RESOLVED that: - (i) AUTHORITY be delegated to the Head of Development Management to: (a) Make any necessary modification, deletion or addition to the proposed conditions; and (b) Make any necessary changes arising out of detailed negotiations with the applicant which may necessitate the variation, addition or deletion of the conditions as drafted to ensure consistency between the two sets of provisions; (ii) PLANNING PERMISSION be granted subject to the conditions in the report; and (iii) An INFORMATIVE be added to the decision notice requesting that the applicant use all reasonable endeavours to ensue that all good roof tiles and bricks from the original part of Admiral House, are sympathetically salvaged and made available to re-use in building projects elsewhere.
Word for word from the decision Fareham published for this meeting.Source: moderngov.fareham.gov.uk
P/22/0709/FP FAREHAM EAST WARD NL CARE LTD & PALACE CAPITAL AGENT: WOOLF BOND PLANNING (SIGNAL) LTD
DEMOLITION OF EXISTING BUILDINGS AND ERECTION OF A 75-BEDROOM CARE HOME IN C2 USE, WITH ASSOCIATED CAR PARKING, LANDSCAPING AND ACCESS
ADMIRAL HOUSE & NICHOLSON GATE, HIGH STREET, FAREHAM, PO16 7BQ
Report By Peter Kneen – direct dial 01329 824363
1.0Introduction 1.1 The application is presented to the Planning Committee for determination due to the number of third party letters that have been received.
2.0Site Description 2.1 The site is located to the northern end of Fareham High Street, within the designated Urban Settlement Boundary, and within the Fareham High Street Conservation Area. The site is located on the eastern side of the High Street, where it turns into Wickham Road, and is situated to the southern side of Wallington Hill. Wallington Hill is a ‘no through road’ which provides access to the site and Wates House (to the northern side of Wallington Hill) and the pedestrian/cycle link over Wallington Way (A32) which connects the High Street to Wallington village and Broadcut.
2.2The site itself is relatively steeply sloped, sloping down to the northeast towards Wallington Way, where the Wallington River valley lies. The site is bounded by mature trees, the majority of which are protected either by individual Tree Preservation Orders or by their siting within the Conservation Area. A footpath wraps around the northern and eastern sides of the site, linking Wallington Hill to Lysses Open Space that is situated to the rear of Lysses Hotel.
2.3There are two existing buildings on the site, with large areas of metaled car parking. Nicholson Gate is a modern office building constructed in the 1980s, which has been consistently vacant for a considerable period of time. Admiral House, is an extended 1930s building set within the upper parts of slope, which is partially occupied as office accommodation presently. The building has been extended and modified significantly over the years. 3.0 Description of Proposal 3.1 The application proposes the demolition of the existing buildings on the site, and the erection of a single replacement structure, largely sited over the Admiral House building, comprising a 75 bedroomed care home (Use Class C2 – Residential Institutions). The building, designed in a neo-Georgian style is set over four floors, comprising lower ground floor, upper ground floor, first floor and second floor, making use of the topography of the site.
3.2The lower part of the site (where Nicholson Gate is situated) is located within the designated flood plain and is therefore proposed to be used for car parking and landscaping. The majority of the surrounding protected trees around the site would be retained.
3.3The application submission has been supported by a number of technical documents, including Planning, Design and Access Statement, Preliminary Ecological Report, Bat Activity Survey, Nitrates Budget Assessment Report, Biodiversity Impact Assessment, and Metric 3.1 Calculation, Arboricultural Impact Assessment, Tree Protection Plan, Contaminated Land Assessment, Noise Impact Assessment, Transport Assessment and Travel Plan, Archaeological Assessment, Utilities Statement, Flood Risk Assessment, Heritage Statement, Surface and Foul Water Drainage Strategy, Lighting Assessment and Office Marketing Report.
4.0Policies 4.1 The following policies apply to this application:
Adopted Fareham Borough Core Strategy CS1: Employment Provision CS2: Housing Provision CS3: Vitality and Viability of Centres CS4: Green Infrastructure, Biodiversity and Geological Conservation CS5: Transport Strategy and Infrastructure CS6: The Development Strategy CS7: Development in Fareham CS17: High Quality Design
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.