Park View School - Award of Contract for Replacement of Sports Hall Roof and Associated Works

Approved Executive 1 paper

Cabinet Member Signing approved this item on Tuesday 13 April 2021. Below is the council's own wording, with the papers it was decided on.

Item3

Resolved

RESOLVED That the Cabinet Member for Children’s Services: 1. Approved the award of contract to Cosmur Construction to undertake works to replace the sports hall roof at Park View School, including all associated works (replacement of the sports hall ventilation, replacement of wall cladding, replacement of all downpipes and gutters and underground drainage) as a main contractor up to the value of £790,392.04. 2. Noted that the award value in 1.1 includes a contingency allowance of 10% that equates to £79,039.20 which will be strictly managed under change control governance arrangements. 3.1 and 3.2 offer a total award value up to £869,431.24. 3. Approved the issuance of a letter of intent in the sum of £100,000. Reasons for decision A major review of the condition and suitability of the Children’s Services estate has been undertaken which has informed the Children’s Service’s asset management plan (CSAMP). This identified condition and suitability deficiencies in the primary, secondary, and wider Children’s Service estate that need addressing in the short, medium, and long-term. The condition survey for Park View School identified issues relating to the condition of the Sports Hall Roof including regular water penetration during rainfall. These issues were backed up by the school providing information about the history of the water penetration and the failure of recent attempts to repair the roof. A feasibility study provided a more detailed investigation, and it was found that the roof was at the end of its design life and as a result areas of the roof were starting to fail. It was noted that it was becoming very difficult to patch repair the roof to prevent water penetration. The investigations also identified other issues that required addressing: · the wall cladding was of the same type and age as the roof and would, therefore be likely to fail. · The ventilation system for the Sports Hall no longer worked which presented a health and safety issue as there was an inadequate supply of fresh air. · There was no safe access to the roof for routine maintenance. · The existing gutters and downpipes are no longer sized adequately to cater for the currently predicted heavy rainfall events. · The underground drainage associated to the removal of rainwater from the sports hall has failed in a number of locations and needs significant repairs. It was agreed to include all of these works in the package to facilitate a successful roof replacement and to avoid future issues with water penetration and to comply with current Health and Safety regulations. Alternative options considered Doing nothing was considered, however since there was a significant ... view the full minutes text for item 3.
Word for word from the decision Haringey published for this meeting. Source: www.minutes.haringey.gov.uk

Follow this further

Built from Haringey's papers

What the report saysPro

Report to Cabinet Member Signing

Recommendations

3.1For the Cabinet Member for Children’s Services to approve the award of contract to Cosmur Construction to undertake works to replace the sports hall roof at Park View School, including all associated works (replacement of the sports hall ventilation, replacement of wall cladding, replacement of all downpipes and gutters and underground drainage) as a main contractor up to the value of £790,392.04.

3.2For the Cabinet Member for Children’s Services to note that the award value in 1.1 includes a contingency allowance of 10% that equates to £79,039.20 which will be strictly managed under change control governance arrangements. 3.1 and 3.2 offer a total award value up to £869,431.24.

3.3For the Cabinet Member for Children’s Services to approve the issuance of a letter of intent in the sum of £100,000.

Reasons for decision

Page 1 4.1 A major review of the condition and suitability of the Children’s Services estate has been undertaken which has informed the Children’s Service’s asset management plan (CSAMP). This identified condition and suitability deficiencies in the primary, secondary, and wider Children’s Service estate that need addressing in the short, medium, and long-term.

4.2The condition survey for Park View School identified issues relating to the condition of the Sports Hall Roof including regular water penetration during rainfall. These issues were backed up by the school providing information about the history of the water penetration and the failure of recent attempts to repair the roof.

4.3A feasibility study provided a more detailed investigation, and it was found that the roof was at the end of its design life and as a result areas of the roof were starting to fail. It was noted that it was becoming very difficult to patch repair the roof to prevent water penetration. The investigations also identified other issues that required addressing:

 the wall cladding was of the same type and age as the roof and would, therefore be likely to fail.  The ventilation system for the Sports Hall no longer worked which presented a health and safety issue as there was an inadequate supply of fresh air.  There was no safe access to the roof for routine maintenance.  The existing gutters and downpipes are no longer sized adequately to cater for the currently predicted heavy rainfall events.  The underground drainage associated to the removal of rainwater from the sports hall has failed in a number of locations and needs significant repairs.

4.4It was agreed to include all of these works in the package to facilitate a successful roof replacement and to avoid future issues with water penetration and to comply with current Health and Safety regulations.

Alternative options considered

5.1Doing nothing was considered, however since there was a significant water penetration issue and that temporary repairs were no longer effective it was felt that this option would result in structural damage to the building and the loss of educational use.

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Park View School: Award of Contract for Replacement of Sports Hall Roof and Associated WorksMinutes 197 KB DownloadRead as text

At this meeting

Whole meeting
3Park View School - Award of Contract for Replacement of Sports Hall Roof and Associated WorksThis decision
4EXCLUSION OF PRESS AND PUBLICDecided

Who was there

1 of 2 attended
KA
Councillor Kaushika AminCommittee Member, present
PS
Philip SlawtherSecretary, expected

On this subject at Haringey

Search all
  1. Park View School - Award of Contract for Replacement of Sports Hall Roof and Associated WorksThis decision
  2. Review of Parking Fees and Charges 2026-2027Decided
  3. Park View Secondary School Block A Roof Replacement - Award of Contract for Construction Related Consultancy ServicesDecided
  4. Park View Secondary School Block A Roof Replacement - Permission to initiate tender action for Construction Related Consultancy ServicesApproved
  5. Park View Secondary School Temporary Accommodation – Variation of Hire ContractApproved
  6. Car parking charges reviewApproved

More from Haringey Cabinet Member Signing

All decisions
MeetingDecisionOutcome
2 Nov 2026 Deaf Outreach Services ContractDECLARATIONS FOR THIS ITEM: NONE Decided Open
28 Oct 2026 Administrative amendment to Merchant Acquirer Re-ProcurementRESOLVED 1. To note the administrative error in the original report referring to Global Pay and Global Payments; 2. T... Noted Open
20 Oct 2026 Approval of Additional Expenditure and Final Payment to Accora Limited reportDECLARATIONS FOR THIS ITEM: NONE RESOLVED The Cabinet Member for Adults and Health: 1. Approved the variation of cont... Approved Open
16 Oct 2026 Approve Funding from Arts Council England to Haringey Music Service for the North London Music HubDECLARATIONS OF INTEREST MADE FOR THIS ITEM: None Decided Open
13 Oct 2026 Filming at meetingsThe notice of filming at meetings was noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies