Item88
Resolved
Resolved that application GR/06/700 be DELEGATED to the Director (Planning and Regeneration) for the issue of a PERMISSION subject to:- (i) correction of the ownership certification; (ii) negotiation to secure the design and construction of a footway across the frontage of the site; (iii) proper indication of the public right of way; and (iv) the imposition of the following conditions:- (1) the development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which this permission is granted; (2) notwithstanding the provisions of the Town and Country Planning (General Permitted Development) Order 1995 no windows, doors or other openings shall be formed at any time in the northern elevation of the extension hereby permitted; (3) the following details shall be submitted to and approved in writing by the District Planning Authority before any works are commenced:- (a) detailed drawings to a scale of not less than 1:50 of the entrance canopy to be provided on the southern elevation of the new building; (b) detailed drawings to a scale of not less than 1:50 showing brick heads and surrounds on the southern elevation at ground and first floor levels; (c) details of all new boundary treatments to the site, including all walls, fences and other means of enclosure; (d) samples of all external materials and surfaces to be used on the development; (e) details of all rainwater goods to be installed; (f) details of the refuse storage area; (g) details of slab levels of the proposed building in relation to adjoining dwellings; (h) physical demarcation and protection of the public right of way. The details submitted and approved in accordance with items (a) to (f) above shall be implemented to the satisfaction of the District Planning Authority before the premises hereby permitted are first occupied. (4) the area shown on the submitted layout plan as car parking spaces shall be laid out in accordance with the approved scheme an thereafter kept available at all times for such use, and no development whether or not permitted by the Town and Country Planning (General Permitted Development) Order 1995 or not, shall be carried out on that area of land or in such a position as to preclude its use for parking; (5) visibility splays of 2 metres by 2 metres shall be provided at the junction between the site and Whitepost Lane prior to commencement of any other works on site, and thereafter maintained free of all obstruction over a height of 0.6 metres above the level of the adjoining highway; (6) a landscaping scheme, including details of surface treatments, and the planting of trees, hedges, shrubs and grassed areas shall be submitted to and approved in writing by the District Planning Authority before any works ... view the full minutes text for item 88.
Word for word from the decision Gravesham published for this meeting.
Source: democracy.gravesham.gov.uk