CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Greater London Authority
Transport Committee, Tuesday 6 September 2011 at 10.00am

Summary List of Actions

Noted Committee 6 papers

Transport Committee noted this item on Tuesday 6 September 2011. Below is the council's own wording, with the papers it was decided on.

Item4

Resolved

That the completed and outstanding actions arising from previous meetings of the Committee be noted.
Word for word from the decision Greater London Authority published for this meeting. Source: meetings.london.gov.uk

Follow this further

Built from Greater London Authority's papers

What the report saysPro

Report to Transport Committee

Subject: Summary List of Actions Report to: Transport Committee

Report of: Executive Director of Secretariat Date: 6 September 2011

This report will be considered in public

1. Summary 1.1 This report sets out the actions arising from previous meetings of the Transport Committee.

2. Recommendation 2.1 That the Committee notes the completed and outstanding actions arising from previous meetings of the Committee.

Action arising from the Committee meeting on 25 July 2011

Item Topic Status For Action

5. State of the London Underground In progress. The Chair of IIPAG

To supply the Committee with the Independent Investment Programme Advisory Group (IIPAG) report on the cost effectiveness of using block closures or engineering hours to upgrade the Tube.

Action arising from the Committee meeting on 14 July 2011

Item Topic Status For Action

6. High Speed Rail Scrutiny officers advised The Head of Public verbally that details of the Affairs, Network Rail To supply the Committee with details of operational capacity of the operational capacity of Euston Euston Station during the Station during its proposed re-building proposed re-building are not

City Hall, The Queen’s Walk, London SE1 2AA Enquiries: 020 7983 4100 minicom: 020 7983 4458 www.london.gov.uk Item Topic Status For Action

as part of the HS2 development. yet available.

6. High Speed Rail Response attached at Director of Strategy Appendix 1. and Policy, TfL To supply the Committee with information on the estimated costs for:  The re-development of Euston station;  Any additional transport infrastructure needed to maximise the effectiveness of the proposed interchange at Old Oak Common; and  Any additional environmental mitigation (eg tunnelling), for HS2’s route through west London.

6. High Speed Rail Letter issued to the Secretariat Department for Transport That the Chair write to express the (Appendix 2). Committee’s discontent that no representatives of the Department for Transport had accepted the Committee’s invitation to attend the meeting.

Action arising from the Committee meeting on 14 June 2011

Item Topic Status For Action

5. State of the London Underground In progress. Deputy Mayor for Transport To supply the Committee with a written list of areas that the Deputy Mayor for Transport has responsibility for and areas that Daniel Moylan, as Deputy Chair of Transport for London, has responsibility for. List of appendices to this report: Appendix 1 – Response of the Director of Strategy and Policy, TfL Appendix 2 – Committee letter to the Department for Transport

Local Government (Access to Information) Act 1985 List of Background Papers: Minutes of the Committee meeting 14 June, 14 July and 25 July 2011.

Contact Officer: John Barry Telephone: 020 7983 4425 E-mail: [email protected]

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Summary List of Actions: Appendix 1Appendix 278 KB Download
PDF
Summary List of Actions: Appendix 2Appendix 46 KB Download
PDF
Summary List of ActionsReport 76 KB DownloadRead as text
PDF
View as DOC (4./2) 31 KBAppendix 1 pages Download
PDF
View as DOC (4./3) 96 KBAppendix 1 pages Download
PDF
View item 4. as DOC 88 KBReport 1 pages Download

At this meeting

Whole meeting

On this subject at Greater London Authority

Search all
  1. Summary List of ActionsThis decision
  2. Summary List of ActionsNoted
  3. Summary List of ActionsNoted
  4. Summary List of ActionsNoted
  5. Summary List of ActionsNoted
  6. Summary List of ActionsNoted

More from Greater London Authority Transport Committee

All decisions
MeetingDecisionOutcome
14 Jul 2026 Declarations of InterestsThat the list of offices held by Assembly Members, as set out in the table at Agenda Item 2, be noted as disclosable ... Noted Open
14 Jul 2026 MinutesThat the minutes of the meeting of the Transport Committee held on 9 June 2026 be signed by the Chair as a correct re... Decided Open
14 Jul 2026 Summary List of ActionsThat the ongoing actions arising from previous meetings of the Committee, and the additional correspondence sent, be ... Noted Open
14 Jul 2026 Transport Committee Work ProgrammeThat the Committee’s work programme , and the additional activity undertaken since its last meeting, namely the site ... Decided Open
24 Jun 2026 Declarations of InterestsThat the list of offices held by Assembly Members, as set out in the table at Agenda Item 2, be noted as disclosable ... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies