Westfield London Shopping Centre, Ariel Way, London, Shepherd's Bush Green, 2022/03193/FUL
DecidedPlanning1 paper
Planning and Development Control Committee decided this item on Tuesday 7 March 2023. Below is the council's own wording, with the papers it was decided on.
RESOLVED 1. That Director of Planning and Property be authorised to grant permission subject to the condition(s) listed in the report. 2. That the Director of Planning and Property , after consultation with the Assistant Director Legal Services and the Chair of the Planning and Development Control Committee be authorised to make any minor changes to the proposed conditions, which may include the variation, addition or deletion of conditions, any such changes shall be within their discretion.
Word for word from the decision Hammersmith & Fulham published for this meeting.Source: democracy.lbhf.gov.uk
Description: Temporary use of the Square as an Ice Rink (use class F2 (d)), Christmas Tree and associated temporary structures for a temporary period between 1st November and 31st January inclusive on an annual basis for three years ending January 2025. Drg Nos: See Condition No.2
Application Type: Full Detailed Planning Application
Officer Recommendation:
1) That the Committee resolve that the Chief Planning Officer be authorised to grant permission subject to the conditions listed below;
2) That the Committee resolve that the Chief Planning Officer, after consultation with the Assistant Director Legal Services and the Chair of the Planning and Development Control Committee be authorised to make any minor changes to the proposed conditions, which may include the variation, addition or deletion of conditions, any such changes shall be within their discretion.
Conditions:
1) The temporary use of the site as a Christmas/winter event space is permitted for a limited period of 3 years only, on an annual basis between November and February only, commencing November 2022 until the 31st January 2025:-
Annually, in respect of the Christmas tree, this should be displayed only until 10th January 2024 for the 2023/2024 festive season and only until 10th January 2025 for the 2024/2025 festive season, after which date the Christmas tree shall be taken down and removed from the site, and the site shall be returned to its original condition.
Annually, in respect of the ice rink and associated structures, the use is to cease by the 31st January. The rink and associated structures hereby approved will be removed by 12th February 2024 for the 2023/2024 festive season and by 12th February 2025 for the 2024/2025 festive season, following which the site shall be returned to its original condition.
In the interests of proper planning and to ensure that the use does not have a significant impact upon the existing amenities of neighbouring residents, in accordance with Policies CC11, CC13, DC1, DC4, DC9 and HO11 of the Local Plan (2018). 2) The development hereby permitted shall be carried out in accordance with the following drawings and documents submitted:
Site Location Plan (WL-WestfieldSquare-Planning-Ice Rink22-171022-Ice Rink Location Plan), Site/Block Plan (180321-WF-01-ICE-RINK-PLANKRP-0SU), Proposed NE Elevation (WL-WestfieldSquare-Planning-Ice Rink22-171022-Ice Rink Screen-NE-Elevation), Proposed SE Elevation (WL-WestfieldSquare- Planning-Ice Rink22-171022-Ice Rink Screen-SE-Elevation), Structures & Rink Elevations (180321-WF-01-ICE-RINK-PLAN-RP-8EL), Cassette Floor Section (180321-WF-01-ICE-RINKPLANK-RP-7SE), Barrier Layout (180321-WF-01-ICE- RINKPLANK-RP-4BA), Flood Covering Plan (180321-WF-01-ICE-RINKPLANK- RP-3FC), Structure & Rink Structure Plan (180321-WF-01-ICE-RINKPLANK-RP- 2ST), Structure & Rink Floor Plan (180321-WF-01-ICE-RINKPLANK-RP-1FP), Visualisation Images, Design and Access Statement, (by Westfield Ltd.), Cover letter (NTR Planning Ltd.).
To ensure full compliance with the planning application hereby approved and to prevent harm arising through deviations from the approved plans, in accordance with Policies D1, D2, D3, D4, D5, D8, D9, D11, D12, D13, HC1, HC3, HC4 and G7 of the London Plan 2021, and Policies DC1, DC2, DC3, DC4, DC7 and DC8 of the Local Plan 2018 and Key Principles of the Planning Guidance SPD 2018.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Planning and Development Control Committee at Hammersmith & Fulham and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.