London Borough of Haringey
Cabinet Member Signing, Monday 12 December 2016 at 3.30pm

Mechanical Improvement Works Phase 1 (2016/17)

Approved Executive 1 paper

Cabinet Member Signing approved this item on Monday 12 December 2016. Below is the council's own wording, with the papers it was decided on.

Item22

Resolved

RESOLVED 1. To approve the award of contract to Purdy Contracts Limited for the refurbishment and upgrading of the centralised mechanical ventilation services for the sum of £948,907 (rounded up) and contract period of 28 weeks. 2. To approve the total professional fees of £89,388, which represents 9.42% of the contract sum. That the total project cost of £1,038,295 be noted. 3. To authorise Haringey’s Legal Department to issue a letter of Intent up to and not exceeding £94,890, being 10% of the contract sum as allowed under the Council’s Contract Standing Orders. Reasons for decision Approval of the successful competitive tender scheme is required to allow the contract to be awarded and the planned refurbishment and upgrading of the centralised mechanical ventilation services work to be ordered. The new system will protect residents within their properties in the event of a fire, as smoke will be detected as it is drawn into the vicinity of the extract grille by the negative pressure in the or bathroom or toilet. The air flow valve will shut down isolating the remainder of the riser within 5 seconds and an audible alarm will be activated. The current systems do not perform to the requirements of the Building Regulations Part F1. An historic combination of double glazing and draughtproofing and the deteriorated condition of the roof fans and ducts has caused a critical reduction of the ventilation rates to dwellings and this could lead to a consequential increase in dampness-related repairs. Restoring the ventilation schemes to beyond their original design performance will greatly reduce these issues and lead to reduced repair costs over the life of the system. The new system will be a smart, digital solution that has smart air terminals that have Bluetooth technology embedded which enables each terminal to be interrogated, cycle tested and validated as fully functional without access to the property itself and in real time. Further, data from the air terminal can be downloaded via this wireless link to detect instances in which the terminals alarm functions have been activated, the status of the standby battery and whether the device has been disconnected from the mains supply. All of this data is date and time stamped to aid analysis and compliance checking. Alternative options considered The alternative option to repair the existing system which could result in ongoing maintenance issues and not addressing the potential fire risk.
Word for word from the decision Haringey published for this meeting. Source: www.minutes.haringey.gov.uk

Follow this further

Built from Haringey's papers

What the report saysPro

Report to Cabinet Member Signing

Recommendations

3.1That the Cabinet approves the award of contract to Purdy Contracts Limited for the refurbishment and upgrading of the centralised mechanical ventilation services for the sum of £948,907 (rounded up) and contract period of 28 weeks.

3.2That the Cabinet Member approves the total professional fees of £89,388, which represents 9.42% of the contract sum. That the total project cost of £1,038,295 be noted.

3.3That the Cabinet Member authorises Haringey’s Legal Department to issue a letter of Intent up to and not exceeding £94,890, being 10% of the contract sum as allowed under the Council’s Contract Standing Orders.

Reasons for decision

Page 1 of 9 4.1 Approval of the successful competitive tender scheme is required to allow the contract to be awarded and the planned refurbishment and upgrading of the centralised mechanical ventilation services work to be ordered.

4.2The new system will protect residents within their properties in the event of a fire, as smoke will be detected as it is drawn into the vicinity of the extract grille by the negative pressure in the or bathroom or toilet. The air flow valve will shut down isolating the remainder of the riser within 5 seconds and an audible alarm will be activated.

4.3The current systems do not perform to the requirements of the Building Regulations Part F1. An historic combination of double glazing and draught- proofing and the deteriorated condition of the roof fans and ducts has caused a critical reduction of the ventilation rates to dwellings and this could lead to a consequential increase in dampness-related repairs. Restoring the ventilation schemes to beyond their original design performance will greatly reduce these issues and lead to reduced repair costs over the life of the system.

4.4The new system will be a smart, digital solution that has smart air terminals that have Bluetooth technology embedded which enables each terminal to be interrogated, cycle tested and validated as fully functional without access to the property itself and in real time. Further, data from the air terminal can be downloaded via this wireless link to detect instances in which the terminals alarm functions have been activated, the status of the standby battery and whether the device has been disconnected from the mains supply. All of this data is date and time stamped to aid analysis and compliance checking.

Alternative options considered

5.1The alternative option to repair the existing system which could result in on- going maintenance issues and not addressing the potential fire risk.

6. Background information

6.1These 6 very similar blocks each have their extract ventilation arranged via large rooftop centrifugal or mixed-flow fans and riser ducts with branches into each dwelling. The extract points served are the internal bathrooms and WCs.

6.2All of these systems are original equipment and the majority are over 40 years old and is, to a large degree out of service.

6.3CCTV surveys have been carried out and have confirmed that the internal surfaces of the ducts are very dirty and would contribute to both the spread of flame and the reduction of air flow rates.

6.4The existing systems can be characterised by these features:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Mechanical Improvement Works Phase 1 (2016/17)Minutes 327 KB DownloadRead as text

At this meeting

Whole meeting
22Mechanical Improvement Works Phase 1 (2016/17)This decision

Who was there

1 of 1 attended
AS
Councillor Alan StricklandChair, present

On this subject at Haringey

Search all
  1. Mechanical Improvement Works Phase 1 (2016/17)This decision
  2. Award of contract for Mechanical Ventilation Improvements (Phase 2) to Northolt, Kenley, Stellar House & Kenneth Robbins HouseApproved
  3. Northumberland Park Community School - swimming pool hall mechanical and electrical improvement worksApproved

More from Haringey Cabinet Member Signing

All decisions
MeetingDecisionOutcome
2 Nov 2026 Deaf Outreach Services ContractDECLARATIONS FOR THIS ITEM: NONE Decided Open
28 Oct 2026 Administrative amendment to Merchant Acquirer Re-ProcurementRESOLVED 1. To note the administrative error in the original report referring to Global Pay and Global Payments; 2. T... Noted Open
20 Oct 2026 Approval of Additional Expenditure and Final Payment to Accora Limited reportDECLARATIONS FOR THIS ITEM: NONE RESOLVED The Cabinet Member for Adults and Health: 1. Approved the variation of cont... Approved Open
16 Oct 2026 Approve Funding from Arts Council England to Haringey Music Service for the North London Music HubDECLARATIONS OF INTEREST MADE FOR THIS ITEM: None Decided Open
13 Oct 2026 Filming at meetingsThe notice of filming at meetings was noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies