Resolved
That the River Hamble Harbour Board approves the Harbour Works Consent for the proposal set out in Section 3 of the report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method set out in paragraph 3.5. b. The development is constructed in accordance with the guidance given in the industry Code of Practice for the design of marinas. c. Hamble Point Marina conducts a revised Risk Assessment within its own Safety Management System to reflect and manage the risks of the changes made and provides self-certification that it has done so prior to any construction taking place. That risk assessment will in particular address the management of risk of vessels entering and particularly leaving the Marina and conflicting with other vessels (especially small vessels including dinghies, kayaks and canoes) using the access channel. This will include the following control measures being put in place prior to berths being allocated: i. The affixing of appropriately visible signage (at least 1m in height and 1.5m width, with the wording ‘GIVE WAY TO TRAFFIC USING THE ACCESS CHANNEL’) at the exit of each Marina channel to show that vessels leaving the Marina are required to give way to those vessels using the access channel. ii. written advice to all Marina berth holders and inclusion in the terms of berth-holders’ lease of the requirement to give way as at 9.1c.i above, coupled with the right of termination in the event of non-compliance. iii. Suitable advice must also be made available for visiting vessels. d. The beam of craft moored on the new Hammerheads will be limited to the dimensions indicated in the attached plans with no double berthing or rafting allowed. The concomitant impact of the narrower width of the channel will be to limit the length of craft using it to 17.7m (53ft) at the narrowest point (26.6m). Other limitations will apply to the lengths of vessels able to use the channel adjacent to each hammerhead, commensurate with the new width created, which may affect the overall berthing plan within the Marina. This must feature in the Marina’s revised risk assessment. e. The ... view the full minutes text for item 22.