RESOLVED that, subject to: - (i) DELEGATION of authority be given the Head of Development Management to; (a) Make any necessary modification, deletion or addition to the proposed conditions; and (b) In consultation with the Solicitor to the Council, consider any comments received from Natural England relating to the consultation on the Appropriate Assessment and to make any minor modifications to the proposed conditions, addition of conditions, or any other subsequent minor changes arising. (ii) Reserved matters and details pursuant to conditions 5 & 11 of the outline planning permission reference P/20/0912/OA be APPROVED, subject to: - (a) The amendments to conditions 1 and 5 as per the Update Report; (b) The addition of Condition 7 as set out in the Update Report; (c) An additional condition removing the Permitted Development Rights for windows at upper floor level on the rear (eastern) elevation for Plot 8; and (d) An additional condition requiring a disabled parking bay be provided for Block 6.
Word for word from the decision Fareham published for this meeting.Source: moderngov.fareham.gov.uk
P/21/2048/RM PORTCHESTER WEST MILLER HOMES LTD AGENT: TERENCE O’ROURKE
PHASE ONE: APPLICATION FOR THE APPROVAL OF ALL OUTSTANDING RESERVED MATTERS FOR THE ERECTION OF 180 RESIDENTIAL DWELLINGS WITH ASSOCIATED INTERNAL ACCESS ARRANGEMENTS, PARKING, LANDSCAPING, OPEN SPACE AND ANCILLARY INFRASTRUCTURE WORKS (PHASE ONE PURSUANT TO OUTLINE CONSENT P/20/0912/OA)
LAND EAST OF DOWNEND ROAD, PORTCHESTER
Report By Richard Wright – direct dial 01329 824758
1.0Introduction 1.1 This application has been reported to the Planning Committee for determination due to the number of third party letters of objection received.
1.2Members will be aware that in October 2021, outline planning permission was granted on appeal for the construction of up to 350 homes on land east of Downend Road, Portchester (our reference P/20/0912/OA, appeal reference APP/A1720/W/21/3272188). That appeal determined the principle of development to be acceptable as well as the means of access.
2.0Site Description 2.1 This application is for the first phase of the development granted outline planning permission on appeal and so the application site comprises the western part of the wider site.
2.2The site is located on the slopes of Portsdown Hill north of the Portsmouth to Southampton railway line which forms the development’s southern boundary. The site comprises agricultural land and paddocks with farm buildings at its centre. It is in the countryside and lies outside of the urban settlement boundary as defined in the adopted local plan. To the east of the site lies land which is proposed to be developed in the second phase of the scheme. To the north-west is an open-air waste facility operated by Veolia and close by on the eastern side of Down End Road is a small group of residential and commercial properties.
2.3Vehicular access is currently provided in two places, on the eastern side of Down End Road and from The Thicket via a bridge across the railway line (Cams Bridge). A building used as a motor repairs business is located close to the northern side of the bridge however the red edge of the application site is drawn so as not to include that building or its forecourt.
3.0Description of Proposal 3.1 Approval is sought for the reserved matters pursuant to the outline consent for the appearance, scale and layout of the buildings and the landscaping of the site insofar as it relates to the first 180 dwellings (phase one).
3.2The proposed layout of the site is arranged in an array of nine so-called ‘perimeter blocks’ of dwellings. The first of these blocks is on the southern side of the main estate spine road which is shown leading from the approved vehicular access junction with Downend Road eastwards into the site. The main spine road continues eastwards with six blocks of housing on its northern side and two to its south before turning to continue in a north/south orientation. Leading from the spine road are secondary routes to serve the dwellings including roads leading further eastwards to provide access to phase two (the remaining 170 homes).
3.3In the eastern part of the site is an area of public open space which is designed to meet up with the remainder of the open space to serve the development, the majority of which would be located on the land to the east to be brought forward in phase two. Along the southern edge of the site are a series of infiltration basins as part of the proposed surface water drainage scheme. Also on the southern boundary is the point where the application site meets the northern end of the existing track over Cams Bridge over which pedestrian and cyclist access would be provided. A separate permission granted in 2019 allows for improvements to Cams Bridge and its approaches for this purpose and the detail of those improvements are included in a separate report on this Planning Committee agenda for Members’ consideration (application reference P/21/0741/RM).
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.