Resolved
RESOLVED that PLANNING PERMISSION be REFUSED. Reasons for Refusal The development would be contrary to Policies CS2, CS4, CS5, CS6, CS14, CS15, CS17, CS18, CS20 andCS21 of the Adopted Fareham Borough Core Strategy 2011 and Policies DSP1, DSP2, DSP3, DSP5, DSP6, DSP13, DSP14, DSP15 and DSP40 of the Adopted Local Plan Part 2: Development Sites and Policies Plan, and is unacceptable in that: i. The provision of dwellings in this location would be contrary to adopted local plan policies which seek to prevent residential development in the countryside; ii. The development of the site would result in an adverse visual effect on the immediate countryside setting around the site; iii. The introduction of dwellings in this location would fail to respond positively to and be respectful of the key characteristics of the area, in this countryside, edge of settlement location, providing limited green infrastructure and offering a lack of interconnected green/public spaces; iv. The quantum of development proposed would result in a cramped layout and would not deliver a housing scheme of high quality which respects and responds positively for the key characteristics of the area; v. The proposed development involves development that involves significant vehicle movements that cannot be accommodated adequately on the existing transport network. In sufficient information has been provided to demonstrate that the development would not result in a severe impact on road safety and operation of the local transport network; vi. The proposed access arrangement onto Peak Lane is inadequate to accommodate the development safely. This would result in an unacceptable impact on the safety of users of the development and adjoining highway network; vii. The proposal fails to demonstrate that the development would be accessible with regards to public transport links and walking and cycling routes to local services and facilities; viii. The development proposal fails to provide sufficient provision of, or support for, sustainable transport options. This would result in a greater number of trips by private car which will create a severe impact on the local transport network and the environment; ix. Inadequate information has been provided to assess the impact of the proposed works on water voles on site and any measures required to mitigate these impacts such as the provision of enhanced riparian buffers. In addition, there is insufficient information in relation to their long-term protection within the wider landscape by failing to undertake any assessment of the impact of the proposals on connectivity between the mitigation pond created as part of the Stubbington Bypass Scheme and the wider landscape. The proposal fails to provide appropriate biodiversity enhancements to allow the better dispersal of the recovering/reintroduced water vole population in Stubbington; x. Insufficient information has been submitted in relation to the adverse impacts of the proposals on the Solent Waders and Brent Goose Strategy Low Use Site and Secondary Support Area and any mitigation measures requires to ensure the long-term resilience of these support networks; xi. The development proposal fails to provide adequate wildlife corridors along the boundaries of the site to ensure the long-term viability of the protected and notable species on the site and avoidance of any future conflicts between the residents and wildlife (e.g. badgers damaging private garden areas) due to the lack of available suitable foraging habitat; xii. In the absence of sufficient information, it is considered that the proposal will result in a net loss in biodiversity and is therefore contrary to the NPPF which requires a net gain in biodiversity; xiii. The development would result in an unacceptable impact on a number of protected trees around the periphery of the site; xiv. The submitted flood risk assessment fails to assess the impact of climate change on the development and therefore fails to demonstrate that the development is appropriately flood resistant and resilient; xv. The development would fail to preserve, and would result in less than substantial harm to, the historic setting of the Grade II* Listed building Crofton Old Church; xvi. Had it not been for the overriding reasons for refusal the Council would have sought to secure the details of the SuDS strategy including the mechanisms for securing its long term maintenance; xvii. The development proposal fails to secure an on-site provision of affordable housing at a level in accordance with the requirements of the Local Plan; xviii. In the absence of a legal agreement to secure such, the proposal would fail to provide satisfactory mitigation of the ‘in combination’ effects that the proposed increase in residential disturbance on the Solent Coastal Special Protection Areas; xix. The development proposal fails to provide adequate public open space. In addition, in the absence of a legal agreement securing provision of open space and the facilities and their associated management and maintenance, the recreational needs of residents of the proposed development would not be met; xx. In the absence of a legal agreement to secure the submission and implementation of a full Travel Plan, payment of the Travel Plan approval and monitoring fees and provision of a surety mechanism to ensure implementation of the Travel Plan, the proposed development would not make the necessary provision to ensure measures are in place to assist in reducing the dependency on the use of the private motorcar; and xxi. In the absence of a legal agreement to secure such, the proposal would fail to provide a financial contribution towards education provision.