IMPLEMENTING THE FIVE YEAR ENVIRONMENT PLAN UPDATE
NotedCommittee3 papers
Greater Manchester 5 Year Environment Plan (5YEP) Partnership noted this item on Friday 18 October 2019. Below is the council's own wording, with the papers it was decided on.
RESOLVED/- 1. That the Partnership noted the progress outlined within the report and the latest position set out in the dashboards attached to the report at Annex 01 (Environment Team Performance Overview) and Annex 02 (5 Year Environment Plan Performance). 2. That Modern Methods of Construction be considered at a future meeting.
Word for word from the decision Greater Manchester Combined Authority published for this meeting.Source: democracy.greatermanchester-ca.gov.uk
Follow this further
Built from Greater Manchester Combined Authority's papers
Report to Greater Manchester 5 Year Environment Plan (5YEP) Partnership
5-Yr Environment Plan Performance 5-Year Environment Plan Priorities Ref Key Priorities (2024) Status Measure % Towards target Commentary E1 Increase local renewable energy (electricity) generation, adding at least a ↑ Green Additional renewable capacity (MW) 11% Work is on-going with Electricity North West (ENWL) to assess how the future energy demand can be met from local renewable sources. Proposals further 45MW by 2024. are being developed for an investment vehicle to deliver renewable energy generation (GM Energy Company). GMCA and LAs have launched Solar Together GM - an collective solar PV/battery purchase E2 Decarbonise how we heat buildings, adding at least a further 10TWh of ↔ Green Additional energy from low carbon heat 80.7 MW of GM accredited renewable heat GMCA and LAs are seeking funding to roll out Local Area Energy planning across the city region and are consulting on proposals to identify 'Heat and low carbon heating by 2024. sources (TWh) ONS measured in MW sources generated in July 2019, up from 80.5 Energy Network Opportunity Areas'. MMU is leading on the development of a Hydrogen Strategy. MW in June 19. E3 Increasing the diversity and flexibility of our electricity supply, adding at ↔ Green Additional flexible and diverse load TBC ENWL continuing to work with stakeholders and national bodies to develop the technical and regulatory framework to transition to a 'Smart Grid'. least a further 45MW of diverse and flexible load by 2024. available (MW) B1 Reduce the heat demand from existing homes with retrofit measures ↔ Red No of whole house retrofits carried out TBC Retrofit report agreed by the Combined Authority in September 2019. GMCA and LAs to convene partners and develop a Greater Manchester retrofit installed on a scale of 61,000 homes per year, achieving 57% reduction partnership/accelerator. in heat loss. B2 Reduce the heat demand from existing commercial and public buildings ↔ Amber Increase in energy certificate ratings D or TBC GMCA and LAs to standardise measures of reporting on efficiency of buildings and aim to obtain a DEC rating of D or better by 2024 for their public with a 10% reduction by 2025. above buildings. B3 Reduce the heat demand in new buildings. ↔ Green TBD TBC In support of this plan, GMHPs have committed to building all new homes to zero carbon in advance of 2028 target as set out in GMSF.Consultants engaged in developing the standard for a pathway to zero carbon new development with refined policies to be incorporated into revised GMSF.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Greater Manchester 5 Year Environment Plan (5YEP) Partnership at Greater Manchester Combined Authority and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.