1. To provide an overview on the current building safety and compliance position at the end of November 2025.
2. Construction Services manage the 24 domestic high-rise blocks in accordance with the Building Safety Act, and the six key areas of compliance across the property portfolio.
3. The Council has in place schemes of work to complete risk assessments and servicing of equipment for the key six areas of compliance – fire, water, asbestos, electric, gas, mechanical.
Key Information and Next Steps/Proposals (where appropriate)
4. High Rise Block Compliance
Table 1 High Rise fire risk assessments
4.1High Rise fire risk assessments are 100% complete. 4.2. of the 24 blocks 21 are registered with the Building Safety Regulator (BSR). The reason for this: • Priory Court – Block is empty of residents. Decanted following flood, not to be reoccupied • Angel Court – does not meet criteria of the BSR but still requires door checks under Fire Safety (England) Regulations 2022. • Crowhall Towers – Block is empty of residents. 4.3 Remedial actions arising from the fire risk assessments are yet to be completed at the Australia Blocks. This is low and medium level works to the bin chutes. Access to some flats has been difficult with notice seeking possessions now served on the no access flats. 4.4 All 3,114 communal fire doors are in a quarterly inspection programme. 201 fire doors are left to inspect at the time of this report.
4.5All 1,417 flat front doors are in a 3-year programme. To date 481 tenants have refused access for the inspection. Those no access properties may be subject to legal action in the New Year.
4.6Pennington Choices have been commissioned to carry out a health check of the high-rise block operating procedures with a January completion target. This will enable full assurance to members.
4.7Northumbria Water has been commissioned to carry out surveys of the high-rise block water inlets to enable tanker supplies of water 24/7, pumped into the existing water system, should there be a total loss of water to site such as happened at Regent Court, or partial as has happened in other blocks. The intention is to remove the need for bottled water and prevent the loss of washing and toilet facilities
5. St Cuthberts Court fire update
5.1In August 2025, there was a fire incident at St Cuthberts Close. Fire safety systems reacted effectively and there was minimal fire spread.
5.2Discussions with Tyne and Wear Fire and Rescue Service are ongoing to determine any other fire safety that may be required to ensure the safety of residents
6. Mid and low Rise Block Compliance
Table 2 Mid and Low rise Fire Risk Assessments
6.1All mid- and low-rise block fire risk assessments are up to date. There are no high-risk issues. Table 3 Gas
6.2Gas servicing is 100% compliant. Table 4 Properties with no gas connection
6.3Properties which currently have no gas but have the possibility of having gas appliances connected are checked on an annual basis. Table 5 Leasehold and shared ownership gas
6.4Access to leasehold properties is challenging with little legal recourse.
6.5Shared Ownership is at 100% compliance, but the certification was not uploaded to systems in time for the month end report. Table 6 Communal gas
6.6Communal gas servicing is 100% compliant
6.7Other relevant gas information (this financial year): ➢ 13,804 services. ➢ 437 boilers replaced. ➢ 4 gas fires removed ➢ 81 warrants have been obtained and executed ➢ 6,545 no access events ➢ 6,094 gas repairs have been completed ➢ 867 remedial works orders have been completed Table 7 Solid Fuel
6.8Solid fuel servicing is 100% compliant with services taking place during October and April. Table 8 Electrical – Domestic
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Building Safety and ComplianceReport | 501 KB | DownloadRead as text |
Follow Housing, Environment and Healthy Communities Overview and Scrutiny Committee at Gateshead and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 29 Jun 2026 | Introduction to Housing, Environment and Healthy Communities OSCRESOLVED ... view the full minutes text for item CPL3 | Decided | Open |
| 29 Jun 2026 | Performance Management and Improvement FrameworkRESOLVED that: i. the contents of the annual report at appendix 1 be noted. ii. the additional information will be ma... | Noted | Open |
| 29 Jun 2026 | Work ProgrammeRESOLVED that: i) The proposed work programme items to date be noted; ii) Work be carried out between the Chair and o... | Noted | Open |
| 23 Mar 2026 | Regulatory Judgement Improvement PlanRESOLVED that: i. the Committee provided its views and comments on the content of the report. | Decided | Open |
| 19 Jan 2026 | Work ProgrammeRESOLVED that i . the Committee noted the . | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.