RESOLVED that, subject to: i) The conditions in the report; ii) The amended conditions 4 and 5 as set out in the Update Report; and iii) The addendum to Condition 11 which states that: The development hereby permitted shall be carried out strictly in accordance with the mitigation measures contained within the ecological impact assessment dated December 2019 and produced by Lindsay Carrington Ecological Services and the Dormouse Mitigation Strategy project noted produced by Holbury Consultancy Service Ref N170320NF. REASON: To ensure that protected species are not harmed and that habitat is enhanced as a result of the proposed development. PLANNING PERMISSION be granted.
Word for word from the decision Fareham published for this meeting.Source: moderngov.fareham.gov.uk
P/20/0007/FP FAREHAM NORTH WARD FAREHAM BOROUGH COUNCIL AGENT: DAVID LOCK ASSOCIATES
PROVISION OF ACCESS ROAD LINKING FUNTLEY HILL TO 70 & 72 KILN ROAD AND 1 & 2 DEAN FARM COTTAGES INCLUDING ASSOCIATED SITE CLEARANCE, GROUND REMODELLING AND ENGINEERING OPERATIONS.
Report By Rachael Hebden – direct dial: 01239 824424
1.0Introduction The existing access road to 70 & 72 Kiln Road and 1 & 2 Dean Farm Cottages (via Kneller Court Lane) is required to be closed to vehicular traffic to enable the construction of the new Junction 10 slip roads as proposed within the outline application for Welborne (P/17/0266/OA). The proposed works would have been secured by details pursuant to a planning condition on the Welborne decision notice had that permission been issued. However whilst the s106 negotiations continue with the Welborne application, these works have been submitted as a separate application to enable the new access works to be carried out within the optimum seasonal period to prevent impact on potential ecological receptors and for the existing access to be able to be closed (Kneller Court Lane) as soon as is necessary after the determination of the outline application P/17/0266/OA to enable the junction 10 works to start.
2.0Site Description 2.1 The site is currently an arable field. There is an existing right of way (Fareham Footpath 89) which runs parallel to the M27 from Funtley Hill to the A32. The footpath comprises an unsurfaced footpath.
2.2The site is generally flat and at a lower level to the M27 which runs east to west to the south of the application site. At the western end of the site is a boundary hedge to Funtley Hill. A new opening is proposed in this hedge with a simple give way junction proposed onto the Highway.
2.3At the eastern end, the site is currently enclosed by a post and rail fence and hedging which will also need to be removed in part to connect to the northern most part of Kneller Court Lane outside the properties 70 and 72 Kiln Road.
3.0Description of Proposal 3.1 The proposed access will be to the north of the M27, east of Funtley and south of the employment buildings within Dean Farm Estate. The access road will approximately follow the line of the existing footpath that links Kneller Court with Funtley Hill. The proposed access onto Funtley Hill is south of an existing farm gate to allow for adequate visibility onto Funtley Hill.
3.2The proposed access is approximately 440m long and 4m wide with 2 passing places. The road will be constructed from tarmac but will be a private road and will not form part of the adopted highway. To facilitate the creation of the access a limited amount of ground remodelling is also required.
4.0Policies 4.1 The following policies apply to this application:
Adopted Fareham Borough Core Strategy CS5: Transport Strategy and Infrastructure;
Local Plan Part 3: The Welborne Plan WEL1 Sustainable Development WEL 3 Allocation of Land WEL 4 Comprehensive Development WEL8 Protection and Enhancement of the Historic Environment WEL23 Transport Principles for Welborne WEL24 Strategic Road Access WEL25 Local Road Transport and Access WEL28 Walking and Cycling WEL29 On-site Green Infrastructure WEL30 Avoiding and Mitigating the Impact on Internationally Protected Sites and Off-Site Green Infrastructure WEL31 Conserving and Enhancing Biodiversity WEL32 Strategic Green Corridors and Connections WEL33 Structural Landscaping WEL34 Detailed Landscaping WEL39 Flooding and Sustainable Drainage Systems
Other Documents: Welborne Design Guidance: Supplementary Planning Document January 2016
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.