Woodridings Court N22 Award of Construction Contract

Approved Executive 2 papers

AI summaryHaringey Cabinet Member for Housing approves award of construction contract to Contractor A to build 37 new council homes at Woodridings Court N22, plus land appropriation and powers to override third-party rights.

AI summaryIn plain English

Written from the decision and the officer reportPDF Pro
OutcomeApproved37 new council homes at Woodridings Court N22
MoneyContract sum and total scheme cost are in the exempt Appendix 2
What happens nextContract execution Autumn 2026Practical completion anticipated early spring 2028
Who it affectsResidents of Alexandra Ward N22Plus future tenants of the 37 new homes

What was decided

Approved appointment of Contractor A to deliver 37 new build homes adjoining Woodridings Court N22, with a Letter of Intent for up to 10% of the contract value and delegation to the Delivery Director for contingencies. Report 3.1, 3.8, 3.9, 4.2

Approved appropriation of the hatched-red land from housing to planning purposes, use of Section 203 powers to override third-party rights, and delegation to settle any resulting compensation claims. Report 3.3, 3.4, 3.5, 6.36, 6.37

Approved that, on practical completion, the land will be appropriated back to the Housing Revenue Account for housing purposes under the Housing Act 1985, and approved the total scheme cost in the exempt appendix. Report 3.6, 3.7, 9.13, 9.20, 9.21

Why

The site, disused for around 30 years, was approved by Cabinet in July 2019 for the Housing Delivery Programme; planning consent was granted in March 2023 and a Section 73 application adding a storey and four more homes was approved in December 2025. Report 4.1, 4.4, 6.1, 6.2, 6.27

The scheme will deliver 37 social rent homes including three M4(3) wheelchair-accessible homes, landscaped communal gardens, cycle and refuse facilities, and new lifts serving the existing 56 flats. Report 4.4, 6.2, 9.26, 9.30

Using Section 203 powers converts any interference with third-party rights into a compensation claim rather than an injunction, and appropriation back to housing purposes is needed so the new homes can be offered as council tenances. Report 5.4, 5.5, 6.37, 9.13

What happens next

Contract to be executed and site possession granted in Autumn 2026, with construction to follow and practical completion expected by early spring 2028. Report 6.15

Construction will be a category 1 volumetric (modular) build on a JCT Design and Build 2016 contract, with a 12-month defects liability period after practical completion. Report 6.5, 6.14, 6.30, 6.34

On practical completion the land will be appropriated from planning back to the Housing Revenue Account, and the new homes managed as part of the council's housing stock. Report 3.6, 9.13, 9.21

The money

  • up to 10% of the contract value Letter of Intent issuance to Contractor A Report 3.8

Options considered

  • Chosen: Proceed with development as a council housing scheme. Delivers much-needed affordable homes and supports the Housing Delivery Programme target of 3,000 new council homes by 2031. Report 5.1, 6.2
  • Chosen: Re-tender via the LCP Minor Works Dynamic Purchasing System after the June 2025 sole bid exceeded budget. Offered stronger market engagement, cost benchmarking and value for money than a restricted tender or direct LCP framework award. Report 5.2, 5.3, 6.10
  • Rejected: Do not appropriate the site for planning purposes. Would expose the scheme to delays or legal challenges from third-party claims, converting into injunction risk rather than compensation. Report 5.4, 6.37
  • Rejected: Leave the land appropriated for planning purposes and not return it to housing use. Would prevent the council from offering the new homes under secure tenancies, undermining the affordable housing commitment. Report 5.5

Implications

  • Legal: The council will use Section 203 of the Housing and Planning Act 2016 to override easements and third-party rights, with statutory compensation payable for any valid claims. Report 3.4, 3.5, 6.37, 6.40, 9.11, 9.12
  • Financial: The scheme is funded through the Housing Revenue Account capital programme and will be managed within the New Build and Acquisitions budget; specific sums are in the exempt appendix. Report 6.8, 9.20, 9.22, 11.1
  • Equalities: An Equality Impact Assessment concluded the decision will have a positive impact, including for households in temporary accommodation, women, young people and BAME residents disproportionately represented on the housing register. Report 9.27, 9.28, 9.29, 9.30
  • Climate: Design follows Passivhaus principles and includes air source heat pumps, rooftop solar panels, high insulation and airtightness, and overheating mitigation, aligned with the Climate Change Action Plan. Report 7.2, 8.1, 8.2, 8.3
  • Risk: Proximity to an active Network Rail line imposes strict design, construction and ongoing maintenance constraints requiring coordination with Network Rail. Report 6.6, 6.15

Who and where

  • Future tenants of the 37 new social rent homes in Alexandra Ward N22, including three wheelchair-accessible households Report 4.4, 6.2, 9.26
  • Existing residents of Woodridings Court, who will gain new lifts, landscaping, refuse and cycle facilities and shared green space Report 6.2, 8.2
  • Households on the housing register and in temporary accommodation across the borough Report 9.27, 9.28, 9.29
  • Adjacent landowners and neighbours whose third-party rights may be overridden under Section 203, with a right to compensation Report 3.4, 3.5, 4.3, 6.37, 6.40

Timeline

  • July 2019: Cabinet approved site for inclusion in the Housing Delivery Programme Report 4.1, 6.2
  • 2 August 2021 to 2 September 2021: Section 105 consultation with 56 secure tenants and leaseholders Report 6.20, 6.24
  • September 2021 to 17 October 2021: Community engagement events held Report 6.21
  • 15 March 2023: Planning consent granted for 33 apartments (ref HGY/2022/2354) Report 6.27
  • December 2024: Section 73 application submitted for an additional storey and four more homes Report 4.1
  • November 2025: Section 73 consent granted (ref HGY/2024/3339); report records December 2025 elsewhere Report 4.1
  • 16 April 2026: Re-tender documents issued via the LCP Minor Works Dynamic Purchasing System Report 6.11
  • 5 June 2026: Final tender submissions received Report 6.11
  • 28 September 2026: Cabinet Member decision to award the construction contract and approve land appropriation
  • Autumn 2026: Anticipated contract execution and site possession Report 6.15
  • Early spring 2028: Anticipated practical completion of the development Report 6.15

Plain English for the jargon

  • HRA: Housing Revenue Account, the ring-fenced account local authorities use for council housing income and spending.
  • Section 105 consultation: Formal consultation required by Section 105 of the Housing Act 1985 with secure tenants when changes are proposed to housing accommodation.
  • Section 122 LGA 1972: Power allowing a principal council to appropriate land it owns for another purpose, provided the land is no longer needed for its current use.
  • Section 203 Housing and Planning Act 2016: Power that lets a council override third-party rights (such as easements) affected by a development once land is appropriated for planning, converting interference into a right to compensation.
  • Section 73 application: Application to vary or remove conditions on an existing planning permission.
  • JCT Design and Build 2016: A standard form of building contract published by the Joint Contracts Tribunal under which the contractor completes the design and constructs the works.
  • M4(3): Building regulation standard for wheelchair-accessible dwellings, Category 3 (accessible and adaptable for wheelchair users).
  • DPS (Dynamic Purchasing System): An electronic procurement process open to qualifying suppliers, used here through the LCP Minor Works DPS for Lots 1 and 2.
  • MEAT: Most Economically Advantageous Tender, the procurement evaluation approach combining quality, price and social value.
  • Passivhaus: A rigorous low-energy design standard focusing on high insulation, airtightness and controlled ventilation to cut energy use.
What was decided, why, and what happens next

Pro reads every officer report for you and explains each decision in plain English: the money, the options, the risks, the timeline, each with the paragraph it came from.

Written by AI from the council's published papers. AI can get things wrong: the council's own wording below is the record.Report a problem
Item21

Resolved

DECLARATIONS FOR THIS ITEM: NONE RESOLVED The Cabinet Member for Housing: 3.1 Approved the appointment of Contractor A, as identified in the Appendix 2 - part B exempt report, to undertake the new build works to deliver 37 new build homes on the land adjoining the existing Woodridings Court in N22, for the contract sum as set out in the Appendix 2 – part B exempt report. 3.2 Noted and considers the engagement and consultation undertaken in relation to this site, as detailed in paragraphs 6.16 of this report. 3.3 Approved the appropriation of the land hatched red on the Site Plan at Appendix 1 from housing Page 2 purposes to planning purposes pursuant to Section 122 of the Local Government Act 1972, on the basis that the land is no longer required for its current purpose and to facilitate the delivery of the development. 3.4 Approved, upon appropriation the land for planning purposes, the use of the Council’s powers under Section 203 of the Housing and Planning Act 2016 to override any easements and other third-party rights and interests that may be infringed by the development. 3.5 Delegated authority to the Director of Capital Projects and Property, in consultation with the Corporate Director of Finance and Resources and the Cabinet Member for Housing and Planning, to agree and make any necessary compensation payments arising from valid claims relating to third-party rights affected by the development, in accordance with the Council’s scheme of delegation. 3.6 Approved the appropriation of the land shown hatched red on the Site Plan at Appendix 1 from, planning purposes back to the Housing Revenue Account (HRA) for housing purposes under Section 122 of the Local Government Act 1972 and Section 19 of the Housing Act 1985 , such appropriation to take effect upon practical completion of the development 3.7 Approved the total scheme cost as set out in the Appendix 2 - part B exempt report. 3.8 Approved the issuance of a Letter of Intent for up to 10% of the contract value, as detailed in Appendix 2 - part B of the report. 3.9 Delegated authority to the Delivery Director for expenditure of contingencies as set out in the exempt part of this report in accordance with Haringey’s change control procedure. Reasons for decisions 4.1 The site is located in the Alexandra Ward area N22. The site was approved by Cabinet in July 2019 for inclusion in the Council’s Housing Delivery Programme. Planning consent was granted for the delivery of 33 apartments in March 2023. A further S73 was submitted to planning in December 2024 for an additional story and additional 4 apartments. The application was approved in December 2025. The site is now ready to progress to the construction phase. This report therefore marks the final Members’ decision required to proceed with the development of this scheme. 4.2 Contractor A has been identified through a formal tender process as the preferred contractor to deliver 37 new homes and associated facilities. 4.3 There are ...
Word for word from the decision Haringey published for this meeting. Source: www.minutes.haringey.gov.uk

Follow this further

Built from Haringey's papers

What the report saysPro

Report to Cabinet Member Signing

Recommendations

It is recommended that Cabinet Member for Housing:

3.1Approves the appointment of Contractor A, as identified in the Appendix 2 - part B exempt report, to undertake the new build works to deliver 37 new build homes on the land adjoining the existing Woodridings Court in N22, for the contract sum as set out in the Appendix 2 – part B exempt report.

3.2Notes and considers the engagement and consultation undertaken in relation to this site, as detailed in paragraphs 6.16 of this report.

3.3Approves the appropriation of the land hatched red on the Site Plan at Appendix 1 from housing purposes to planning purposes pursuant to Section 122 of the Local Government Act 1972, on the basis that the land is no longer required for its current purpose and to facilitate the delivery of the development.

3.4Approves, upon appropriation the land for planning purposes, the use of the Council’s powers under Section 203 of the Housing and Planning Act 2016 to override any easements and other third-party rights and interests that may be infringed by the development.

3.5Delegates authority to the Director of Capital Projects and Property, in consultation with the Corporate Director of Finance and Resources and the Cabinet Member for Housing and Planning, to agree and make any necessary compensation payments arising from valid claims relating to third-party rights affected by the development, in accordance with the Council’s scheme of delegation.

3.6Approves the appropriation of the land shown hatched red on the Site Plan at Appendix 1 from, planning purposes back to the Housing Revenue Account (HRA) for housing purposes under Section 122 of the Local Government Act 1972 and Section 19 of the Housing Act 1985 , such appropriation to take effect upon practical completion of the development

3.7Approves the total scheme cost as set out in the Appendix 2 - part B exempt report.

3.8Approves the issuance of a Letter of Intent for up to 10% of the contract value, as detailed in Appendix 2 - part B of the report.

3.9Delegates authority to the Delivery Director for expenditure of contingencies as set out in the exempt part of this report in accordance with Haringey’s change control procedure.

4. Reasons for decisions

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
Red lne plan Woodridings CourtAppendix 1 1.4 MB Download
PDF
Woodridings Court N22 Award of Construction ContractMinutes 213 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

0 of 1 attended
TH
Councillor Tammy HymasCommittee Member, expected

On this subject at Haringey

Search all
  1. Woodridings Court N22 Award of Construction ContractThis decision
  2. Approval to tender, Land rear of Woodridings Court N22Decided

More from Haringey Cabinet Member Signing

All decisions
MeetingDecisionOutcome
2 Nov 2026 Deaf Outreach Services ContractDECLARATIONS FOR THIS ITEM: NONE Decided Open
28 Oct 2026 Administrative amendment to Merchant Acquirer Re-ProcurementRESOLVED 1. To note the administrative error in the original report referring to Global Pay and Global Payments; 2. T... Noted Open
20 Oct 2026 Approval of Additional Expenditure and Final Payment to Accora Limited reportDECLARATIONS FOR THIS ITEM: NONE RESOLVED The Cabinet Member for Adults and Health: 1. Approved the variation of cont... Approved Open
16 Oct 2026 Approve Funding from Arts Council England to Haringey Music Service for the North London Music HubDECLARATIONS OF INTEREST MADE FOR THIS ITEM: None Decided Open
13 Oct 2026 Filming at meetingsThe notice of filming at meetings was noted. Noted Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies