RESOLVED/- 1) That the be received and noted. 2) That it be noted that Transport for Greater Manchester (TfGM) agreed to feedback directly to Councillor John Vickers on any plans that related to trials of Tram-Trains in the eastern conurbation of Greater Manchester.
Word for word from the decision Greater Manchester Combined Authority published for this meeting.Source: democracy.greatermanchester-ca.gov.uk
Follow this further
Built from Greater Manchester Combined Authority's papers
GREATER MANCHESTER TRANSPORT COMMITTEE METROLINK AND RAIL NETWORKS SUB-COMMITTEE
Date: Friday 03 March 2023
Subject: Metrolink Service Performance
Report of: Danny Vaughan, Head of Metrolink, TfGM
Purpose of Report This report provides an update on Metrolink services and performance.
Recommendations: Members are asked to note the contents of this report.
Contact Officers
Danny Vaughan Head of Metrolink [email removed] Victoria Mercer Metrolink Service Delivery Manager [email removed] Equalities Implications: n/a
Climate Change Impact Assessment and Mitigation Measures: n/a
Risk Management: n/a
Legal Considerations: n/a
Financial Consequences – Revenue: n/a
Financial Consequences – Capital: n/a
Number of attachments to the report: 2
• Appendix 1: Period date listing • Appendix 2: Patronage by line
Comments/recommendations from Overview & Scrutiny Committee: n/a
BACKGROUND PAPERS: Metrolink Service Performance report of 13 January 2023
TRACKING/PROCESS
Does this report relate to a major strategic decision, as set out in the GMCA Constitution? No
EXEMPTION FROM CALL IN Are there any aspects in this report which means it should be considered to be exempt from call in by the relevant Scrutiny Committee on the grounds of urgency? No
GM Transport Committee n/a
Overview & Scrutiny Committee n/a 1. ABOUT METROLINK 1.1 Metrolink is the largest urban light rail network in the UK. It provides a fast, frequent service which is fully accessible to all, running 7 days a week, 364 days of the year.
1.2The Metrolink network is owned by TfGM and is operated and maintained on TfGM’s behalf through a contract with KeolisAmey Metrolink (KAM).
1.3The network uses high-floor trams with raised platform stops and had reached patronage of over 45 million passengers each year prior to the covid pandemic.
1.4There are 147 trams serviced from two depots.
1.5Trams serve 99 stops covering routes totalling just over 100km. Metrolink is the most accessible of the public transport networks in Greater Manchester, providing step free access across the entire network.
2. PERFORMANCE SUMMARY 2.1 The Metrolink Quarterly Performance Report provides a performance summary for the rolling 12-month period.
2.2As expected, patronage numbers decreased during the Christmas holiday period, recovering steadily post-Christmas reaching 85% of the pre-covid patronage average at the end of January 2023.
2.3Commuter trip numbers during the morning and evening peak periods are estimated to have reached 100% of pre-covid equivalent numbers on Tuesdays, Wednesdays and Thursdays.
2.4Weekend trips have broadly returned to 100% of pre-pandemic levels, with increased patronage correlating to major events in Greater Manchester, with more people than ever using Metrolink to get to football matches.
2.5Reliability performance deteriorated slightly in periods nine and ten due to 2 incidents: a derailment in period 9 and a signal fault in period 10. Both occurred on the critical section of track between St Peter’s Square and Cornbrook, where incidents impact a number of lines and services. 2.6 Metrolink performance was also impacted by ongoing rail strikes which affected operation through Navigation Road and Altrincham stops. Detailed performance is outlined in section 4.
2.7Looking ahead to planned engineering works for 2023, we will have an ongoing programme of planned works which will be shorter in duration throughout the year landing on weekends and evenings, with some longer duration track and tunnel works in planning for the summer months. Planned works for March are outlined in section 5.1.
3. PATRONAGE 3.1 Patronage measures the number of single journeys that are made on the network.
3.2Seasonality impacts are clearly visible in the chart.
3.3Seasonal impacts include dates around national holidays, school holiday periods, students returning to all tiers of education and the Premier League football calendar. Patronage is also influenced by concerts and other high profile spectator events across the duration of the year.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Greater Manchester Transport Committee at Greater Manchester Combined Authority and we tell you when its next papers are published, before the meeting rather than after it.
Minutes of the Sub Committee MeetingsThat the minutes of the Metrolink & Rail Sub Committee held on 3 March 2023 be noted. 2. That the minutes of the Bus ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.