Resolved

That the River Hamble Harbour Management Committee notes the report.
Word for word from the decision Hampshire published for this meeting. Source: democracy.hants.gov.uk

Follow this further

Built from Hampshire's papers

What the report saysPro

Report to River Hamble Harbour Management Committee

Summary

1.1This report summarises activities relating to the River Hamble Harbour Authority’s (RHHA) environmental management of the Hamble Estuary in June and July 2017.

2. Updates 2.1. ‘River Hamble Safeguarding Agreement’ – ABP Southampton Water Capital Dredge. The River Hamble Safeguarding Agreement (RHSA) is now closed, although any subsequent outstanding dredging activity in the same area will trigger its re- establishment. In 2011 Associated British Ports (ABP) Southampton agreed to enter into a contract with RHHA titled ‘The River Hamble Safeguarding Agreement’ (RHSA). This was designed to protect the Harbour Authority and other River Hamble stakeholders from any adverse effects of significant excess sedimentation relating to ABP’s pending capital dredge to deepen and widen Southampton Water during 2014. As part of the agreement, ABP was required to carry out a baseline monitoring programme of depths in the River and of the levels of suspended sediment. This commenced six months before dredging started and continued until six months after the dredge was completed. In addition, many sites took RHHA’s advice to undertake their own hydrographic surveys. Detailed data analyses were undertaken by Lymington Technical Services (LTS) and ABP both throughout and following the dredging works, at cost to ABP. The impacts of excess sedimentation were only seen at one location. Under the terms of the Agreement, ABP has now reimbursed the owner the cost of the additional dredging that was required. Although ABP has no plans to undertake the widening element of the dredge in the foreseeable future, the Safeguarding Agreement will be re-established should this become the case. The harbour authority is delighted that the Agreement has fulfilled its purpose and it has been able to continue to safeguard the river and its users as a result. 2.2. Anode Research Members will be aware that the Board has part-funded a PhD study into the: ‘Evaluation of spatial variation in the dissolution of sacrificial anodes in the Solent and implications for management’. The study, by [name removed] of Southampton Solent University has been jointly conducted with Plymouth University. Initial results were presented to the Hamble Estuary Partnership on 29 June 2017 (see 2.3), to the Harbour Board on 14 July 2017, and discussed with Harbour Authority staff at a meeting to determine using the research to benefit River Users.

The study investigated anecdotal evidence that suggested anodes corrode quicker on the Hamble compared to elsewhere. Various theories have been investigated, as well as the composition of anodes. A survey of boat owners was conducted to determine anode decay rates and theories. Additionally, in-situ and laboratory anode experiments were carried out, along with water and sediment collection to determine Hamble zinc concentrations.

Hamble estuary’s average total dissolved zinc resulting from the PhD sampling between June 2015 and November 2016 was 8.07ug/l, although single variations ranged from 2.28- 29.09ug/l. These samples were focused in areas of high boat density where zinc levels are higher. It should be noted that the formal Environmental Quality Standard (EQS) sampling undertaken by the Environment Agency across the estuary falls within the EQS requirement. This is set for estuarine environments at 7.9ug/l. Research into the species on the Hamble judges impacts to be minimal. Low levels of zinc within the sediments suggest that zinc is flushed from the estuary in suspension.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Environmental UpdateReport 91 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

15 of 25 attended
SW
Councillor Seán WoodwardChairman, present
RH
Councillor Roger HuxstepVice-Chairman, present
FB
Councillor Fred BirkettCommittee Member, absent
MC
Councillor Mark CooperCommittee Member, apologies, sent representative
RC
Councillor Rod CooperCommittee Member, present
TC
Councillor Tonia CraigCommittee Member, absent
PH
Councillor Pal HayreCommittee Member, present
RK
Councillor Rupert KyrleCommittee Member, present
SP
Councillor Stephen PhilpottCommittee Member, present
LQ
Councillor Lance QuantrillCommittee Member, present
AG
Councillor Andrew GibsonConservative Deputy
BT
Councillor Bruce TennentLiberal Democrats Deputy, present as substitute

All 25 on the meeting page

On this subject at Hampshire

Search all
  1. Environmental UpdateThis decision
  2. Environmental UpdateNoted
  3. Environmental UpdateNoted
  4. Environmental UpdateNoted
  5. Environmental UpdateNoted
  6. Environmental UpdateNoted

More from Hampshire River Hamble Harbour Management Committee

All decisions
MeetingDecisionOutcome
18 Sep 2026 Marine Director and Harbour Master's Report and Current IssuesThe River Hamble Harbour Management Committee supported the contents of this report to the Harbour Board. Decided Open
18 Sep 2026 Environmental UpdateThe River Hamble Harbour Management Committee noted and supported the remainder of this report. Noted Open
18 Sep 2026 Annual Review of Business PlanThe River Hamble Harbour Management Committee recommended that the River Hamble Harbour Board supports the contents o... Decided Open
18 Sep 2026 Forward Plan for Future MeetingsThe River Hamble Harbour Management Committee noted the report. Noted Open
12 Jun 2026 Marine Director and Harbour Master's Report and Current IssuesRESOLVED The River Hamble Harbour Management Committee supported the contents of this report to the Harbour Board. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies