RESOLVED · That approval be granted for a waiver of the requirements set out in CSO 9.01 to enable a tender process to take place without advertising by inviting tenders from a selection of contractors from Constructionline (a government managed UK register of pre-qualified construction services) for the works. · That approval be granted to award the contract for the above project in accordance with CSO 9.07.1(d) to BTU Installation and Maintenance Ltd under the terms detailed in the exempt appendix to the interleaved report. · That approval be granted to the issue of a Letter of Intent at 10% of the contract value as allowed under CSO 9.08.3.
Word for word from the decision Haringey published for this meeting.Source: www.minutes.haringey.gov.uk
3.1To approve a waiver of the requirements set out in CSO 9.01 to enable a tender process to take place without advertising by inviting tenders from a selection of contractors from Constructionline (a government managed UK register of pre-qualified construction services) for the works.
Page 1 of 6 3.2. To agree to award the contract for the above project in accordance with CSO 9.07.1(d) to the contractor named in the exempt information Appendix A Paragraph 1.5. 3.3. It is further recommended that Members agree to the issue of a Letter of Intent at 10% of the contract value as allowed under CSO 9.08.3.
4. Other options considered 4.1. A total of 5 contractors selected from Constructionline were invited to tender for the works. Constructionline was used rather than the existing Framework Agreement for the provision of Major Works Construction Services, as the work to be carried out is specialist in nature and contractors outside of this framework have the necessary skills to undertake the work. One contractor declined during the tender period. Details of this are contained in the tender report Appendix A.
5. Background information
5.1Introduction
5.1.1. The existing mechanical services plant and distribution of the Northumberland Park Community Pool appears to be around 20 – 25 years old and is in poor condition as evidenced in the initial survey completed by NPS (London) Ltd and is therefore reaching the end of its operational life.
5.1.2. The main school building has recently undergone a major refurbishment programme as part of the Building Schools for the Future programme, however, the pool building itself was provided with some supplementary heating works although limited to two areas: a secondary heating system for the pool plant serviced from a solar panel system and a new secondary space heating zone.
5.1.3. The systems associated to the pool building include the following: • The central Boiler Plant and distribution • The ventilation to pool hall and associated areas • Supplementary heating zones to main pool hall • Heating to the pool water heat exchanger unit • Automatic controls and Motor Control Panels
5.1.4. The existing boiler plant comprises of a two module boiler, with the hot water distributed by a single twin pump set with no secondary pumping zones. The building is serviced by three ventilation plants which do not have any cooling or humidity control facilities which can cause severe overheating in summer. The system is independent of the main heating system with no control interface between the two systems.
Page 2 of 6 5.1.5. The facility has reached the end of its operational life, is inefficient in its use of energy and there are now potential issues that may cause the system to fail. Therefore there is the need to replace these boilers as soon as possible with more efficient boilers.
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Award of coroners' removals contractRESOLVED · That approval be granted for the award of contract for a Coroners’ removal service to Dignity Funeral Ltd ...
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.