River Hamble Harbour Management Committee, Friday 8 September 2017 at 10.00am

Harbour Works Consent Application

Approved Committee 5 papers

River Hamble Harbour Management Committee approved this item on Friday 8 September 2017. Below is the council's own wording, with the papers it was decided on.

Item20

Resolved

That the River Hamble Harbour Management Committee recommends to the River Hamble Harbour Board to approve Harbour Works Consent for the proposal set out in Section 3 of this report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method set out in paragraph 3.5. b. The development is constructed in accordance with the guidance given in the industry Code of Practice for the design of marinas. c. Hamble Point Marina conducts a revised Risk Assessment within its own Safety Management System to reflect and manage the risks of the changes made and provides self-certification that it has done so prior to any construction taking place. That risk assessment will in particular address the management of risk of vessels entering and particularly leaving the Marina and conflicting with other vessels (especially small vessels including dinghies, kayaks and canoes) using the access channel. This will include the following control measures being put in place prior to berths being allocated: i . The affixing of appropriately visible signage (at least 1m in height and 1.5m width, with the wording ‘GIVE WAY TO TRAFFIC USING THE ACCESS CHANNEL’) at the exit of each Marina channel to show that vessels leaving the Marina are required to give way to those vessels using the access channel. ii. written advice to all Marina berth holders and inclusion in the terms of berth-holders’ lease of the requirement to give way as at 9.1c.i above, coupled with the right of termination in the event of non-compliance. iii. Suitable advice must also be made available for visiting vessels. d. The beam of craft moored on the new Hammerheads will be limited to 4.7m with no double ... view the full minutes text for item 20.
Word for word from the decision Hampshire published for this meeting. Source: democracy.hants.gov.uk

Follow this further

Built from Hampshire's papers

What the report saysPro

Report to River Hamble Harbour Management Committee

Summary

1.1This report sets out an application for Harbour Works Consent (HWC) made by Marina Development Limited (MDL) to extend five piers at Hamble Point Marina, School Lane, Hamble SO31 4NB.

2. Background 2.1. MDL wishes to meet demand for additional berthing by extending the marina within its own curtilage. MDL has undertaken pre-application consultation with the Harbour Master regarding aspirations for the site over a number of years, including attendance at a Consent Advice Panel meeting.

3. Project Description 3.1. MDL proposes to extend five of Hamble Point Marina’s main piers in order to increase berthing capacity. The extension will allow installation of one additional finger pontoon on each side of these piers. This will create four extra berths per pier, totalling twenty new berths. 3.2. New floating pontoon walkway sections and finger pontoons will be installed in line with existing infrastructure. In order to ensure the piers remain stable some walkway sections and finger pontoons will require additional piles, and some existing piles will be relocated. 3.3. This proposal will not require any dredging. 3.4. This proposal is sited within the title boundary of MDL’s Hamble Point Marina. 3.5. The following plans and documents have been provided by the applicant to support this application, and reference must be made to these for a full understanding of the proposal (see Appendix 1a-c):  Appendix 1a o Project Detail & Method Statement  Appendix 1b o Supporting Information  Appendix 1c - Plans o Site Layout - Existing and Proposed Layouts. Rev 0. o Pier A & B Extension. Rev 0. o Pier C & D Extension. Rev 0. o Pier E & F Extension. Rev 0. o Pier G & H Extension. Rev 0. o Pier I & J Extension. Rev 0.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Appendix 1aAppendix 1a 509 KB Download
PDF
Appendix 1bAppendix 1b 530 KB Download
PDF
Appendix 1cAppendix 1c 652 KB Download
PDF
Appendix 2Appendix 2 110 KB Download
PDF
Harbour Works Consent ApplicationReport 128 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

15 of 25 attended
SW
Councillor Seán WoodwardChairman, present
RH
Councillor Roger HuxstepVice-Chairman, present
FB
Councillor Fred BirkettCommittee Member, absent
MC
Councillor Mark CooperCommittee Member, apologies, sent representative
RC
Councillor Rod CooperCommittee Member, present
TC
Councillor Tonia CraigCommittee Member, absent
PH
Councillor Pal HayreCommittee Member, present
RK
Councillor Rupert KyrleCommittee Member, present
SP
Councillor Stephen PhilpottCommittee Member, present
LQ
Councillor Lance QuantrillCommittee Member, present
AG
Councillor Andrew GibsonConservative Deputy
BT
Councillor Bruce TennentLiberal Democrats Deputy, present as substitute

All 25 on the meeting page

On this subject at Hampshire

Search all
  1. Harbour Works Consent ApplicationThis decision
  2. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  3. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  4. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Philip Yacht HavenApproved
  5. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Phillip Yacht HavenApproved
  6. Harbour Works Consent Application - Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DFApproved

More from Hampshire River Hamble Harbour Management Committee

All decisions
MeetingDecisionOutcome
18 Sep 2026 Marine Director and Harbour Master's Report and Current IssuesThe River Hamble Harbour Management Committee supported the contents of this report to the Harbour Board. Decided Open
18 Sep 2026 Environmental UpdateThe River Hamble Harbour Management Committee noted and supported the remainder of this report. Noted Open
18 Sep 2026 Annual Review of Business PlanThe River Hamble Harbour Management Committee recommended that the River Hamble Harbour Board supports the contents o... Decided Open
18 Sep 2026 Forward Plan for Future MeetingsThe River Hamble Harbour Management Committee noted the report. Noted Open
12 Jun 2026 Marine Director and Harbour Master's Report and Current IssuesRESOLVED The River Hamble Harbour Management Committee supported the contents of this report to the Harbour Board. Decided Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies