Greater Manchester Transport Committee noted this item on Friday 8 November 2019. Below is the council's own wording, with the papers it was decided on.
That the Highways Annual Performance Report be noted. 2. That information in relation to the evaluated data and future proposals for smart motorways be included in a future highways report. 3. That the outcomes of the evaluation of traffic signal timings in relation to the time allocated for pedestrians to cross be brought back to a future meeting. 4. That TfGM be asked to review whether members of the public are aware as to how to promote traffic signal failures. 5. That TfGM review the status of the bollard issues on Stanley Street in relation to services V1 and V2 and report back directly to Councillor Marshall. 6. That issues in relation to leaving the City Centre via regent Road/Water Street as a result of the temporary closure of Middlewood Street be considered by engineers and reported back to Councillor Marshall. 7. That information on any proposals for ‘implied zebra crossings’ be included in the Mayors Challenge Fund report in January 2020.
Word for word from the decision Greater Manchester Combined Authority published for this meeting.Source: democracy.greatermanchester-ca.gov.uk
Follow this further
Built from Greater Manchester Combined Authority's papers
Provide an overview of Greater Manchester’s Highways’ network performance.
Recommendations
Members are asked to note the performance of Greater Manchester’s Highways’ Network.
CONTACT OFFICERS:
Peter Boulton Head of Highways 0161 244 1411 [email removed] Risk Management – n/a Legal Considerations – n/a Financial Consequences – Revenue – n/a Financial Consequences – Capital – n/a
Number of attachments included in the report: One
o Appendix 1: Monthly Journey Time Reliability for GM Zones
Background papers
TRACKING/PROCESS Does this report relate to a major strategic decision, as set out in the No GMCA Constitution
EXEMPTION FROM CALL IN Are there any aspects in this report which N/A means it should be considered to be exempt from call in by the relevant Scrutiny Committee on the grounds of urgency? GMTC Overview & Scrutiny Committee N/A N/A
GMTC 20191108 Highways Annual Performance Report 2 30/10/2019 17:17 v1.0 1 TfGM’s HIGHWAYS ROLE & CONTROL CENTRE
1.1TfGM Highways
1.1.1 With an estimated 2.5 billion trips made on the Greater Manchester (GM) road network (with an origin and/or destination inside GM) each year, Greater Manchester’s road network is an essential part of GM’s transport infrastructure.
1.1.2 Travel by road (by all modes) in GM comprises approximately 90% of all journeys; the highway network is a critical transport asset on which public transport, freight, business, visitors and commuters rely. A well-managed and maintained highway network is a vital part of creating a prosperous and forward looking regional economy. How the highway network and the traffic on it is managed is also critical to the safety and environmental well-being in GM.
1.1.3 The Local Highway Authorities are responsible for maintaining the safety and usability of roads. These responsibilities are set out in the Highways Act 1980
1.1.4 Transport for Greater Manchester (TfGM) fulfils its highways function, and its obligations delegated by the Greater Manchester Combined Authority (GMCA), primarily by working in collaboration with the 10 GM Local Highway Authorities and Highways England (as the Traffic Authority for the Strategic Road Network), GM Police and road users to achieve a reliable, resilient and safe highway network.
1.1.5 Specific Highway functions undertaken by TfGM are defined by delegations from the GMCA for areas of activity where a regional approach is required. These responsibilities are principally around GM-wide management of the major roads (the Key Route Network1), road safety, network management, traffic signals, urban traffic control (UTC) and intelligent transport systems, traffic forecasting and transport modelling.
1.1.6 The delegations are set out within 4 Protocols between the GM Combined Authority, TfGM and The Association of Greater Manchester Authorities (AGMA) Local Highway / Traffic Authorities.
Protocol 1: Traffic Signals;
Protocol 2: Transport Studies / Forecasting;
Protocol 3: Network Management and Development; and
Protocol 4: Road Safety.
1 TfGM have strategic oversight and management of the Key Route Network which makes up nearly 400 miles of Greater Manchester’s busiest roads. Whilst this is just 7% of the total length of the highways network, it carries some two-thirds of peak-time traffic. 1.1.7 In addition to the Highway Protocols; and under Road Safety, TfGM is also responsible for direct delivery of driver re-training through referrals from GM Police. This is covered under the Memorandum of Understanding (MoU) between TfGM and the former Police and Crime Commissioner (PCC). A separate report is on the Agenda for this meeting covering Road Safety.
1.2TfGM Control Centre
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Greater Manchester Transport Committee at Greater Manchester Combined Authority and we tell you when its next papers are published, before the meeting rather than after it.
Minutes of the Sub Committee MeetingsThat the minutes of the Metrolink & Rail Sub Committee held on 3 March 2023 be noted. 2. That the minutes of the Bus ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.