Resolved
That planning permission be granted subject to the following conditions: 1 A01 (Time limit for commencement (full permission)) Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. 2 A07 (Development in accordance with approved plans) Reason: To ensure adherence to the approved plans in the interests of a satisfactory form of development. 3 B01 (Samples of external material) Reason: To ensure that the materials harmonise with the surroundings. 4 E19 (Obscure glazing to windows) Reason: In order to protect the residential amenity of adjacent properties. 5 E17 (No windows in side elevation of extension) Reason: In order to protect the residential amenity of adjacent properties. 6 Foul water and surface water discharges must be drained separately from the site. Reason: To protect the integrity of the public sewerage system. 7 No surface water shall be allowed to connect (either directly or indirectly) to the public sewerage system. Reason: To prevent hydraulic overload of the public sewerage system, to protect the health and safety of existing residents and ensure no detriment to the environment. 8 No land drainage run-off will be permitted, either directly or indirectly, to discharge to the public sewerage system. Reason: To prevent hydraulic overload of the public sewerage system and pollution of the environment. 9 E16 (Removal of permitted development rights) Reason: To protect the character and amenities of the surrounding area. 10. Prior to the commencement of development, a detailed plan, showing the levels of the existing site, the proposed slab levels of the dwellings approved and a datum point outside of the site, shall be submitted to and approved by the local planning authority. Development shall be carried out in accordance with the approved details. Reason: In order to define ... view the full minutes text for item 37.