARKING AND BOUNDARY TREATMENTS (FOLLOWING DEMOLITION OF THE JOHN THORNEYCROFT BUILDING, LOVAT HOUSE, DRUMMOND HOUSE, MOSS BUILDING, ESTATES BUILDING AND HOT AND COLD FIRE TRAINING UNITS)
WARSASH MARITIME ACADEMY, NEWTOWN ROAD, WARSASH
Report By Richard Wright – direct dial 01329 824758
1.0Introduction 1.1 This application is included on the Planning Committee agenda due to the number of third party representations that have been received in response to publicity of the proposals.
2.0Site Description 2.1 This application relates to part of the existing Warsash Maritime Academy campus which is located on the western side of Newtown Road on the banks of the River Hamble. The site comprises the northern half of the academy campus which is situated on lower land closer to the riverside in comparison to the southern section of the site. As a result it is referred to in the submission at various points as the “lower” or “retained” site.
2.2The site measures approximately 3.8 hectares of land of which a large proportion has previously been developed with educational campus buildings, other structures and large areas of hard surfacing. In the centre of the site is a tidal pond with trees of various sizes around its southern, eastern and northern perimeter. Those trees are covered by a tree preservation order over the area (FTPO 261). The land closest to the riverside is generally flat however the ground rises eastwards towards Newtown Road from which vehicular and pedestrian access is currently provided.
2.3As mentioned above, to the south of the site lies the southern section of the academy. To the immediate east lie the rear gardens of residential properties fronting Newtown Road. To the west a public footpath (part of the Solent Way) runs alongside the river separated from the application site by boundary walls and fencing but with gates to allow access from the pier which extends out into the river to provide access to vessels moored there.
2.4The site lies entirely outside of the defined urban settlement boundaries and so for planning purposes is considered to be located in the countryside. The adjacent river is designated for nature conservation purposes as a Special Area of Conservation (the Solent Maritime SAC), Special Protection Area (Solent & Southampton Water SPA) and Ramsar site. The river at this location also forms part of the Lee-on-the-Solent to Itchen Estuary Site of Special Scientific Interest (SSSI). The majority of the site lies within Flood Zone 3.
2.5Members may also be aware that the southern part of the academy campus, which lies to the south of the application site, is designated as a development allocation (ref HA7) in the draft Fareham Local Plan 2036.
3.0Description of Proposal 3.1 Permission is sought for the demolition of various existing buildings on the site followed by the construction of a new university building to be used as fire and pool training centres.
3.2The main ‘L’ shaped building will provide classrooms, training facilities, changing and storage space as well as a café, ablutions and plant rooms for the maritime fire and safety training functions of the university campus. The building will feature a Helicopter Underwater Escape Training (HUET) pool facility enabling it to provide training simulations of helicopter and oil rig rescues. The development would consolidate teaching and training activities into this new building which would measure 3,227 square metres (an increase of 282 square metres compared to the buildings that would be demolished).
3.3Access into the site is proposed to remain as existing via Newtown Road. New car parking facilities would be created to provide 216 parking spaces.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
P/19/0344/FP: WARSASH MARITIME ACADEMY NEWTOWN ROAD WARSASH SO31 9ZLReport | 649 KB | DownloadRead as text |
Follow Planning Committee at Fareham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 9 Sep 2026 | Minutes of Previous MeetingRESOLVED that the minutes of the Planning Committee meeting held on the 12 August 2026 be confirmed and signed as a c... | Decided | Open |
| 9 Sep 2026 | Q/0559/26 - Land Between 75 & 77 Church Road Warsash Southampton SO31 9GDRESOLVED that Members delegate authority to the Head of Planning, in consultation with the Solicitor to the Council, ... | Agreed | Open |
| 9 Sep 2026 | P/26/0722/FP - Single Storey Side Extension at 44 Crispin Close Locks Heath SO31 6TDRESOLVED that: - (i) IT BE CONFIRMED that had the planning application for a side extension at 44 Crispin Close (as p... | Decided | Open |
| 9 Sep 2026 | P/26/0791/AD - Barchester Care Home Stubbington Lane Stubbington PO14 2NFRESOLVED that: - (i) Advertisement Consent for Five Years be GRANTED , subject to:- (a) the Conditions in the report;... | Decided | Open |
| 12 Aug 2026 | Minutes of Previous MeetingRESOLVED that the minutes of the Planning Committee meeting held on the 15 July 2026 be confirmed and signed as a cor... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.