Resolved
Decision made by Cabinet Member on: 18 March 2013 That approval be given to proceed with the works as detailed in the report.
Cabinet Members' Decisions approved this item on Monday 18 March 2013. Below is the council's own wording, with the papers it was decided on.
Resolved
Decision made by Cabinet Member on: 18 March 2013 That approval be given to proceed with the works as detailed in the report.
1.1The rail bridge on North End Road near West Kensington Station was strengthened in December 2012. The bridge strengthening has provided an opportunity to improve the operation of North End Road by widening the northbound traffic lanes. The opportunity will also be taken to improve the streetscape, implement additional operational improvements, and reduce the risk of vehicle incursion onto the rail line.
1.2The works are being funded as part of 2012/13 LIP programme. £55,000 has been allocated to the works this financial year. A further £35,000 will be required next financial year from the 2013/14 LIP funding.
1.3The proposed works include: • Widening the northbound lanes to 3 m, improving the operation of the northbound flow. • Installation of protection for the rail parapet to reduce the risk of vehicle incursion onto the rail line. • De-cluttering to improve footway space. • Amendment of waiting and loading restrictions on the eastern side of North End Road to prevent waiting and loading during peak periods and improve the southbound traffic flow. • Resurfacing and installation of a new gulley to improve drainage and reduce ponding on the highway. • Installation of two boxed junctions
2.1That approval be given to proceed with the works as detailed in this report.
3.1The works will: • Improve the operation of the northbound flow along North End Road by providing additional lane width • Improve the operation of the southbound flow along North End Road by reducing the incidences of turning vehicles and waiting or loading vehicles blocking traffic • Increase footway space for pedestrians • Protect the bridge parapet and reduce the risk of vehicle incursion onto the rail line • Reduce water ponding on the carriageway
4. INTRODUCTION AND BACKGROUND
4.1The North End Road bridge strengthening highway works are part of the LIP funded programme which were approved by TTCM on 9th Jan 2012 and Key decision on 5th March 2012
5. PROPOSAL AND ISSUES
Proposals 5.1. The northbound traffic lanes will be widened to 3 m. To widen the northbound traffic lanes the western footway will need to be narrowed along a 100 m length between 92 North End Road and Talgarth Road. The narrowing of the footway will require street furniture to be removed or relocated and Transport for London (TfL) to relocate traffic signals.
5.2London Underground (LUL) have requested protection for the bridge parapet be installed to reduce the risk of vehicle incursion onto the rail line. Options for this protection include strengthening of the parapet, and installation of an N2 barrier along the footway kerb edge between Baron’s Court Road and the north side of the rail bridge. Protecting the rail line from vehicle incursion is the shared responsibility of LUL and the road controlling authority (LBHF). Discussion with LUL to determine the most appropriate protection for rail line are on-going. It is anticipated a decision regarding the protection will be made before next financial year.
5.3De-cluttering and renewal of signs and street furniture will be undertaken including replacement of bollards with cycle stands along the eastern side of North End Road south of Beaumont Avenue, and replacement of old illuminated bollards with collapsible solar powered bollards.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
North End Road bridge strengthening: highway worksReport | 50 KB | DownloadRead as text |
Follow Cabinet Members' Decisions at Hammersmith & Fulham and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 4 Jan 2017 | Contract Award Community Sexual Reproductive Health Services: Lot 1 - Sexual Health Promotion and Psychosocial Support AND Lot 2 - Contraception and Sexually Transmitted Infection Screening (E)Decision taken by the Cabinet Member for Health and Adult Social Care on 28 th October 2016: The recommendations in t... | Agreed | Open |
| 4 Aug 2016 | Award Of One-Off Grant To Hammersmith And Fulham MencapDecision Taken by Cabinet Member on 30 June 2016: That a one-off grant of £50,000 be awarded to Hammersmith & Fulham ... | Agreed | Open |
| 4 Aug 2016 | Poverty And Worklessness Commission - Interview Programme With Residents Living In Poverty And/Or WorklessnessDecision Taken by Cabinet Member on 20 July 2016: That a sum of up to £28,000, secured from Section 106 funds, is mad... | Decided | Open |
| 4 Aug 2016 | Proposed Registration Service Fees And Charges For 2016/17Decision Taken by Cabinet Member on 3 August 2016: To approve the proposed Registration Service fees and charges from... | Approved | Open |
| 4 Aug 2016 | Bishops Park Public Toilet ImprovementsDecision Taken by Cabinet Member on 24 June 2016: That Amey be instructed to carry out these works. It is also recomm... | Decided | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.