Report to Planning and Regeneration Cabinet Committee
Classification: Key Decision:
Gravesham Borough Council
Report to: Planning and the Environment Committee
Date: 12 June 2013
Reporting officer: Director (Housing and Regeneration)
Subject: Lower Thames Crossing consultation
Purpose and summary of report: Department for Transport (DfT) has issued a consultation on the potential corridors for additional crossing capacity of the Thames at Dartford, Swanscombe and east of Gravesend. A presentation will be given explaining the options. DfT have provided a set of consultation questions. Recommendations: Member’s views on the DfT questions (but not limited by them) are requested to assist Cabinet in making the Council’s response to the consultation.
1. Introduction
1.1On 21 May 2013 the Department for Transport (DfT) issued a consultation on the Options for a New Lower Thames Crossing. This is accompanied by a series of technical reports (see list in background papers). This work builds on the Parsons Brinckerhoff study of 2009 which identified three corridors worthy of further examination (see plan in Appendix 2), namely:
• A: Dartford Crossing
• B: Swanscombe Peninsula
• C: East of Gravesend
o Variant with A229 improvement as well (Bluebell Hill)
1.2A response is due by 16 July and a report will be considered by Cabinet on 8 July 2013.
1.3The Borough Council position was set by Cabinet on 1 June 2009 following the publication of the Parsons Brinckerhoff report that :
(1) the Borough Council welcomes the recently published work on taking the issue of the Lower Thames Crossing forward and that it expects to be centrally involved in any further study work which must look inside as well as outside London; (2) any route on the alignment of route C is not acceptable on environmental grounds, whatever the costs; (3) short term options for boosting capacity of the existing crossing are welcomed and should include abolition of the tolls 1.4 Council on 26 April 2011 passed two motions against a route east of Gravesend. On 10 June 2011 whilst considering the Local Transport Plan and associated documents, where the County Council was supporting a route east of Gravesend, Cabinet resolved that “the Borough Council reaffirms its opposition to any Lower Thames Crossing route that runs through east Gravesham”.
1.5The Council has been involved in a Stakeholder Advisory Panel meetings held by DfT, attended by the Director (Housing & Regeneration), as the technical work has proceeded but this has not involved any part in decision making. The Borough Council’s position has been made clear.
1.6The free flow scheme at the existing Dartford Crossing with the Toll Booths removed, but the toll remaining, is due to be implemented in 2014.
2. Presentation
2.1The consultation has only just been received at the time of writing so there has not yet been sufficient time to evaluate the technical reports (see list in Background documents). A presentation will be given setting out the options and the supporting information to inform Members discussion of the issue.
2.2From the point of view of the Borough Council the obvious issues are whether the technical reports:
• In any way alter the view previously taken
• Whether the technical information actually supports the Borough’s position
3. Consultation Questions
3.1Dft has posed 6 questions:
1. Do you agree there is a strong case to increase road-based river crossing capacity in the Lower Thames area?
2. Which of the following locations options for a new crossing do you prefer?
a. Option A: at the site of the existing A282 Dartford – Thurrock crossing
b. Option B: connecting the A2 [Ebbsfleet] with the A1089
c. Option C: connecting the M2 [and A2] with the A13 and the M25 between junctions 29 and 30
d. Option C variant: as Option C plus additionally widening the A229 between the M2 and the M20
2 e. Other
3. Please indicate how important the following factors were in influencing your preference for the location of anew crossing, in answer to Q2. Please mark whether they were very important, important or not important.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Planning and Regeneration Cabinet Committee at Gravesham and we tell you when its next papers are published, before the meeting rather than after it.
Review of Taxi Tariff for Gravesham1) Subject to the statutory advertising and consultation process; to replace the current two-tier taxi tariff structu...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.