Planning Committee, Thursday 27 November 2014 at 6.00pm

Application No. 2014/0556- Barracks Farm, Forest Lane, Papplewick, Nottinghamshire

Approved Planning 1 paper

Planning Committee approved this item on Thursday 27 November 2014. Below is the council's own wording, with the papers it was decided on.

Item244

Resolved

RESOLVED to GRANT PLANNING PERMISSION subject to the following conditions: 1. The development hereby permitted shall begin not later than three years from the date of this decision. Written confirmation of the date when electricity is first exported to the grid from the wind turbine hereby permitted (First Export Date) shall be submitted to the Borough Council within one month of the date of this taking place. 2. This permission shall endure for a period of 25 years from the first export date (of electricity to the grid), after which the use shall cease, and the turbine, ancillary structures, crane erection and lay down areas shall be removed from the site, and the land restored in accordance with details to be approved in writing under condition 18 below. The site shall be decommissioned in accordance with the details to be approved under condition 18. 3. The development hereby permitted shall be carried out in accordance with the following approved plans except insofar as may be otherwise required by other conditions of this planning permission: Site Layout Plan (L-MAR-064-SLPX); Site Layout Plan Proposed (L-MAR-064-SLPP); Wind Turbine Boundaries Plan (L-MAR-064-BP); Elevations (drawing no: 1000900); Ecological Walkover Survey Report (424.03643.00010 dated March 2014); Landscape and Visual Impact Assessment (dated December 2013); Noise Impact Assessment (Ref: 1632 Papplewick Wind Turbine); Shadow Flicker Assessment (Project L MAR 064); Technical and Operational Assessment (NAT ref: W(F) 18624); Volume 1 - The Planning Statement (dated April 2014); Planning Supporting Statement Addendum - Green Belt Special Circumstances Justification (August 2014); Supplementary Nightjar and Woodlark Report (SLR ref: 424.03643.00010 August 2014); and Further Detail with Respect to Very Special Circumstances (02.11.2014). 4. Before development hereby approved is first commenced, precise details and elevations of the proposed substation housing shall be submitted to and approved in writing by the Borough Council. The substation shall have the following parameters: No wider than 3.5 metres, no longer than 6.5 metres, and it shall have a ridge height no more than 3 metres. The development shall be implemented in accordance with the written approval. 5. Before the development hereby approved is commenced, and any associated materials transported to the site, a Construction Traffic Management Plan shall be submitted to and approved in writing by the Borough Council. The Plan shall include the following: ( i ) ... view the full minutes text for item 244.
Word for word from the decision Gedling published for this meeting. Source: democracy.gedling.gov.uk

Follow this further

Built from Gedling's papers

What the report saysPro

Report to Planning Committee

Application Number: 2014/0556 Barracks Farm, Forest Lane, Papplewick, Location: Nottinghamshire.

OTE: This map is provided only for purposes of site location and should not be read as an up to date representation of the area around the site. Reproduced with the permission of the Controller of H.M.S.O. Crown Copyright No. LA 078026 Unauthorised reproduction infringes Crown copyright and may lead to prosecution of civil proceedings Report to Planning Committee Application Number: 2014/0556

Location: Barracks Farm, Forest Lane, Papplewick, Nottinghamshire.

Proposal: Erection of a 500kw wind turbine with a tip height up to 77m along with transformer station at base, access track from farm to turbine and access improvements at junction of farm access and Forest Lane.

Applicant: Robert Marshall

Agent: [name removed] Officer: David Gray

1.0The Proposed Development

1.1Full Planning is sought for the erection of a single 500kw wind turbine and associated infrastructure on agricultural land to the west of the farm buildings associated with Barracks Farm. The planning statement advises that the turbine would be operational for 25 years from the first generation of electricity on site, after which the turbine would be removed and the site restored.

1.2The proposed wind turbine would be a ‘EWT DirectWind 54*500’s. It would have: Hub height: 50 metres; Rotor diameter: 54 metres; Maximum tip height: 77 metres; Number of blades: 3; Output rating: 500 kW.

1.3Access to the site would be from Forest Lane (B6011) which is an existing tarmac road. The junction access from Forest Lane is proposed to be upgraded as part of the proposed development. The junction with the highway would be increased to provide a 20 metre radius for construction HGV’s.

1.4A new access track is proposed from the existing farm access track following the edge of the field in which the turbine is proposed and will run to the base of the turbine. The length of the new access track would be approximately 356 metres with a total area of 0.15 hectares. 1.5 An electricity substation is proposed to the north of the proposed wind turbine. Indicative plans and elevations have been submitted with the application for future approval reserved by condition. The parameters set by the plans submitted would be: 3.5 metres wide, 6.5 metres long, with a ridge height of 3 metres.

1.6The wind turbine foundations would be constructed in concrete and depend on site geology. Site survey work would be undertaken to determine which type of foundation would be suitable. The tapering tower would have a footprint diameter of 3.6 metres at the base and 1.92 metres at the nacelle (a cover housing containing the generating components of the wind turbine).

1.7To the north of the proposed wind turbine there would be a temporary 40 metre x 25 metre hardstanding area for construction vehicles and cranes.

1.8The wind turbine would be assembled onsite and lifted into position by cranes. Once the turbine has been erected any damage or disturbance created by construction traffic, foundations or cabling would be repaired.

1.9The turbine would produce 1,600 MWh of electricity per annum (assuming 95% availability). Using figures taken from Defra/DECC’s GHC conversion factors for company reporting, published in August 2011 (0.5246 kg CO2/kWh), it is indicated that the turbine would achieve carbon savings of 839,360kg of CO2 pa or a 20,984,000 kg of CO2 over 25 years (minimum guaranteed lifetime of turbine).

2.0The Site and its Surroundings

2.1The proposed wind turbine would be located in a rural location approximately 340 metres to the east of ‘The Old Granary’ building associated with Barracks Farm. The Ordnance Survey grid reference for the site is SK 55683 52016.

2.2The application site is located on a working farm, Barracks Farm. It is situated within the designated Green Belt of Nottinghamshire. Barracks Farm has acreage of 648ha which is in arable rotation.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Application No. 2014/0556- Barracks Farm, Forest Lane, Papplewick, NottinghamshireReport 294 KB DownloadRead as text

At this meeting

Whole meeting
243Application No. 2014/0915- A612 Burton Road/B684 Mapperley Plains, Gedling/Arnold, Nottinghamshire.Decided
244Application No. 2014/0556- Barracks Farm, Forest Lane, Papplewick, NottinghamshireThis decision

Who was there

19 of 26 attended
JT
Councillor John TruscottChair, present
BM
Councillor Barbara MillerVice-Chair, present
PA
Councillor Pauline AllanCommittee Member, present
RA
Councillor Roy AllanCommittee Member, present
PB
Councillor Peter BarnesCommittee Member, present
CB
Councillor Chris BarnfatherCommittee Member, present
DB
Councillor Denis Beeston MBECommittee Member, present
AB
Councillor Alan BexonCommittee Member, present
JB
Councillor John BootCommittee Member, present
GC
Councillor Ged ClarkeCommittee Member, present
BC
Councillor Bob CollisCommittee Member, present
AE
Councillor Andrew EllwoodCommittee Member, present

All 26 on the meeting page

More from Gedling Planning Committee

All decisions
MeetingDecisionOutcome
14 Oct 2026 To approve, as a correct record, the minutes of the meeting held on 9 September 2026That the minutes of the above meeting, having been circulated, be approved as a correct record. Approved Open
14 Oct 2026 Application no. 2026/0501 - Richard Herrod Centre, Foxhill Road Central, Carlton, NottinghamshireTo Grant Planning Permission: Subject to the conditions listed for the reasons set out in the report. Conditions The ... Approved Open
14 Oct 2026 Appeal Summary Ref: 6014560 - 31 Mansfield Road, Daybrook, NottinghamshireTo note the information. Noted Open
14 Oct 2026 Appeal Summary Ref: 6013777 - 6 Pateley Road, Woodthorpe, NottinghamshireTo note the information. Noted Open
14 Oct 2026 Future planning applicationsTo note the information. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies