Report to: Joint Transportation Board
Date: 16th December 2009
Reporting officer: Head of Countywide Improvements, Kent Highway Services
Subject: Highway and Transportation Schemes Progress Report – 2009/10 Purpose and summary of report: This report advises members of the progress of highway and transportation schemes in Gravesham.
Recommendations: For information and comment.
1. Background and Discussion.
1.1For each programmed and funded highway improvement scheme in Gravesham, Appendix 1 summarises progress to date and anticipated progress prior to the next meeting of this Board.
1.2Following successful drives for efficiency in KCC, it has proved possible to make sufficient savings to afford to resurface some additional roads in Gravesham. Green Lane in Meopham, Lower Rd in Northfleet and Alanbrooke, St Francis Avenue St Johns Road and Barr Rd in Gravesend were resurfaced in November. Two more roads (parts of Wrotham Road and Springhead Road will be resurfaced in the new year, as describer in Appendix 1).
BACKGROUND DOCUMENTS: The background papers pertaining to this report are held on the Kent Highway Services files.
All requests to inspect the above documents MUST be directed in the first instance to the Committee Section of the Democratic Services Department
Contact Officers: See last column in Appendix 1 (tel 08458 247 800). Highway and Transportation Scheme Progress Report – 2009/10: APPENDIX 1
Forecast Out- Kent Highway
allocation
2009 --- 10 2009 - 10 KHS Location Description of Works Current Progress Anticipated Actions for
Original Services
turn Ref next 3 months Contact (Prior to next JTB) 08458 247800
drainage improvements Works were scheduled to 07-ITS- London Road None --- this job will no longer Andy to footway outside Post have been completed on 30 £0K £9K GR-X1 Northfleet be reported to this Board Padgham Office November
Wellington Street / Reverse direction of to reduce disruption, actual 08-ITS- EdF works are now complete Peacock Street, one-way traffic in both traffic reversal has been £8K £11K Geoff Dance GR-03 and work is ready to start Gravesend roads delayed until January 2010
New pram ramps and 09-ITS- Various Roads, other footway improve- Works are scheduled to have None--- this job will no longer £50K £25K Helen Cobby GR-03 Boroughwide ments to improve been completed on 4 be reported to this Board mobility December 2009
order placed with PIPS 1) traffic light Technology for automatic ANPR cameras to be Town Centre optimisation number-plate recognition installed in January 2010 Gravesend (ANPR) cameras 09-ITS- Urban traffic a) KCC and GBC officers to £125K £125K Sue Westwood GR-04 2) link the Traffic management Management Centre to Memorandum of understanding agree MoU terms and control system (MoU) between Gravesham b) KCC and GBC to procure improvements: Gravesham Borough and Kent is in 1st draft stage installation of Council's CCTV room communications link Forecast Out- Kent Highway
allocation
2009 --- 10 2009 - 10 KHS Location Description of Works Current Progress Anticipated Actions for
Original Services
turn Ref next 3 months Contact (Prior to next JTB) 08458 247800
Speed limit changes have Main tranche of traffic sign Traffic signs and new Wrotham Road, been advertised and minor improvements due February 09-ITS- speed limits to better Meopham & modifications made to detailed 2010 (subject to police £50K £55K Julian Cook GR-05 manage speed and Istead Rise design 1st phase of traffic sign approval of speed limit traffic management improvements boundaries)
Reduce hazards for Scheme to provide proper pedestrians walking over Interim measures to reinstate footway on bridge will be 09-ITS- Sole Street railway bridge safer pedestrian area on bridge developed as a contender for £0 £3K Helen Cobby GR-X1 Scheme added Sept were carried out in October funding as part of the 2010- 2009: 11 local transport plan
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Highway and Transportation Schemes Progress Report 2009/10Report | 40 KB | DownloadRead as text |
Follow Gravesham Joint Transportation Board at Gravesham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 10 Mar 2021 | Bath Street - Fastrack Infrastructure SchemeResolved that the report be noted. | Noted | Open |
| 10 Mar 2021 | Highway Forward Works Programme - 2019/20 onwardsResolved the report be noted. | Noted | Open |
| 10 Mar 2021 | Issues raised by Councillors with the approval of the ChairIt was agreed that the results of the ATC be shared with Cllr Rana. It was noted that the officer had previously disc... | Agreed | Open |
| 14 Mar 2018 | Gravesham Highway Works Programme 2017/18Resolved that the Board noted the information contained within the report and agreed the following: · The Gravesham D... | Noted | Open |
| 14 Mar 2018 | Petitions from residents at the JTB (KCC Petition Scheme)Resolved that the Board look at the original JTB Legal Agreement between KCC and GBC with the view to amending it to ... | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.