RESOLVED 1. To GRANT planning permission and that the Head of Development Management is authorised to issue the planning permission and impose conditions and informatives subject to the signing of a section 106 Legal Agreement providing for the obligation set out in the Heads of Terms below. 2. That delegated authority be granted to the Head of Development Management or the Assistant Director Planning to make any alterations, additions or deletions to the recommended heads of terms and/or recommended conditions as set out in this report and to further delegate this power provided this authority shall be exercised in consultation with the Chair (or in their absence the Vice-Chair) of the Sub-Committee. 3. That the section 106 legal agreement referred to in resolution (1) above is to be completed no later than 18/01/ 2022 or within such extended time as the ... view the full minutes text for item 9.
Word for word from the decision Haringey published for this meeting.Source: www.minutes.haringey.gov.uk
UPDATE FOR CONSIDERATION AT PLANNING SUB-COMMITTEE Item No. 9
Reference No: HGY/2020/3186 Ward: Northumberland Park
Address: Unit 7 Unicorn Works 21-25 Garman Road N17 0UN
Proposal: Erection of two-storey replacement light industrial unit
Applicant: [name removed]: Private
The final parking layout and Transportation comments published have been superseded by the attached and are set out below and reflected in the Conditions and Obligation:
4. CONSULTATION RESPONSE
Vehicle Access and Swept Paths
The applicant has indicated in the Transport Statement and on the plans that the units are proposed to be accessible to vans that would enter them.
Swept paths of such vehicles entering and exiting each unit, as well as the manoeuvres needed to be performed from and to the highway, were requested. In addition, it was requested that the proposed car parking spaces outside Units 1, 2 and 3A be relocated as they would block vehicle access to these units.
Highway Works / Proposed Parking Layout
Considering the swept paths provided, a number of amendments to the proposed parking and loading layouts were then requested (a list of which is available in a more detailed email) to make the parking and loading layouts acceptable. The location of the existing crossovers and the structural damage to the footway along the site as a result of the fire were a starting point for and informed the re-provision of the public highway on a like-for-like basis and to high-quality standards.
For the purpose of the scope of the S.278 highway works, the following itemised list of works was reviewed by the Engineering Projects team, who provided an estimate for the S.278 works, to feed into the draft S.278 agreement: Re-instatement (and potential widening/displacement – to be confirmed) of the central crossover; Re-instatement of the footway outside the site; Re-provision of the loading bay sign on the footway; and Potential amendment to the on-street loading bay and Traffic Management order (to be confirmed).
Proposed Cycle Parking The applicant proposes 36 cycle parking spaces across the 6 units, or 6 per unit, which therefore satisfies the minimum London Plan (2021) minimum cycle parking standards. The external doors granting access to the cycle parking area in each unit should be 1.2m wide at least. Long-stay parking should be provided either in the form of Sheffield stands, or a mixture of Sheffield stands and two-tier racks. A clear headroom of at least 2.6m is required to install two-tier racks.
In addition to long-stay cycle parking, short-stay (visitor) cycle parking should also be provided, with a minimum of 3 spaces (rounded up to 4 spaces). Short-stay parking should be located outside the building, within the site’s boundaries and near the entrances of the building, and provided in the form of 2 Sheffield stands.
Supporting facilities are recommended, including changing rooms, lockers and shower facilities. Accessible facilities for disabled cyclists should also be provided.
The adequacy of the long-stay and short-stay cycle parking and access arrangements is to be secured by planning condition. This will involve the provision of full details showing the parking systems to be used, access to them, the layout and space around the cycle parking spaces with all dimensions marked up on a plan.
Additional Documents
A Construction Management Plan (incorporating a Construction Logistics Plan) and a Delivery and Servicing Plan are to be secured by planning conditions.
We would not object to the proposed development being granted planning permission on transport grounds, subject to the following planning condition and S.106 heads of terms.
Planning Conditions
Planning Conditions
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.