Resolved
RESOLVED The River Hamble Harbour Board supported the contents of the report.
River Hamble Harbour Board decided this item on Friday 7 January 2022. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED The River Hamble Harbour Board supported the contents of the report.
Addendum to Agenda Item 6 of the Meeting of the River Hamble Harbour Board on Friday 7 Jan 2022
12.123. 29 Nov. Yard maintenance work. Liaison with the Crown Estate mooring contractor.
12.124. 30 Nov. Routine maintenance of Aids to Navigation. Office Christmas roof decoration preparation.
12.125. 01 Dec. Liaison with the Crown Estate mooring contractor. Light traffic in building winds.
12.126. 02 Dec. Office Yard refuse facility construction work. Light traffic.
12.127. 03 Dec. Patrol craft ant-foul trial work. Completed construction of yard refuse platform. Light traffic.
12.128. 04 Dec. Re-location of a number of mid-stream moored vessels off Hamble Point prior to commencement of dredging operations. Support to Bird Aware Solent. Assistance given to a motor vessel fouled on a picking-up rope.
12.129. 05 Dec. Continuation of yacht re-location prior to dredging operations. Re- secured flogging headsail on a mid-stream moored yacht.
12.130. 06 Dec. Assistance given to a motor vessel fouled on a picking-up rope. Continuation of vessel re-location prior to dredging operations.
12.131. 07 Dec. Morning check of Hamble Jetty following a report of icing. Pumped out a yacht sitting lower in the water than usual. No obvious source of ingress. Liaison with owner. Re-secured a loose mainsail halyard on a mid- stream moored yacht. Re-furled a loose headsail on a second mid-stream moored yacht.
12.132. 08 Dec. Clearance of footpath, yard and slipway following surge tides, reaching 5.4m (4.7m predicted). Pumped out cockpit of a mid-stream moored yacht with blocked scuppers. Refitted a loose dodger to a midstream moored yacht. Assistance given to a boat owner trapped in a lazarette locker. Boat owner unable to free the hatch but had his mobile telephone on hand. Liaison with the Crown Estate mooring contractor.
12.133. 09 Dec. Assembly and installation of the RHHA annual Christmas roof decoration. Slipway clearance work at Warsash. Flotsam collected and placed in yard for disposal.
12.134. 10 Dec. Routine patrol boat maintenance. Liaison with the Crown Estate mooring contractor regarding forthcoming pile maintenance programme. Liaison with the Environment Agency and Southern Water to resolve drainage issue in lower Warsash.
12.135. 11 Dec. Liaison with Hampshire Constabulary regarding an incident in Shore Road car park. Adjustment of vessels on the mid-stream Visitors’ Pontoon. 12.136. 12 Dec. Liaison with the Crown Estate mooring contractor regarding the replacement of a failed pile iron. Further liaison with the Environment Agency and Southern Water (on site) to resolve local drainage issues. Preparations for annual commercial billing. Liaison with owners displaced from the ‘A’ run by dredging operations.
12.137. 13 Dec. Liaison with a visiting RNLI vessel. Preparations for annual commercial billing round. Light traffic.
12.138. 14 Dec. Liaison with Hampshire Marine Police Unit. Support to RNLI vessels conducting compass checks in the mouth of the River. Further liaison wit EA and SW regarding drainage.
12.139. 15 Dec. Attended a vessel with persons unexpectedly on board to confirm bona fides. Vessel sold as part of a deceased former mooring holder’s estate and those on board were grateful for the check. Day into night light audit.
12.140. 16 Dec. Patrol to the Horse and Jockey. Curbridge jetty remains in place pending Parish Council removal. Responded to reports from members of the public reporting two PWC speeding adjacent to Swanwick slipway. On arrival, neither vessel was located.
12.141. 17 Dec. Jetty maintenance at the River Hamble Country Park. Responded to a call from a member of the public reporting an apparently abandoned tender on the foreshore near the Chinese Bridge. Tender located but height of tide not conducive to recovery. Awaiting next higher tide.
12.142. 18 Dec. Light traffic. Tender at 12.141 recovered to Warsash.
12.143. 19 Dec. Support to dinghy racing activity at Warsash and Bursledon.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Appendix 2Appendix 2 | 272 KB | Download |
PDF |
Item 7: Incident ListReport | 114 KB | DownloadRead as text |
PDF |
Marine Director and Harbour Master's Report and Current IssuesReport | 573 KB | Download |
PDF |
Strategic Vision and Plan 2022-2024Report | 350 KB | Download |
Follow River Hamble Harbour Board at Hampshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 26 Jun 2026 | Marine Director and Harbour Master's Report and Current IssuesRESOLVED That the River Hamble Harbour Board supported the contents of this report. | Decided | Open |
| 26 Jun 2026 | Environmental UpdateRESOLVED That the River Hamble Harbour Board noted and supported the contents of this report. | Noted | Open |
| 26 Jun 2026 | River Hamble Final Accounts 2025/26 and Forecast Outturn 2026/27RESOLVED · That this report, the statutory accounts and management accounts for 2025/26 be approved by the River Hamb... | Approved | Open |
| 26 Jun 2026 | Review of Harbour DuesRESOLVED That the River Hamble Harbour Board approves an increase in Harbour Dues of 5% for the 2027 calendar year. | Approved | Open |
| 26 Jun 2026 | Forward Plan of Future MeetingsRESOLVED That the River Hamble Harbour Board noted the contents of this report. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.