Resolved
Resolved that application GR/07/118 be PERMITTED subject to:- (1) the development to which this permission relates must be begun not later than the expiration of three years beginning with the date on which this permission is granted; (2) the development hereby permitted shall be carried out in its entirety and shall only accord with the approved plans and particulars or any details or drawings subsequently approved in writing by the Local Planning Authority pursuant to any condition hereinafter contained and there shall be no deviation therefrom , save with the prior written permission of the Local Planning Authority; (3) t he development hereby permitted shall be used as dry silo mortar plant and associated bagging plant and for no other purpose including any other purpose within classes B2 and B8 of the Town and Country Planning (Use Classes) Order 1987, as amended; (4) the maximum total combined output for all mortar products either in bulk or bagged form produced at the site shall not exceed 150,000 tonnes per annum; (5) at least 50 per cent of the sand used in the manufacture of mortar shall be derived from sands from the existing adjoining aggregate operations at Denton Wharf , Mark Lane ; (6) notwithstanding the provisions of Article 3 of and Part 8 (Classes A-D) of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 1995, as amended, or in any provision equivalent to that Class in any Order revoking or re-enacting that Order, no extension or alteration of the plant and buildings including the installation of additional or replacement plant and machinery or provision of other apparatus, private way or conveyor for an industrial process, additional hard standings or deposit of waste shall be carried out without the prior written permission of the Local Planning Authority having first been obtained; (7) details and samples of the external facing materials including colours of the buildings and plant to be erected on the site shall be submitted to and approved in writing by the Local Planning Authority; the development shall be carried out in accordance with the approved details; (8) HGV movements associated with the use hereby permitted shall be restricted to between the hours of 0500 and 2000 hours on weekdays, between 0500 and 1530 hours on Saturdays and not at all on Sundays and Bank or Public Holidays; (9) the rating level of the noise emitted from these premises (other than noise from the exit or entry of road vehicles), shall not exceed the existing background noise level by more than 3 dB. The noise levels shall be determined at the façade of the Metropolitan Police Specialist Training Centre facing the Dry Silo Mortar Plant and the façade of the National Sea Training College facing the Dry Silo Mortar Plant. The measurements and assessments shall be made according to BS4142:1997; (10) n o development shall take place until details of ... view the full minutes text for item 28.