CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Hampshire County Council
River Hamble Harbour Board, Friday 6 October 2017 at 10.00am

Harbour Works Consent Application

Approved Committee 5 papers

River Hamble Harbour Board approved this item on Friday 6 October 2017. Below is the council's own wording, with the papers it was decided on.

Item22

Resolved

That the River Hamble Harbour Board approves the Harbour Works Consent for the proposal set out in Section 3 of the report and subject to the following conditions: a. The proposal is to be built in accordance with the details, plans and method set out in paragraph 3.5. b. The development is constructed in accordance with the guidance given in the industry Code of Practice for the design of marinas. c. Hamble Point Marina conducts a revised Risk Assessment within its own Safety Management System to reflect and manage the risks of the changes made and provides self-certification that it has done so prior to any construction taking place. That risk assessment will in particular address the management of risk of vessels entering and particularly leaving the Marina and conflicting with other vessels (especially small vessels including dinghies, kayaks and canoes) using the access channel. This will include the following control measures being put in place prior to berths being allocated: i. The affixing of appropriately visible signage (at least 1m in height and 1.5m width, with the wording ‘GIVE WAY TO TRAFFIC USING THE ACCESS CHANNEL’) at the exit of each Marina channel to show that vessels leaving the Marina are required to give way to those vessels using the access channel. ii. written advice to all Marina berth holders and inclusion in the terms of berth-holders’ lease of the requirement to give way as at 9.1c.i above, coupled with the right of termination in the event of non-compliance. iii. Suitable advice must also be made available for visiting vessels. d. The beam of craft moored on the new Hammerheads will be limited to the dimensions indicated in the attached plans with no double berthing or rafting allowed. The concomitant impact of the narrower width of the channel will be to limit the length of craft using it to 17.7m (53ft) at the narrowest point (26.6m). Other limitations will apply to the lengths of vessels able to use the channel adjacent to each hammerhead, commensurate with the new width created, which may affect the overall berthing plan within the Marina. This must feature in the Marina’s revised risk assessment. e. The ... view the full minutes text for item 22.
Word for word from the decision Hampshire published for this meeting. Source: democracy.hants.gov.uk

Follow this further

Built from Hampshire's papers

What the report saysPro

Report to River Hamble Harbour Board

Summary

1.1This report sets out an application for Harbour Works Consent (HWC) made by Marina Development Limited (MDL) to extend five piers at Hamble Point Marina, School Lane, Hamble SO31 4NB.

2. Background 2.1. MDL wishes to meet demand for additional berthing by extending the marina within its own curtilage. MDL has undertaken pre-application consultation with the Harbour Master regarding aspirations for the site over a number of years, including attendance at a Consent Advice Panel meeting.

3. Project Description 3.1. MDL proposes to extend five of Hamble Point Marina’s main piers in order to increase berthing capacity. The extension will allow installation of one additional finger pontoon on each side of these piers. This will create four extra berths per pier, totalling twenty new berths. 3.2. New floating pontoon walkway sections and finger pontoons will be installed in line with existing infrastructure. In order to ensure the piers remain stable some walkway sections and finger pontoons will require additional piles, and some existing piles will be relocated. 3.3. This proposal will not require any dredging. 3.4. This proposal is sited within the title boundary of MDL’s Hamble Point Marina. 3.5. The following plans and documents have been provided by the applicant to support this application, and reference must be made to these for a full understanding of the proposal (see Appendix 1a-c):  Appendix 1a o Project Detail & Method Statement  Appendix 1b o Supporting Information  Appendix 1c - Plans o Site Layout - Existing and Proposed Layouts. Rev 0. o Pier A & B Extension. Rev 0. o Pier C & D Extension. Rev 0. o Pier E & F Extension. Rev 0. o Pier G & H Extension. Rev 0. o Pier I & J Extension. Rev 0.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Harbour Works Consent: Appendix 1aAppendix 509 KB Download
PDF
Harbour Works Consent: Appendix 1bAppendix 530 KB Download
PDF
Harbour Works Consent: Appendix 1cAppendix 652 KB Download
PDF
Harbour Works Consent: Appendix 2Appendix 110 KB Download
PDF
Harbour Works Consent ApplicationReport 128 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

6 of 9 attended
KE
Councillor Keith EvansChairman, apologies
PL
Councillor Peter LathamVice-Chairman, present
KH
Councillor Keith HouseCommittee Member, present
GH
Councillor Geoffrey HockleyConservative Deputy
RP
Councillor Roger PriceLiberal Democrats Deputy
NH
Nikki Hiorns Environmental Management RepresentativeCo-opted Member, present
DJ
David Jobson Recreational Sailing RepresentativeCo-opted Member, present
CM
Chris Moody Marine Industry RepresentativeCo-opted Member, present
JS
Jason Scott Marine Director (non voting)Co-opted Member, present

On this subject at Hampshire

Search all
  1. Harbour Works Consent ApplicationThis decision
  2. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  3. Harbour Works Consent Application - Quay Wall Refurbishment & Pontoon Works at Riverside BoatyardApproved
  4. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Philip Yacht HavenApproved
  5. Harbour Works Consent Application - Minor rearrangement of walkway pontoon and installation of two finger pontoons at Prince Phillip Yacht HavenApproved
  6. Harbour Works Consent Application - Retention of existing jetty (retrospective application) and installation of new ecological enhancements at Highfield, SO31 7DFApproved

More from Hampshire River Hamble Harbour Board

All decisions
MeetingDecisionOutcome
26 Jun 2026 Marine Director and Harbour Master's Report and Current IssuesRESOLVED That the River Hamble Harbour Board supported the contents of this report. Decided Open
26 Jun 2026 Environmental UpdateRESOLVED That the River Hamble Harbour Board noted and supported the contents of this report. Noted Open
26 Jun 2026 River Hamble Final Accounts 2025/26 and Forecast Outturn 2026/27RESOLVED · That this report, the statutory accounts and management accounts for 2025/26 be approved by the River Hamb... Approved Open
26 Jun 2026 Review of Harbour DuesRESOLVED That the River Hamble Harbour Board approves an increase in Harbour Dues of 5% for the 2027 calendar year. Approved Open
26 Jun 2026 Forward Plan of Future MeetingsRESOLVED That the River Hamble Harbour Board noted the contents of this report. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies