Resolved
RESOLVED that the report be noted.
Alexandra Park and Palace Board noted this item on Monday 4 March 2019. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED that the report be noted.
1.1To note this report.
2. Introduction
2.1Capital Projects (outside the East Wing Project and the West Yard Project) are funded from the annual capital grant from the Corporate Trustee (£470,000) or the Restoration Levy on Trading Company ticket sales.
2.2At its meeting on 19th July 2018 Trustees approved the following maintenance budget priorities, fabric works to the basements (including investigations, opening up, structural and drainage) and roofing work (including access installation, glazing, repairs and redecoration).
2.3On 11th September 2018 the Board approved the Fabric Maintenance Plan priorities for the year with a focus on upgrading some of the organisation’s critical safety systems. Progress on the main projects and other capital investment is detailed below. 3. Table of capital works
3.1The Table below summarises the projects for 2018-19, which are funded from various grants including the Corporate Trustee grant and may run over a period of more than one year. More information is provided in the paragraphs below.
4. Progress on Critical safety systems
4.1Fire Main – A short term solution for water supply in the event of a fire has been agreed with the London Fire Brigade until the corroded pipes in the 1980’s fire main can be replaced. This is a significant improvement in fire protection for the Palace.
4.2Critical Fire Systems – the work to renew all of the smoke vent cabinets has been issued and these works are due for completion in February 2019.
4.3Diesel Fire System – the pump that backs up the fire sprinkler system for the whole building, has been replaced.
4.4Fire Networks – New fire alarm panels are, at the time of writing, being installed and the transfer over from the older panels is scheduled for February/ March 2019. This work was delayed due to the East court and theatre the project. The new panels have been installed and we are awaiting a confirmation date for when these panels will be switched over.
4.5West Hall duct works – The raising and reinstatement of the ventilation trunking to facilitate roof repairs will be carried out in February 2019, following leak detection surveys, to the west end of the roof over the West Corridor, with the eastern end planned for 2019/20. 4.6 Emergency Lighting – The current central battery systems (CBS) units are operational and will work in case of emergency, but if discharged may not be able to recharge. 6 CBS units have already been replaced and 5 need to be replaced as and when budget is allocated: the west hall (x2), the ice rink, roman bar, kitchen corridor. The West Hall replacements will be difficult to install due to the height locations of the CBS units.
5. Fabric Repairs
5.1Roof Repair and Access Works
5.1.1 The priority permanent roof access installations to the Great Hall, including handrails to parapets and latchway to corner flat roofs with no edge protection has been completed by IMS/PDSG in the sum of £24,656.10, with part funding from the Rose Foundation. The roof and glazing repairs and redecoration of the external space frames has been largely deferred into 2019/20, with the priority repairs to the spaceframes and trial decoration scheduled for February 2019. The remainder of this project to the Great Hall walkways, East and West Lightwells, SW Colonnades, and NW Hall will now be retendered to commence in early 2019/20.
5.1.2 The hooped ladder to the Theatre Foyer roof has been renewed, with part funding from the Rose Foundation, improving our level of compliance.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
Capital repair and maintenance progress reportMinutes | 200 KB | DownloadRead as text |
Follow Alexandra Park and Palace Board at Haringey and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 29 Oct 2026 | Charitable Trust Progress ReportThe Committee noted the report. | Noted | Open |
| 29 Oct 2026 | FRRAC Chair's Report (Verbal update)The Committee noted the report. | Noted | Open |
| 29 Oct 2026 | Finance ReportThe Committee noted the 2026/27 forecast against revised budget. | Noted | Open |
| 29 Oct 2026 | Panorama Room ReportThe Committee noted the report. | Noted | Open |
| 29 Oct 2026 | Environmental Sustainability UpdateThe Committee noted the contents of this report and approve the Carbon Reduction Plan at Appendix 1. | Noted | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.