Greater Manchester Transport Committee noted this item on Friday 8 November 2019. Below is the council's own wording, with the papers it was decided on.
That the Transport Network Performance Report be noted. 2. That it be noted that Arriva Rail North will invite Salford Council officers to their next timetable consultation in relation to services to Southport. 3. That it be noted that First and Diamond Bus will review the impact to passengers as a result of the North Manchester Ticketing Scheme ending as part of their next fare structure review. 4. That information on the impact of short formed trains be included in the Rail Performance Report to the Committee in December.
Word for word from the decision Greater Manchester Combined Authority published for this meeting.Source: democracy.greatermanchester-ca.gov.uk
Follow this further
Built from Greater Manchester Combined Authority's papers
This report provides an overview of Transport Network Performance in Greater Manchester for September 2019.
Recommendations
Members are asked to note the contents of the report.
CONTACT OFFICERS:
Alex Cropper Interim Head of Operations 0161 244 1122 [email removed]
Julie Flanagan COO Sponsor and 0161 244 1164 Support Officer [email removed] Risk Management – not applicable Legal Considerations – not applicable Financial Consequences – Revenue – not applicable Financial Consequences – Capital – not applicable
Number of attachments included in the report: 2
o Appendix A: Glossary o Appendix B: Metrolink Performance o Appendix C: Christmas Services
BACKGROUND PAPERS: Nil
TRACKING/PROCESS Does this report relate to a major strategic decision, as set out in the No GMCA Constitution
EXEMPTION FROM CALL IN Are there any aspects in this report which None means it should be considered to be exempt from call in by the relevant Scrutiny Committee on the grounds of urgency? GMTC Overview & Scrutiny Committee Not applicable Not applicable
GMTC 20191108 Transport Network Performance 2 30/10/2019 17:17 September 2019 v0.4 1 OVERVIEW
1.1The Greater Manchester Transport Committee has a key role to oversee the provision of transport services including the performance of Metrolink, Bus and Rail Operators and the Strategic Highways Network on behalf of residents, businesses and visitors. The Committee also oversees the move towards the Our Network vision for an integrated transport network for Greater Manchester, as set out in the 2040 Transport Strategy.
1.2This network performance report covers performance across all transport modes in Greater Manchester during September 2019.
1.3This report also includes an update (APPENDIX C) on public transport provision during the 2019/20 Christmas and New Year period.
2 OVERALL NETWORK PERFORMANCE SUMMARY
2.1Traffic volumes have increased in September after the summer holiday period and journey time reliability has as a consequence been impacted compared to August. Bus performance has also shown a downward trend, reflecting the trend in journey time reliability on the highway network.
2.2Metrolink performance was poor in terms of both punctuality and operated mileage in the period due to issues surrounding tram availability and reliability.
2.3Period-on-period improvements in Rail PPM and Right-Time performance for all six TOCs, however performance remains lower than in the same period last year.
GMTC 20191108 Transport Network Performance 3 30/10/2019 17:17 September 2019 v0.4 3 NETWORK OVERVIEW
Events
3.1The commencement of the football season including a number of evening fixtures have impacted on the highways network with additional traffic coming into the Regional Centre during the PM peak when the network is operating at near to capacity. At the beginning of the month the Extinction Rebellion protest, which closed off Deansgate and culminated in a day of action on the 2nd September, caused minimal disruption to the network predominantly due to the multi agency planning and mitigation strategies which preceded the event.
3.2The Conservative Party Conference took place between 30 September and 02 October, resulting in a series of road closures and bus diversions, around the venue with a concurrent major Manchester United home fixture on the first evening. The conference attracted a number of protests and marches, which were again planned and mitigated successfully leading to less of an impact on the transport network.
Metrolink
3.1Metrolink Network performance is published on the TfGM.com website, with individual line performance shown in addition to the overall network (APPENDIX B).
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Greater Manchester Transport Committee at Greater Manchester Combined Authority and we tell you when its next papers are published, before the meeting rather than after it.
Minutes of the Sub Committee MeetingsThat the minutes of the Metrolink & Rail Sub Committee held on 3 March 2023 be noted. 2. That the minutes of the Bus ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.