Resolved
That the River Hamble Harbour Board notes the report.
River Hamble Harbour Board decided this item on Friday 6 October 2017. Below is the council's own wording, with the papers it was decided on.
Resolved
That the River Hamble Harbour Board notes the report.
1.1This report summarises activities relating to the River Hamble Harbour Authority’s (RHHA) environmental management of the Hamble Estuary in June and July 2017.
2. Updates 2.1. ‘River Hamble Safeguarding Agreement’ – ABP Southampton Water Capital Dredge. The River Hamble Safeguarding Agreement (RHSA) is now closed, although any subsequent outstanding dredging activity in the same area will trigger its re- establishment. In 2011 Associated British Ports (ABP) Southampton agreed to enter into a contract with RHHA titled ‘The River Hamble Safeguarding Agreement’ (RHSA). This was designed to protect the Harbour Authority and other River Hamble stakeholders from any adverse effects of significant excess sedimentation relating to ABP’s pending capital dredge to deepen and widen Southampton Water during 2014. As part of the agreement, ABP was required to carry out a baseline monitoring programme of depths in the River and of the levels of suspended sediment. This commenced six months before dredging started and continued until six months after the dredge was completed. In addition, many sites took RHHA’s advice to undertake their own hydrographic surveys. Detailed data analyses were undertaken by Lymington Technical Services (LTS) and ABP both throughout and following the dredging works, at cost to ABP. The impacts of excess sedimentation were only seen at one location. Under the terms of the Agreement, ABP has now reimbursed the owner the cost of the additional dredging that was required. Although ABP has no plans to undertake the widening element of the dredge in the foreseeable future, the Safeguarding Agreement will be re-established should this become the case. The harbour authority is delighted that the Agreement has fulfilled its purpose and it has been able to continue to safeguard the river and its users as a result. 2.2. Anode Research Members will be aware that the Board has part-funded a PhD study into the: ‘Evaluation of spatial variation in the dissolution of sacrificial anodes in the Solent and implications for management’. The study, by [name removed] of Southampton Solent University has been jointly conducted with Plymouth University. Initial results were presented to the Hamble Estuary Partnership on 29 June 2017 (see 2.3), to the Harbour Board on 14 July 2017, and discussed with Harbour Authority staff at a meeting to determine using the research to benefit River Users.
The study investigated anecdotal evidence that suggested anodes corrode quicker on the Hamble compared to elsewhere. Various theories have been investigated, as well as the composition of anodes. A survey of boat owners was conducted to determine anode decay rates and theories. Additionally, in-situ and laboratory anode experiments were carried out, along with water and sediment collection to determine Hamble zinc concentrations.
Hamble estuary’s average total dissolved zinc resulting from the PhD sampling between June 2015 and November 2016 was 8.07ug/l, although single variations ranged from 2.28- 29.09ug/l. These samples were focused in areas of high boat density where zinc levels are higher. It should be noted that the formal Environmental Quality Standard (EQS) sampling undertaken by the Environment Agency across the estuary falls within the EQS requirement. This is set for estuarine environments at 7.9ug/l. Research into the species on the Hamble judges impacts to be minimal. Low levels of zinc within the sediments suggest that zinc is flushed from the estuary in suspension.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Environmental UpdateReport | 92 KB | DownloadRead as text |
Follow River Hamble Harbour Board at Hampshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 26 Jun 2026 | Marine Director and Harbour Master's Report and Current IssuesRESOLVED That the River Hamble Harbour Board supported the contents of this report. | Decided | Open |
| 26 Jun 2026 | Environmental UpdateRESOLVED That the River Hamble Harbour Board noted and supported the contents of this report. | Noted | Open |
| 26 Jun 2026 | River Hamble Final Accounts 2025/26 and Forecast Outturn 2026/27RESOLVED · That this report, the statutory accounts and management accounts for 2025/26 be approved by the River Hamb... | Approved | Open |
| 26 Jun 2026 | Review of Harbour DuesRESOLVED That the River Hamble Harbour Board approves an increase in Harbour Dues of 5% for the 2027 calendar year. | Approved | Open |
| 26 Jun 2026 | Forward Plan of Future MeetingsRESOLVED That the River Hamble Harbour Board noted the contents of this report. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.