Item19
Resolved
That the application be approved subject to: a) authority being delegated to the Operational Director – Policy, Planning and Transportation, in consultation with the Chair or Vice Chair of the Committee, to determine the application following receipt of an amended plan dealing with the highway issues outlined and the consideration of the likelihood of bats being present on the site along with necessary surveys / mitigation; and b) following this approval it would be subject to the following conditions, as well as additional conditions being added in relation to outstanding matters: 1. Time limit – full permission; 2. Approved plans; 3. Implementation of proposed site levels (BE1); 4. Implementation of external facing materials (BE1 and BE2); 5. Soft landscaping scheme (BE1); 6. Boundary treatments scheme and details (BE1 and BE22); 7. Tree root protection measures (GE27); 8. Ground contamination (PR14); 9. Hours of construction (BE1); 10. Drainage strategy (PR16); 11. Foul and surface water of a separate system (PR16); 12. Construction management plan (Highways) (BE1); 13. Electric vehicle charging points scheme and implementation (CS19); 14. Cycle storage details and implementation (BE1); 15. Provision and retention of parking revised junction / access and pedestrian access constructed in accordance with approved plans (BE1); 16. Pedestrian access, steps, handrail and tactile paving details and implementation; and 17. Waste audit / site waste management plan.
Word for word from the decision Halton published for this meeting.
Source: moderngov.halton.gov.uk