Resolved
Resolved that application 20211215 be APPROVED subject to the following conditions and informatives:- Conditions Time Limit 1. The development hereby approved shall be begun not later than 3 years following the date of this permission. Reason: In pursuance of Section 91 of the Town and Country Planning Act 1990, as amended by Section 51 of the Planning and Compulsory Purchase Act 2004. Approved Plans 2. The development hereby permitted shall be carried out in accordance with the following approved plans and documents: Application form received 4 October 2021; Planning Statement received 4 October 2021; Design and Access Statement received 4 October 2021; Tree Survey received 4 October 2021; Surface Water Storage Requirements for Sites received 4 October 2021; UKsuds Attenuation Storage Analysis Received 4 October 2021; Drawing no. 01 (Site Location Plan) received 4 October 2021; Drawing no. 04 (Proposed Site Plan) (excluding trees) received 4 October 2021; Drawing no. 05 Rev. C (Proposed Ground Floor Plan) (excluding trees) received 4 October 2021; Drawing no. 06 (Proposed Roof Plan) (excluding trees) received 4 October 2021; Drawing no. 10 (Proposed Elevations) received 4 October 2021; Drawing no. 11 (Proposed Courtyard Sections) received 4 October 2021; Drawing no. 20 (Existing Site Plan) received 7 October 2021; Drawing no. 21 (Existing Floor Plans) received 7 October 2021; Drawing no. 25 (Existing Elevations) received 7 October 2021; Drawing no. 26 (Existing Sections) received 7 October 2021; and Surface Water Drainage Strategy (ref. no. 531921 dated 22 February 2022) received 28 February 2022. Reason: For the avoidance of doubt and in the interests of proper planning. Prior to Commencement Tree Protection Details 3. Notwithstanding the submitted plans and particulars, no site clearance or development shall take place until there has been submitted to and approved in writing by the Local Planning Authority details of all trees to be retained and removed in the form of an arboricultural impact and method statement and detailed drawings, including: (a) the specification and position of fencing and other measures such as temporary surfacing, for the protection of the roots and crown spread of trees, groups of trees and other vegetation to be retained on and adjoining the site (including in the north-east corner of the application site). Protective fencing should accord with the recommendations of BS 5837:2005 'Trees in Relation to Construction'; (b) the programme for the erection and maintenance of protective fencing and the installation of any other protective measures; such programme will include details of supervision by an arboriculturist; (c) details of any proposed alterations in existing ground levels and of the position of any proposed excavation and constructional details of any drainage, hard surfacing, foundations, walls and similar works within the protected area; (d) details of contractors’ compounds and areas for storage; and (e) schedule of proposed tree works. The details contained in the approved arboricultural impact and method statements shall be thereafter implemented on site and the protective fencing and other protective measures shall be maintained during the course of construction. Reason: To ensure that ...