Kent County Council Local Transport Plan 4: Delivering Growth without Gridlock (2016 2031) (Consultation Draft)
DecidedCommittee1 paper
Gravesham Joint Transportation Board decided this item on Wednesday 14 September 2016. Below is the council's own wording, with the papers it was decided on.
Resolved that the Board’s opposition to the Lower Thames Crossing (LTC) east of Gravesend be resubmitted to Kent County Council (KCC) as part of the consultation and that KCC be requested to remove reference to the LTC east of Gravesendfrom the map or the heading of the map be changed from ‘Gravesham’s Transport Priorities’ to ‘KCC’s Transport Priorities for Gravesham’.
Word for word from the decision Gravesham published for this meeting.Source: democracy.gravesham.gov.uk
Kent County Council (KCC) has a statutory duty to have a Local Transport Plan (LTP). The current LTP3 (2011-16) needs to be replaced. This report introduces the draft LTP4 (2016-31). It incorporates a refresh of Growth without Gridlock (Kent’s Transport Delivery Plan) and will be aligned with the Kent and Medway Growth and Infrastructure Framework (GIF) and the South East Local Enterprise Partnership’s (SELEP) Strategic Economic Plan (SEP). In addition, transport strategies that support districts’ Local Plans should have regard for the policies and priorities within LTP4.
The LTP4 sets out nationally important strategic priorities (such as a new Lower Thames Crossing and a solution to Operation Stack), countywide priorities and priority transport schemes in each district. The local priorities pages for each district have been developed through close working with the district/borough councils. Kent-wide priorities (such as road safety, highway maintenance, and our policy on aviation) are also prominent in the LTP, as is an explanation of funding sources and how LTP4 will be used as a basis to bid for future funding streams and investment.
The draft LTP is currently undergoing a statutory 12-week public consultation alongside a Strategic Environmental Assessment (SEA) report and an Equality Impact Assessment (EqIA). Following the consultation, a revised LTP4 will be adopted by KCC in 2017. Key stakeholders, including district councils, are encouraged to take part in the consultation at www.kent.gov.uk/localtransportplan
Background
1.1This report details the purpose and contents of Kent County Council (KCC)’s draft Local Transport Plan 4: Delivering Growth without Gridlock, and focuses on the priorities for Gravesham. KCC invites the JTB to consider responding to the consultation.
1.2KCC is in the process of developing a new Local Transport Plan, to replace the current Local Transport Plan (LTP3) 2011-16. Under the Local Transport Act 2008, it is a statutory requirement for KCC to have a Local Transport Plan (LTP) in place. The LTP is a critical tool in supporting and facilitating sustainable growth and in assisting Kent to attract investment from national government to priority transport schemes. It is thus vital that KCC has a robust LTP in place.
1.3The existing LTP3 is a five year plan (2011-16), and as such, is relatively short-term in horizon and focus. The current refresh provides an opportunity to produce a new longer- term plan, enabling KCC to take a strategic view of transport to better support the county’s growth ambitions. By spanning the period to 2031, LTP4 will align with the Kent and Medway Growth and Infrastructure Framework (GIF). 1.4 KCC has also taken the opportunity to integrate LTP4 with Kent’s transport delivery plan, Growth without Gridlock (GwG). GwG was produced in December 2010, separate to LTP3 and set out the strategic aims for transport to support economic growth in Kent over a 20- year period. Many of the ambitions of that strategy have been achieved or significant progress made in the six years since publication, so LTP4 recognises this progress and reaffirms and refreshes KCC’s strategic transport priorities. Therefore, KCC will have one transport policy document covering both strategic and local transport priorities.
1.5Critically, the GIF has fed into LTP4. The GIF identifies the county’s infrastructure needs to support planned growth to 2031 and is an important evidence base for LTP4. Transport priorities identified in LTP4 reflect those identified in the GIF and therefore provide a clear link between such transport priorities and the growth agenda.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.