Resolved
RESOLVED that the application be DEFERRED for three months.
Planning Committee deferred this item on Wednesday 13 August 2025. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that the application be DEFERRED for three months.
OFFICER REPORT FOR COMMITTEE DATE: 13/08/2025
P/24/1247/FP UPLANDS AND FUNTLEY WARD MR STEVE MOTTERSHEAD PORTSMOUTH AND DISTRICT ANGLING SOCIETY
SURFACE CAR PARK WITH A DROPPED KERB
FUNTLEY POND, LAKESIDE, FAREHAM, PO17 5EP
Report By Charlotte Fleming – direct dial 01329 824 702
1.0Introduction 1.1. The application is reported to the Planning Committee due to the number of third party letters of representation received regarding the development.
2.0Site Description 2.1. The application site comprises Funtley Pond also known as Funtley Lake and surrounding land, a designated area of publicly accessible open space, which is privately owned and managed. The site is located outside of the designated urban settlement area.
2.2Funtley Pond and its surrounding land is owned by Portsmouth and District Angling Society and is used by its members for angling whilst also being publicly accessible for the enjoyment of local residents. A group of club volunteers maintains the waters and the land.
2.3The grassland area is open to the public and is capable of being used for informal recreation. A public right of way (Footpath 513a) runs all the way around the lake and passes close by to the intended location of the development, although unaffected by the proposal. Public right of way (Footpath 513b) connects the circulatory footpath to Lakeside, running to the immediate east of the proposed development site.
2.4The wider site and grass verge of the lake slopes down from Lakeside to the lake, which is partially screened by vegetation closer to the lake.
2.5The development is proposed to take place between the existing storage shed/copse of trees and 21 Lakeside, to the north of the lake, adjacent to the 6 vehicle layby. To the north of Lakeside is a further area of open amenity space situated between Lakeside and the main Funtley Road. 2.6. Currently anglers must park on residential streets, including the adjoining layby to use the lake.
3.0Description of Proposal 3.1. Permission is sought for a private surface car park (approximately 190sqm – measuring 13m x 13m + access) providing four car parking spaces and one disabled space.
3.2The original submission proposed space for eight vehicles and one disabled parking space on the same plot, but this was amended after analysis highlighting the spaces would not comply with parking or highway standards.
3.3The ground materials will be of grass reinforcement mesh, with a wooden sleeper boundary designation, along with a secure metal access gate (1m high, 3m wide), to be set 6m back from the road.
3.4The proposal will result in the removal of one of the shared street layby spaces to allow for the provision of a dropped kerb and vehicle access to the proposed car park.
4.0Policies 4.1. The following policies apply to this application:
Adopted Fareham Local Plan 2037 DS1: Development in the Countryside NE1: Protection of Nature Conservation, Biodiversity and the Local Ecological Network NE2: Biodiversity Net Gain NE10: Protection and Provision of Open Space TIN1: Sustainable Transport TIN2: Highway Safety and Road Network D1: High Quality Design and Place Making
Other Documents: a) National Planning Policy Framework (NPPF) 2024 b) Fareham Borough Design Guidance: Supplementary Planning Document (excluding Welborne) December 2015 c) Non-Residential Parking Standards 2015
5.0Relevant Planning History 5.1. The following planning history is relevant:
P/12/0185/FP Proposed siting of storage container APPROVE 16/03/2012 (Committee)
P/94/0615/FP Construction of private car park (12 spaces) REFUSE 15/12/1995 (Committee)
6.0Representations 6.1. 17 letters of representation have been received comprising 12 letters of objection (from 9 addresses) and 5 letters of support (from 4 addresses) which raise the following points:
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
P/24/1247/FP: Funtley PondReport | 685 KB | DownloadRead as text |
Follow Planning Committee at Fareham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 9 Sep 2026 | Minutes of Previous MeetingRESOLVED that the minutes of the Planning Committee meeting held on the 12 August 2026 be confirmed and signed as a c... | Decided | Open |
| 9 Sep 2026 | Q/0559/26 - Land Between 75 & 77 Church Road Warsash Southampton SO31 9GDRESOLVED that Members delegate authority to the Head of Planning, in consultation with the Solicitor to the Council, ... | Agreed | Open |
| 9 Sep 2026 | P/26/0722/FP - Single Storey Side Extension at 44 Crispin Close Locks Heath SO31 6TDRESOLVED that: - (i) IT BE CONFIRMED that had the planning application for a side extension at 44 Crispin Close (as p... | Decided | Open |
| 9 Sep 2026 | P/26/0791/AD - Barchester Care Home Stubbington Lane Stubbington PO14 2NFRESOLVED that: - (i) Advertisement Consent for Five Years be GRANTED , subject to:- (a) the Conditions in the report;... | Decided | Open |
| 12 Aug 2026 | Minutes of Previous MeetingRESOLVED that the minutes of the Planning Committee meeting held on the 15 July 2026 be confirmed and signed as a cor... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.