CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Greater Manchester Combined Authority

LOCAL ENERGY MARKET BID

Noted Committee 1 paper

Greater Manchester 5 Year Environment Plan (5YEP) Partnership noted this item on Friday 18 October 2019. Below is the council's own wording, with the papers it was decided on.

Item8

Resolved

Resolved/- That the update be noted.
Word for word from the decision Greater Manchester Combined Authority published for this meeting. Source: democracy.greatermanchester-ca.gov.uk

Follow this further

Built from Greater Manchester Combined Authority's papers

What the report saysPro

Report to Greater Manchester 5 Year Environment Plan (5YEP) Partnership

PFER: Local Energy Market Proposal The Local Place Based GM Challenge 14.0 Tyndall Budget 12.0 10.0 SCATTER GM pathway, with 8.0 CCS 6.0 Highest Impact Local Actions • Renewables (Solar PV/Thermal, Heat 4.0 networks, Heat Pumps) 2.0 • Energy efficiency of domestic properties - • Improved efficiency of commercial heating and cooling -2.0 • Biomass power generation 2015 2020 2025 2030 2035 2040 2045 2050 • Shift from fossil fuels to battery or fuel cells for transport Outstanding Questions • Shifting domestic transport behaviour • Waste reduction, reuse and recycling a) How quickly will technology evolve e.g. battery storage and hydrogen to grid? b) How do we fund building retrofit for energy efficiency/fuel poverty? c) What is the role of nuclear (SMR) and biomass? d) What opportunities for negative emission and disruptive technology? e) Do we have sufficient skilled workers for the task? …the scale of the GM challenge…

Some examples of the assumptions about now to 2040 in the SCATTER GM model

Half of our homes have solar PV plus a further 5.5km2 commercial/ground-mounted All cars on our roads are zero emissions (tailpipe) by 2035 Gas accounts for less than 35% of heating supply

61,000 homes a year are Industrial emissions reduce by retrofitted 50-75% Commercial heating demand drops by over 20% 4

Informed, validated and Optimised

The GM Local Energy Market (LEM) project aims to reduce and ultimately remove the known challenges through,

1. Informed: Local Area Energy (Master) Planning 1. Urban 2. Semi Urban 3. Rural 4. Across 10 districts and aggregated to a regional level

2. Validated: investment ready business model 1. Operational testing (inc controlled energy assets) 2. Deployment of new assets alongside the leveraging of £10M existing energy related legacy projects

3. Optimised: Digital Energy Platform Design 1. Supporting the control of 7-10MW of energy asset 2. Responding to `place based' constraints market needs 3. At a regional, district, and or micro grid level 5

Informed

Network and local area understanding

Comprehensive Local Area Energy Planning (LAEP), capable of providing, district and aggregated region scale understanding across;

1. Generation and storage 2. Decarbonised heating (Inc. Hydrogen ingress) 3. Low carbon transport (Inc. Hydrogen ingress) 4. Diversity flexibility (current and future possible network constraints)

Supporting the optimisation of the current energy system as we transition to the future. Exploring a range of possible energy system options The current energy networks in Energy networks across Bury Current Future (2040) Bury delivers gas and electricity will transform to support a to homes across the area. low carbon transition. This Gas is currently the dominant will involve: HYDROGEN fuel for heating across Bury. • New hydrogen networks CLUSTER • New heat networks • Decommissioning parts of the gas network, or converting to hydrogen • Increasing capacity of the electricity network

INCREASED SUBSTATIO N CAPACITY

NEW DISTRICT HEAT NETWORKS

6 To develop a Local Area Energy Plan for each borough Your local energy system is changing to meet our commitment to reducing carbon emissions. This means installing new low carbon technologies and phasing out the use of gas boilers. Bury’s 2050 Energy System

Ramsbottom

33% DISTRICT HEATING 67% ELECTRIC HEATING

Bury Town North 32% DISTRICT HEATING 68% ELECTRIC HEATING

Tottington West Bury Town East 60% DISTRICT HEATING 40% ELECTRIC HEATING

74% DISTRICT HEATING 26% ELECTRIC HEATING Tottington Homes with gas boilers may transition to different 49% DISTRICT HEATING heating systems, such as those illustrated below. 51% ELECTRIC HEATING Hollins 54% DISTRICT HEATING 46% ELECTRIC HEATING

Whitefield

GAS BOILER

5% DISTRICT HEATING 93% ELECTRIC HEATING

Electricity Dominated

Radcliffe Prestwich 6% DISTRICT HEATING 17% DISTRICT HEATING 93% ELECTRIC HEATING 83% ELECTRIC HEATING

Districting Heating Ground source District Heating Air source heat Dominated heat pump pump 7 8

Validated

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
LOCAL ENERGY MARKET BIDReport 3.2 MB DownloadRead as text

At this meeting

Whole meeting

Who was there

15 of 26 attended
DQ
Darryl QuantzSubstitute, present
PA
Patrick AllcornCommittee Member, present
EB
Eamonn BoylanOfficer (Full Permission), apologies
HE
Hisham ElkadiCommittee Member, apologies
CM
Chris MatthewsSubstitute, apologies
RM
Roger MilburnCommittee Member, apologies
AQ
Councillor Alan QuinnCommittee Member, present
LR
Lee RawlinsonCommittee Member, present
AS
Anne SelbyCommittee Member, present
AS
Councillor Angeliki StogiaCommittee Member, present
AW
Councillor Andrew WesternChair, present
LB
Louise BlytheCommittee Member, present

All 26 on the meeting page

On this subject at Greater Manchester Combined Authority

Search all
  1. LOCAL ENERGY MARKET BIDThis decision
  2. Local Area Energy Programme - Strategic Outline Business CaseNoted
  3. Domestic Local Energy Advice Demonstrator ProjectNoted
  4. Greater Manchester Local Area Energy PlansNoted
  5. GM Local Energy Market: Design Details (attached)Noted
  6. Funding bids - local energy market bidNoted

More from Greater Manchester Combined Authority Greater Manchester 5 Year Environment Plan (5YEP) Partnership

All decisions
MeetingDecisionOutcome
10 Dec 2020 Dates and Times of Future MeetingsRESOLVED/- That the programme of future meetings be noted. Noted Open
20 Jan 2020 Thematic deep dive - energy (peter emery) (45 minutes)It was agreed that the presentation slide decks would be shared with the Partnership. · A question was raised about L... Agreed Open
20 Jan 2020 Progress report - 5 year environment plan (yep) - paper (mark atherton) (10 minutes)RESOLVED/- That the Partnership noted the progress outlined in the report and the latest position set out in the dash... Noted Open
20 Jan 2020 Progress with challenge groups - paper and presentation (mark atherton) (30 minutes)RESOLVED/- That the Partnership notes the progress in developing the Challenge Groups and the Task and Finish Action ... Decided Open
20 Jan 2020 Transport, air quality and climate change - paper (megan black) (10 minutes)RESOLVED/- The Partnership noted the progress in development the transport elements of the 5 YEP. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies