Resolved
That a decision be taken on each application for planning consent as detailed below: 18/00181/FULL CONVERSION OF BOAT STORE TO FORM TWO-BEDROOM DWELLING AND EXTERNAL ALTERATIONS (CONSERVATION AREA) (RESUBMISSION 18/00039/FULL) (as amended by plans received 11.6.18) Land To The Rear Of 134 Priory Road Gosport Consideration was given to the report of the Head of Planning and Regeneration r equesting that consideration be given to planning application 18/00181/FULL. The Board was updated that a further letter had been received from an existing objector raising concerns about the impact of alterations to the existing boundary treatment and the lack of any structural survey. Officers advised the Board that the matters raised in the further objection were in part addressed within the Officer’s report to the Regulatory Board and also related to matters dealt with under the Building Regulations and the Party Wall Act. The Officers recommendation was unchanged. [name removed] was invited to address the Board, he advised that he lived at 33 Green Lane, to the south of the site and was most affected by the proposal. He advised that he had four issues with the proposal, the shape and size of the site for the proposal, the lack of justification for the proposal, the overlooking that the proposal would present to 33 Green Lane and the additions and alterations to the proposal that they as neighbours had not been made aware of. Members were advised that the frontage of the property was 11.5 metres, but that this tapered to 4.5 metres at the rear of the site. This was half the size of the frontage and the boatshed had been squeezed into the gap, adjacent to the patio of number 33 Green Lane. The Board was advised that the proposal to construct the property by converting the existing building would give a garden size that was far smaller than the recommended 10.5 metres, and that once landscaped the size would reduce even further. He advised the Board that the existing building had no value and was in a state of disrepair and the proposal to redevelop it in to a property was unacceptable. No survey of the existing property had been undertaken to establish if it was feasible to develop , convert and extend the building. He also felt that it was unacceptable that the current building was dictating the proposal. [name removed] advised the Board that the proposal failed to meet policy LP10 of the Gosport Borough Council Local Plan as the proposal was poor in design, the location of it was wrong, and that it failed to improve the quality of the area. He advised the Board that there would be an impact on the property at 33 Green Lane, and that no sectional drawing of the roof light had been provided, and that despite the removal of the dormer window and the proposal to now include ... view the full minutes text for item 7.