GREATER MANCHESTER TRANSPORT COMMITTEE METROLINK AND RAIL NETWORKS SUB-COMMITTEE
Date: 11 March 2022
Subject: Metrolink Service Performance
Report of: Danny Vaughan, Head of Metrolink, TfGM
PURPOSE OF REPORT: This report provides an update on Metrolink services and performance.
RECOMMENDATIONS: Members are asked to note the contents of this report.
CONTACT OFFICERS:
Danny Vaughan Head of Metrolink [email removed]
Victoria Mercer Metrolink Service Delivery Manager [email removed] Equalities Implications: n/a
Climate Change Impact Assessment and Mitigation Measures: n/a
Risk Management: n/a
Legal Considerations: n/a
Financial Consequences – Revenue: n/a
Financial Consequences – Capital: n/a
Number of attachments to the report: 3
• Appendix 1: Period date listing • Appendix 2: Patronage by line • Appendix 3: Face covering usage
Comments/recommendations from Overview & Scrutiny Committee: n/a
BACKGROUND PAPERS: Metrolink Service Performance report of 14 January 2022
TRACKING/PROCESS
Does this report relate to a major strategic decision, as set out in the GMCA Constitution? No EXEMPTION FROM CALL IN Are there any aspects in this report which means it should be considered to be exempt from call in by the relevant Scrutiny Committee on the grounds of urgency? No
GM Transport Committee n/a
Overview & Scrutiny Committee n/a 1. ABOUT METROLINK
1.1Metrolink is the largest urban light rail network in the UK. It provides a fast, frequent service which is fully accessible to all, running 7 days a week, 364 days of the year.
1.2The Metrolink network is owned by TfGM and is operated and maintained on TfGM’s behalf through a contract with KeolisAmey Metrolink (KAM).
1.3The network uses high-floor trams with raised platform stops and had reached patronage of over 45 million passengers each year prior to the Covid pandemic.
1.4There are currently 134 trams serviced from two depots.
1.5Trams serve 99 stops covering routes totalling just over 100km. Metrolink is the most accessible of the public transport networks in Greater Manchester, providing step free access across the entire network.
2. PERFORMANCE SUMMARY
2.1The Metrolink Quarterly Performance Report provides a performance summary for the rolling 12-month period.
2.2Enhanced government “Plan B” restrictions had a significant impact upon patronage levels in mid-December. Patronage reduced to circa 41% of pre-Covid levels during the final week before Christmas.
2.3Plan B restrictions, including the requirement to wear face coverings, ceased to be mandatory in indoor public places and on public transport on 27 January 2022. Following the commencement of this change in guidelines, we have subsequently seen a decrease in face covering usage (Appendix 3).
2.4Operational performance during December 2021 and January 2022 held steady compared with recent periods and it remained under target, primarily due to ongoing staff availability issues, which had been a problem across all public transport operations. 2.5 From late January 2022 onwards, Metrolink started to see staff availability return towards pre-Covid levels following the reduction in Omicron cases and the removal of government restrictions. As a result, performance has significantly improved in period 11 (9 January to 5 February 2022).
2.6Planned engineering and renewals works continue in February and March. This includes works by 3rd parties such as Network Rail at Victoria station which impact on Metrolink services.
3. PATRONAGE
3.1Patronage measures the number of single journeys that are being made on the network.
3.2Enhanced government “Plan B” restrictions had a significant impact upon patronage levels from week commening 13 December 2021, which can be seen in the chart below. Patronage reduced to circa 41% of pre-Covid levels during the final week before Christmas, a week which historically would have been one of the busiest weeks of the year on the network.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Greater Manchester Transport Committee at Greater Manchester Combined Authority and we tell you when its next papers are published, before the meeting rather than after it.
Minutes of the Sub Committee MeetingsThat the minutes of the Metrolink & Rail Sub Committee held on 3 March 2023 be noted. 2. That the minutes of the Bus ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.