RESOLVED that PLANNING PERMISSION be REFUSED. Reasons for Refusal The development would be contrary to Policies CS5 of the adopted Fareham Borough Core Strategy 2011 and Policy DSP40 of the adopted Local Plan Part 2: Development Sites and Policies Plan, and Paragraphs 109 and 110 (c) of the National Planning Policy Framework, and is unacceptable in that: The proposal would result in a material increase in vehicular and pedestrian movements along Down End Road across the road bridge over the railway line. The works to the bridge as shown on drawing no. ITB12212-GA-051D (titled “Downend Road Bridge – Proposed Signal Arrangement With Footway General Arrangement”) would unacceptably affect the operation of the highway because of the vehicle queuing and driver delay that would arise and would result in unacceptable harm to the safety and convenience of users of the highway. Furthermore the application does not make acceptable pedestrian crossing provision on Down End Road for future residents of the development.
Word for word from the decision Fareham published for this meeting.Source: moderngov.fareham.gov.uk
P/20/0912/OA PORTCHESTER WEST MILLER HOMES AGENT: TERENCE O’ROURKE LIMITED
OUTLINE PLANNING APPLICATION WITH ALL MATTERS RESERVED (EXCEPT THE MEANS OF ACCESS) FOR RESIDENTIAL DEVELOPMENT, DEMOLITION OF EXISTING AGRICULTURAL BUILDINGS AND THE CONSTRUCTION OF NEW BUILDINGS PROVIDING UP TO 350 DWELLINGS, THE CREATION OF NEW VEHICULAR ACCESS WITH FOOTWAYS AND CYCLEWAYS, PROVISION OF LANDSCAPED COMMUNAL AMENITY SPACE, INCLUDING CHILDREN'S PLAY SPACE, CREATION OF PUBLIC OPEN SPACE, TOGETHER WITH ASSOCIATED HIGHWAYS, LANDSCAPING, DRAINAGE AND UTILITIES.
LAND EAST OF DOWN END ROAD, FAREHAM
Report By Richard Wright – direct dial 01329 824758
1.0Introduction 1.1 This application has been presented to the Planning Committee due to the number of third party representations received.
1.2Members will note from the ‘Five Year Housing Land Supply Position’ report presented to the Planning Committee on 24th June 2020 this year that this Council currently has a housing land supply of 4.03 years (a shortfall of 522 dwellings within the 5-year period).
1.3This application is similar to a previous application for residential development on this site (planning reference P/18/0005/OA) which was refused planning permission by this Committee in April 2019 for the following reasons:
The development would be contrary to Policies CS5 of the adopted Fareham Borough Core Strategy 2011 and Policy DSP40 of the adopted Local Plan Part 2: Development Sites and Policies Plan and is unacceptable in that:
a) The proposal would result in a material increase in pedestrian movements along Down End Road across the road bridge over the railway line. The works to the bridge as shown on drawing no. ITB12212-GA-003 Rev B (titled “virtual footway proposal”) and the works to the bridge as shown on drawing no. ITB12212-GA-004 Rev B (titled “reduced width formal footway”) would provide inadequate footway provision to ensure the safety of pedestrians using the bridge and other highway users. The works to the bridge as shown on drawing no. ITB12212-GA-011 Rev B (titled “priority shuttle working”) would result in unacceptable harm to the safety and convenience of users of the highway.
b) The application site is not sustainably located in terms of access to local services and facilities.
1.4A public inquiry was held in September 2019 with the two reasons for refusal above being the substantive issues. A decision was issued by the Planning Inspectorate in November last year and the appeal was dismissed.
1.5With regards to reason for refusal b), the appeal Inspector found that:
“There would not be an unreasonable level of accessibility to local services and facilities for the occupiers of the development by a range of modes of transport” (paragraph 80 of the appeal decision).
1.6However, in response to reason for refusal a), the Inspector concluded that:
“The implementation of option 2 [the “virtual footway proposal”] would make inadequate provision for pedestrian access via Downend Road, while the implementation of option 3 [titled “priority shuttle working”], in making adequate provision for pedestrian users of Downend Road, would unacceptably affect the operation of this road because of the vehicle queuing and driver delay that would arise” (paragraph 72).
2.0Site Description 2.1 The application site (measuring 20.39 hectares) is located on the slopes of Portsdown Hill north of the Portsmouth to Southampton railway line which forms the development’s southern boundary. The site comprises agricultural land and paddocks with farm buildings at its centre. The site is in the countryside and lies outside of the urban settlement boundary as defined in the adopted local plan. To its east is Portchester Crematorium and the Memorial Gardens whilst to its north-west is an open-air waste facility. Close by on the eastern side of Down End Road is a small group of residential and commercial properties.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.