Resolved
That the Environment Agency be notified and re-consulted on the decision to approve the application and; Subject to no objections raising additional material planning considerations by the end of the consultation period, the Officers named in the Scheme of Delegation to Officers be authorised to approve the application subject to the following conditions and any further conditions considered necessary by officers. 1 A01 (Time limit for commencement (full permission)) Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. 2 B01 (Samples of external materials) Reason: To ensure that the materials harmonise with the surroundings. 3 H05 (Access gates) Reason: In the interests of highway safety. 4 H13 (Access, turning area and parking) Reason: In the interests of highway safety and to ensure the free flow of traffic using the adjoining highway. 5 H27 (Parking for site operatives) Reason: To prevent indiscriminate parking in the interests of highway safety. 6 Foul water and surface water discharges must be drained separately from the site. Reason: To protect the integrity of the public sewerage system. 7 No surface water shall be allowed to connect (either directly or indirectly) to the public sewerage system. Reason: To prevent hydraulic overload of the Public Sewerage System and pollution of the environment. 8 No land drainage run-off will be permitted to discharge to the Public Sewerage System. Reason: To prevent hydraulic overload of the Public Sewerage System and pollution of the environment. 9 Prior to the first occupation of the dwellings residents shall be advised in writing to place themselves on the Environment Agency's flood warning system. Written confirmation that this advice has been issued shall be submitted to and approved in writing by the local planning authority. Reason: To ensure that residents are made aware of the potential flooding to the highway. Informatives: 1 The Environment Agency Flood Defence team can be contacted in Monmouth on 01600 771145 with regard to the flood warning system. 2 If a connection is required to the public sewerage system, the developer is advised to contact the Network Development Consultants (DVWW Sewerage Agents) on tel: 01443 331155. 3 HN04 - Private apparatus within highway. 4 HN05 - Works within the highway. 5 Your attention is drawn to the concerns of the Environment Agency who maintain that the access to the site could be affected by flooding at a rate of 1% apf (annual probability flooding). The Council can take no legal responsibility whatsoever in the event of a flood. 6 N15 – Reasons for the Grant of PP/LBC/CAC.