Resolved
That a decision be taken on each application for planning permission as detailed below. 21/00294/FULL RETENTION OF AND FURTHER WORKS FOR THE ERECTION OF REAR DORMER WINDOW (CONSERVATION AREA) (as amplified by letter dated 29.06.21 and plans received 01.07.21) 20 Atkinson Close Gosport Hampshire PO12 2BZ Consideration was given to a report of the Development Manager detailing planning application 21/00294/FULL Officers provided an update to this application advising Members that an amended plan had been received to correctly show the as-built situation. This amends two key dimensions referred to in paragraph 3 of the site and proposals section of the report. These are: the width of the dormer window reduced from 7.1m to 6.3m and, as a result the separation to the side elevations is increased to approximately 1.8m. The recommendation remains unchanged. [name removed] was invited to address the Board. [name removed] provided a pictorial handout as part of his deputation. Firstly, I am sorry that I am here speaking to you today because it was never my intention to breach planning rules. That is why I hired a professional architect who told me that the work did not require a planning application as it fell within permitted development rights. The first time I found out that we needed planning permission was when [name removed], the planning enforcement officer knocked on my door. This is also the first time that I even became aware of the Conservation Area. By this time, most of the building work had been completed and the outer shape of the dormer was already in place. The moment I found out, I halted all the work and had a planning application submitted. During the build our house suffered considerable internal damage while the roof was open due to the heavy winds and rain in late May. All of our upstairs ceilings have severe water damage, a bedroom and bathroom ceiling collapsed, floors and carpets have been damaged, all the insulation was water logged and has been removed and our electrics are still not fully working, and there was even water damage to the ceilings downstairs. We are disappointed that the recommendation is to refuse the planning application. Whilst our dormer will look a little different from the others, such variations are common in similar developments; and identical style dormers to ours can be found all over the Conservation Area. I went out of my way to insist our building firm used materials that are sympathetic to the rest of the modern housing estate. This is not heritage architecture, but a 1990s housing estate. I serve in the Armed Forces, my wife is a teacher at a Gosport school and my children attend a Gosport school. My current posting which is permanently based away from here, holds me at very high readiness to deploy anywhere in the world for crisis response. All the time. I have had to drive ... view the full minutes text for item 68.