CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Hampshire County Council
Regulatory Committee, Wednesday 21 October 2020 at 10.00am

A303 IBA Recycling Facility Drayton Road Barton Stacey

Decided Licensing 3 papers

Regulatory Committee decided this item on Wednesday 21 October 2020. Below is the council's own wording, with the papers it was decided on.

Item225

Resolved

RESOLVED Planning permission was granted subject to the amended conditions Voting: Favour: 15 Abstentions: 1
Word for word from the decision Hampshire published for this meeting. Source: democracy.hants.gov.uk

Follow this further

Built from Hampshire's papers

What the report saysPro

Report to Regulatory Committee

Recommendation

1. That planning permission be granted subject to conditions.

Executive summary

2. The planning application is for variation of Condition 14 of Planning Permission 17/00172/CMAN to allow a temporary increase in annual throughput at The A303 IBA Recycling Facility, Drayton Road, Barton Stacey SO21 3QS.

3. This application is being considered by the Regulatory Committee at the request of the Local Member, Councillor Gibson.

4. Key issues raised are highways, impact on local amenity and intensification of development on the site.

5. The proposed development is not an Environmental Impact Assessment development under the Town & Country Planning (Environmental Impact Assessment) Regulations 2017.

6. It is considered that the proposal would be in accordance with the relevant policies of the adopted Hampshire Minerals & Waste Plan (2013) (HMWP) and Test Valley Borough Revised Local Plan (2011 - 2029) (2016) (TVBLP (2016)) as the proposal is a time limited extension of operations at an existing and permanent waste site that will not have a significant adverse effect on the landscape and amenity. The proposal is acceptable in terms of highway capacity and safety and cumulative impacts and is not considered to be likely to cause unacceptable adverse amenity or other cumulative impacts. 7. That planning permission be granted subject to the conditions listed in Appendix A.

The Site

8. The application site (approximately seven hectares in area) lies to the south east of Andover, approximately 1.8 kilometres (km) north of Barton Stacey and approximately 1.9km south of Longparish. Immediately to the south is the existing A303 Materials Recycling Facility (MRF). The site is accessed through the adjoining MRF by private haul road which subsequently joins the Barton Stacey to Longparish road. Fifty metres to the south of the junction are the two slip roads on and off the A303 strategic highway route. The operational area of the site measures two hectares, with the remaining application area accounted for by landscaped perimeter bunds.

9. The existing operation involves the importation of Incinerator Bottom Ash (IBA) from Energy from Waste plants across Hampshire and Jersey via Southampton Docks. The IBA is processed to remove a significant proportion of the metal content. Metals are forwarded from the site for refining elsewhere before being reused.

10. The remaining material, Incinerator Bottom Ash Aggregate (IBAA) is sold from site as an aggregate substitute and is used as a direct replacement for primary aggregates in road construction.

11. The facility benefits from permanent planning permission for waste management (see Planning History section of this report).

12. The land immediately to the north has been developed as a solar farm. Lines of photovoltaic solar panels have been erected in the adjacent field and produce renewable energy. To the east is a gas pipeline service station that provides access to the main southwest gas pipeline to machinery for cleaning and inspection. There is also a Go-Kart track mainly used at weekends. These use the same access as the A303 Site.

13. The nearest residential properties lie at Drayton Park, approximately 300 metres south-west of the haul road access and over 600 metres from the IBA facility. Lodge Farm lies approximately 450 metres to the east of the site. The site is screened from public view by existing bunds to the north, south and west. 14. The site lies within a Groundwater Vulnerability Zone and overlies a chalk aquifer.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
A303 IBA Recycling Facility Drayton Road Barton StaceyReport 336 KB DownloadRead as text
PDF
Application PlanReport 581 KB Download
PDF
Committee PlanReport 2.6 MB Download

At this meeting

Whole meeting

Who was there

16 of 18 attended
PL
Councillor Peter LathamChairman, present
LQ
Councillor Lance QuantrillVice-Chairman, present
CC
Councillor Christopher CarterCommittee Member, present
MC
Councillor Mark CooperLiberal Democrats Spokesperson, present
RC
Councillor Rod CooperCommittee Member, present
RD
Councillor Roland DibbsCommittee Member, apologies
JF
Councillor Jane FrankumCommittee Member, present
AG
Councillor Andrew GibsonCommittee Member, present
KH
Councillor Keith HouseCommittee Member, present
GH
Councillor Gary HughesCommittee Member, present
WI
Councillor Wayne IrishCommittee Member, present
AM
Councillor Alexis McEvoyCommittee Member, present

All 18 on the meeting page

More from Hampshire Regulatory Committee

All decisions
MeetingDecisionOutcome
15 Jul 2026 Update to the Validation GuidanceRESOLVED That the Committee note the contents of the draft Planning Application Validation Guidance and approve the d... Noted Open
10 Jun 2026 Monitoring and Enforcement UpdateRESOLVED The Regulatory Committee noted the content of the report. Noted Open
10 Jun 2026 Impending legislation changes for Regulatory Committee including changes to the committee sizeRESOLVED The Regulatory Committee noted the anticipated legislation to come into force on 31 October 2026. The Regula... Noted Open
18 Mar 2026 Silverlake Automotive Recycling Ltd, Botley Road, Shedfield, SouthamptonThat planning permission be REFUSED for the reasons set out in the report of the Director of Universal Services. Refused Open
18 Mar 2026 Monitoring and Enforcement UpdateMembers noted the contents of the report. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies