Resolved
RESOLVED that, subject to the conditions in the report, PLANNING PERMISSION be granted.
Planning Committee decided this item on Tuesday 2 November 2021. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that, subject to the conditions in the report, PLANNING PERMISSION be granted.
OFFICER REPORT FOR COMMITTEE DATE: 2nd November 2021
P/21/0786/FP SARISBURY EASTLANDS SHIPYARD LTD AGENT: PDP ARCHITECTURE LLP
CONSTRUCTION OF NEW, 2 STOREY BUSINESS UNIT - UNIT C
EASTLANDS BOATYARD
Report By Rachael Hebden 01329 824424
1.0Introduction 1.1 The application is reported to planning committee as more than five third party letters of representation have been received.
2.0Site Description 2.1 The site is located to the north of the M27 and east of the River Hamble and is positioned in between Eastlands Boatyard and the Midas Business Park. The land to the north and north east is undeveloped and contains a mixture of open fields and woodland.
2.2Vehicular access to the site is via Coal Park Lane which incorporates a bridge over the M27. The riverside location also means that the Boatyard can be accessed by boat via the River Hamble.
2.3The site is positioned on a gentle slope towards the bottom of the Hamble Valley with the gradient decreasing westwards down towards the River Hamble. The vehicular access slopes down from the motorway towards the site and has fairly steep grass banks.
2.4The site itself is not subject to any ecological designations, however the River Hamble (which is close to the site) is identified as being: a Site of Importance for Nature Conservation (SINC), a Special Protection Area (SPA) and a Special Area of Conservation (SAC)
3.0Description of Proposal 3.1 The applicant is a company that specialises in designing and building tenders for superyachts. The proposed building would be used in connection with the existing business operating at the boatyard already and would contain: a workshop space, paint spray booths, a small office, a staff canteen and toilet facilities. 3.2 The proposed building would be 60.4m long and 20.3m wide with a shallow pitched roof and large roller shutter doors to enable vessels to be moved in and out of the building. The building would incorporate an external spiral staircase on the north west elevation to provide a fire escape. The building would be clad in Kingspan insulated wall and roof panels with powder coated aluminium windows, doors and fascias.
4.0Policies 4.1 The following policies apply to this application:
National Planning Policy Framework 2021
Adopted Fareham Borough Core Strategy CS1 – Employment Provision CS4 – Green Infrastructure, Biodiversity and Geological Conservation CS5 – Transport Strategy and Infrastructure CS6 – The Development Strategy CS9 – Development in the Western Wards & Whiteley CS14 - Development Outside Settlements CS17- High Quality Design
Adopted Development Sites and Policies DSP1 – Sustainable Development DSP2 – Environmental Impact DSP9 – Economic Development Outside of the Defined Urban Settlement Boundaries DSP13-Nature Conservation DSP19 – Boatyards
Draft Fareham Local Plan 2037 DS3 Landscape E6 Boatyards
Other Documents: Non-Residential Car Parking Standards
5.0Relevant Planning History 5.1 The following planning history is relevant:
P/21/0338/FP Refurbishment of existing industrial unit with changes to external fenestration and removal of existing dead tree. Approved 22.4.21
P/21/0675/FP Demolition of single storey bungalow dwelling and construction of single storey office building and single storey berth holder facility. Not yet determined
6.0Representations 6.1 Representations have been received from 16 addresses raising the following concerns:
o Any increase in traffic requires the installation of traffic lights to be installed at the bridge. o The proposed building should be in keeping with the existing buildings o Potential odour. o Any storage of equipment outside the premises should be screened from wider views. o Traffic calming measures required o The bridge will need to be strengthened o Coal Park Lane is required for access/egress from the Air Traffic Control Centre in the event of an emergency. o The statement accompanying the planning application regarding the re- location of existing businesses is disingenuous.
7.0Consultations EXTERNAL
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
P/21/0786/FP: UNIT 1 23 COAL PARK LANE SWANWICK SO31 7GWReport | 975 KB | DownloadRead as text |
Follow Planning Committee at Fareham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 9 Sep 2026 | Minutes of Previous MeetingRESOLVED that the minutes of the Planning Committee meeting held on the 12 August 2026 be confirmed and signed as a c... | Decided | Open |
| 9 Sep 2026 | Q/0559/26 - Land Between 75 & 77 Church Road Warsash Southampton SO31 9GDRESOLVED that Members delegate authority to the Head of Planning, in consultation with the Solicitor to the Council, ... | Agreed | Open |
| 9 Sep 2026 | P/26/0722/FP - Single Storey Side Extension at 44 Crispin Close Locks Heath SO31 6TDRESOLVED that: - (i) IT BE CONFIRMED that had the planning application for a side extension at 44 Crispin Close (as p... | Decided | Open |
| 9 Sep 2026 | P/26/0791/AD - Barchester Care Home Stubbington Lane Stubbington PO14 2NFRESOLVED that: - (i) Advertisement Consent for Five Years be GRANTED , subject to:- (a) the Conditions in the report;... | Decided | Open |
| 12 Aug 2026 | Minutes of Previous MeetingRESOLVED that the minutes of the Planning Committee meeting held on the 15 July 2026 be confirmed and signed as a cor... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.