CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Greater London Authority
Transport Committee, Tuesday 6 September 2011 at 10.00am

London and South East Route Utilisation Strategy

Noted Committee 4 papers

Transport Committee noted this item on Tuesday 6 September 2011. Below is the council's own wording, with the papers it was decided on.

Item7

Resolved

Resolved : That the publication of the London and South East Route Utilisation Strategy be noted.
Word for word from the decision Greater London Authority published for this meeting. Source: meetings.london.gov.uk

Follow this further

Built from Greater London Authority's papers

What the report saysPro

Report to Transport Committee

Summary

1.1This report provides background information to the Transport Committee in relation to Network Rail’s final Route Utilisation Strategy (RUS) for London and the South East.

2. Recommendation 2.1 That the Committee notes the publication of the London and South East Route Utilisation Strategy.

Background

3.1The Committee submitted a response to the consultation on Network Rail’s draft Route Utilisation Strategy for London and the South East on 9 March 2011. The draft RUS set out proposals designed to boost rail capacity in and around London in the next twenty years. The final RUS was published on 28 July 2011 and will serve as a basis for the Initial Industry Plan, which in turn will help inform the next High Level Specification Programme. 3.2 The Committee’s consultation response welcomed the long-term strategic view offered by the RUS into demand growth on suburban and inter-city routes into London, as well as more detailed plans for Crossrail and Thameslink. It also identified several areas of concern including:  The ability of Network Rail to meet increasing demand and ease overcrowding, particularly due to uncertainty over levels of funding and growth;  That the current Persons in Excess of Capacity (PiXC) was an inaccurate indicator of the level of overcrowding during the morning rush hour;  The need for more detailed work undertaken at stations to improve facilities, capacity and accessibility;  A desire to see closer integration of TfL and Network Rail’s work to ensure Mayoral policies are included, for example, through giving the Mayor a role in awarding rail franchise agreements; and  The need to ensure that Network Rail or Train Operating Companies provide an equivalent replacement service for discontinued lines.

City Hall, The Queen’s Walk, London SE1 2AA Enquiries: 020 7983 4100 minicom: 020 7983 4458 www.london.gov.uk 4. Issues for Consideration

4.1Following submission of the Committee’s response, a meeting was held with representatives of Network Rail to discuss some of the main issues raised by Members on 19 April 2011 (please see Appendix 1 for further details). The final RUS was published on 28 July 2011.

4.2There were few significant changes made to the final draft of the RUS. More work was undertaken to refine the estimates for demand growth, as well as Network Rail’s ability to meet that growth within the current economic climate. It also continues to use the PiXC measure for over-crowding, despite the Committee’s reservations about its accuracy. Some of the specific interventions mentioned by the Committee, including station refurbishment, electrification of the Gospel Oak to Barking line, and the reintegration of the former Eurostar platforms at Waterloo are either planned for completion at by the end of the year or will be brought forward under the next High Level Output Specification programme (HLOS 5) in 2012.

4.3Despite the investment outlined in the RUS, overcrowding will continue to be an issue over the coming decade. Interventions on some of the most crowded lines (eg South Western services out of Waterloo) have yet to be identified but will be complex and expensive. The RUS also states that the construction of HS2 is essential to ensuring the long-term viability of the West Coast Main Line, as well as improving inter-city connectivity and west London suburban routes. Network Rail will continue to work closely with TfL to ensure their strategic planning is coordinated and supportive.

4.4Following publication, Network Rail will undertake a series of meetings with Members to discuss specific and local concerns about the final RUS. The Committee may also return to rail network issues, such as proposals for the next HLOS, as part of its work programme in January 2012.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
London and South East Route Utilisation Strategy: Appendix 1Appendix 68 KB Download
PDF
London and South East Route Utilisation StrategyReport 72 KB DownloadRead as text
PDF
View as DOC (7./2) 56 KBAppendix 3 pages Download
PDF
View item 7. as DOC 74 KBReport 2 pages Download

At this meeting

Whole meeting

More from Greater London Authority Transport Committee

All decisions
MeetingDecisionOutcome
14 Jul 2026 Declarations of InterestsThat the list of offices held by Assembly Members, as set out in the table at Agenda Item 2, be noted as disclosable ... Noted Open
14 Jul 2026 MinutesThat the minutes of the meeting of the Transport Committee held on 9 June 2026 be signed by the Chair as a correct re... Decided Open
14 Jul 2026 Summary List of ActionsThat the ongoing actions arising from previous meetings of the Committee, and the additional correspondence sent, be ... Noted Open
14 Jul 2026 Transport Committee Work ProgrammeThat the Committee’s work programme , and the additional activity undertaken since its last meeting, namely the site ... Decided Open
24 Jun 2026 Declarations of InterestsThat the list of offices held by Assembly Members, as set out in the table at Agenda Item 2, be noted as disclosable ... Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies