Hazel House, Sulgrave Road, London W6 7QF, Addison, 2024/03159/FUL
AgreedPlanning1 paper
Planning and Development Control Committee agreed this item on Tuesday 8 July 2025. Below is the council's own wording, with the papers it was decided on.
RESOLVED That the Director of Planning and Property be authorised to grant planning permission upon the completion of a satisfactory legal agreement and subject to the conditions listed in the report. That the Director of Planning and Property, after consultation with the Assistant Director of Legal Services and the Chair of the Planning and Development Control Committee be authorised to make any minor changes to the proposed conditions, which may include the variation, addition or deletion of conditions, any such changes shall be within their discretion.
Word for word from the decision Hammersmith & Fulham published for this meeting.Source: democracy.lbhf.gov.uk
Date Valid: Conservation Area: 03.01.2025 Constraint Name: Melrose Conservation Area - Number 26 Committee Date: 08.07.2025 Applicant: [name removed] 124 Balfour Road Ilford IG1 4JD UK
Description: Erection of a rear roof extension involving an increase in the ridge height by 300mm, in connection with the creation a new self-contained studio flat; alterations to part of the roof of the back addition to incorporate a flat roof and the erection of 1.7m high obscure glazed privacy screening around the resultant flat roof at third floor level to the rear elevation, in connection with its use as a terrace. Drg Nos: Refer to condition 2.
Application Type: Full Detailed Planning Application
Officer Recommendation:
(1) That the Committee resolve, that the Director of Planning and Property be authorised to grant planning permission upon the completion of a satisfactory legal agreement and subject to the conditions listed below.
(2) That the Committee resolve that the Director of Planning and Property, after consultation with the Assistant Director of Legal Services and the Chair of the Planning and Development Control Committee be authorised to make any minor changes to the proposed conditions, which may include the variation, addition or deletion of conditions, any such changes shall be within their discretion.
Conditions:
1) The development hereby permitted shall not commence later than the expiration of 3 years beginning with the date of this planning permission.
Condition required to be imposed by section 91(1)(a) of the Town and Country Planning Act 1990 (as amended by section 51 of the Planning and Compulsory Purchase Act 2004).
2) The development hereby permitted shall be carried out in complete accordance with the following approved drawing numbers, other than where those details are altered pursuant to the conditions of this planning permission:
Sound Insulation Specification (ref:1906191NR, dated 4th July 2019) prepared by Peak Acoustics Ltd.
To ensure full compliance with the planning application hereby approved and to prevent harm arising through deviations from the approved plans.
3) The development hereby permitted shall not be commenced until detailed design and method statements (in consultation with London Underground), have been submitted to and approved in writing by the local planning authority which:
- Provide construction details on the rear roof extension;
- Provide details on the use of tall plant, scaffolding and lifting equipment;
- Accommodate the location of the existing London Underground structures - the property is adjacent to the open section of TfL's operational railway. To ensure safety of TfL's railway from debris falling during construction or things being thrown post construction, any opening windows, balconies or terraces facing the railway elevation will require prior approval from LU Engineers and mitigate the effects of noise and vibration arising from the adjoining operations within the structures and tunnels.
The development shall thereafter be carried out in all respects in accordance with the approved design and method statements, and all structures and works comprised within the development hereby permitted which are required by the approved design statements in order to procure the matters mentioned in paragraphs of this condition shall be completed, in their entirety, before any part of the building hereby permitted is occupied.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Planning and Development Control Committee at Hammersmith & Fulham and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.