CouncilMonitor
194 principal councils 228,996 meetings since 2000 2.8 million official papers archived Straight from each council's own publication system
Herefordshire Council
Southern Area Planning Sub-Committee, Wednesday 21 December 2005 at 2.00pm

DCSE2005/3624/F - OVERROSS FARM, OVERROSS, ROSS-ON-WYE, HEREFORDSHIRE, HR9 7GX

Decided Planning 1 paper

Southern Area Planning Sub-Committee decided this item on Wednesday 21 December 2005. Below is the council's own wording, with the papers it was decided on.

Item95

Resolved

That planning permission be granted subject to the following conditions. 1 A01 (Time limit for commencement (full permission)) Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. 2 A09 (Amended plans) Reason: To ensure the development is carried out in accordance with the amended plans. 3 B01 (Samples of external materials) Reason: To ensure that the materials harmonise with the surroundings. 4 E17 (No windows in side elevation of dwellings) Reason: In order to protect the residential amenity of adjacent properties. 5 G01 (Details of boundary treatments) Reason: In the interests of visual amenity and to ensure dwellings have satisfactory privacy. 6 G02 (Landscaping scheme (housing development)) Reason: To ensure a satisfactory and well planned development and to preserve and enhance the quality of the environment. 7 G03 (Landscaping scheme (housing development) - implementation) Reason: To ensure a satisfactory and well planned development and to preserve and enhance the quality of the environment. 8 W01 (Foul/surface water drainage) Reason: To protect the integrity of the public sewerage system. 9 W02 (No surface water to connect to public system) Reason: To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no detriment to the environment. 10 W03 (No drainage run-off to public system) Reason: To prevent hydraulic overload of the public sewerage system and pollution of the environment. 11 H11 (Parking - estate development (more than one house)) Reason: In the interests of highway safety and to ensure the free flow of traffic using the adjoining highway. 12 H27 (Parking for site operatives) Reason: To prevent indiscriminate parking in the interests of highway safety. Informatives: 1 N15 - Reason(s) for the Grant of Planning Permission
Word for word from the decision Herefordshire published for this meeting. Source: councillors.herefordshire.gov.uk

Follow this further

Built from Herefordshire's papers

What the report saysPro

Report to Southern Area Planning Sub-Committee

SOUTHERN AREA PLANNING SUB-COMMITTEE 21ST DECEMBER, 2005

6 DCSE2005/3624/F - ERECTION OF TWO DWELLINGS AT LAND AT OVERROSS FARM, OVERROSS, ROSS- ON-WYE, HEREFORDSHIRE, HR9 7GX

For: Casepress Ltd per Neil Vesma Architects Ltd, 43 Brunswick Road, Gloucester, GL1 1JS

Date Received: 10th November 2005 Ward: Ross-on-Wye East Grid Ref: 60695, 25330 Expiry Date: 5th January 2006 Local Member: Councillor Mrs. A.E. Gray and Councillor Mrs. C.J. Davis

1. Site Description and Proposal

1.1The site is within the settlement of Ross-on-Wye, as defined in the South Herefordshire District Local Plan and is located off a narrow track which adjoins the B4228 Ledbury Road. The track provides rear access to a number of properties along Ledbury Road and Overross Farm and passes along the southwestern boundary of the site, with another track passing adjacent to the northwestern site boundary. The 0.1 hectare site comprises unused, vacant land, which has recently been cleared of the majority of its vegetation. There is existing residential development to three sides of the site, all which back onto the site. The site is seperated from the development to the northeast by a tall brick wall.

1.2Planning permission is sought for the erection of two detached, two storey dwellings each with a detached double garage. The dwellings would be of the same design, but Plot 2 would be a handed version of Plot 1. The dwellings would be of a hipped roof, mock Georgian design, with a conservatory to the rear elevation. The dwellings would be 7.3 metres to the roof ridge and would also include a chimney.

2. Policies

2.1Hereford and Worcester County Structure Plan

Policy CTC9 - Development Criteria Policy H16A - Development Criteria Policy H18 - Housing in Rural Areas

2.2South Herefordshire District Local Plan

Policy GD1 - General Development Criteria Policy SH5 - Housing Land in Ross on Wye Policy SH14 - Siting and Design of Buildings Policy SH15 - Criteria for New Housing Schemes Policy T3 - Highway Safety Requirements Part 3, chapter 37 Policy 2 - New Housing Developments Policy 3 - Infill Sites for Housing Policy 4 - Primarily Residential Areas Policy 5 - Housing in Built-up Areas

Further information on the subject of this report is available from [name removed] on 01432 260536 SOUTHERN AREA PLANNING SUB-COMMITTEE 21ST DECEMBER, 2005

2.3Herefordshire Unitary Development Plan – (Revised Deposit Draft)

Part 1 Policy S2 - Development Requirements Policy S3 - Housing

Part 2 Policy H1 - Hereford and the Market Towns: Settlement Boundaries and Established Residential Areas Policy H16 - Car Parking

3. Planning History

3.1SE2003/3296/O Site for five houses - Refused 22.1.2004 SE2004/0349/O Site for one dwelling - Granted 14.4.2004

4. Consultation Summary

Statutory Consultations

4.1Welsh Water - No objections, recommend conditions.

Internal Council Advice

4.2The Traffic Manager raises no objections. Although access to the public highway is via a narrow service road, this already serves a number of surrounding dwellings. I note that outline planning permission for a single dwelling already exists at this site and the increase in traffic produced by the addition of one extra dwelling would not justify refusal on highway grounds. The proposed turning area for the garages does appear restricted and this should be considered if any re-siting of the dwellings is proposed.

5. Representations

4.1Ross on Wye Town Council - comments awaited.

4.2Six letters of representation have been received from Stephen Parry and Rhian Griffiths of Rossendale, Ledbury Road, [name removed] and [name removed] of [address removed], N. A Boycott and S.A Maxfield of 'Heaven Sent', 4, The Walled Garden, Tim and Gill Rigden of Croeso, The Walled Garden, Rachel and Lawrence Morgan of 1, The Walled Garden and W Morgan of Cadora Wood, Ledbury Road. The main points raised are:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
DCSE2005/3624/F: OVERROSS FARM, OVERROSS, ROSS-ON-WYE, HEREFORDSHIRE, HR9 7GXReport 680 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

13 of 16 attended
GD
Councillor Godfrey DavisMember, present
MJ
Councillor Mrs. Joyce DavisMember, present
MR
Councillor Mrs. Ruth LincolnChairperson, present
PT
Councillor Phil TurpinVice-Chairperson, present
HB
Councillor Harry BramerMember, present
RC
Ricky ClarkeSecretary, expected
MC
Councillor Mark CunninghamMember, present
ND
Councillor Nigel DaviesMember, present
JE
Councillor John EdwardsMember, present
PE
Councillor PJ Edwardsex-officio, in attendance
AG
Councillor AE GrayMember, present
TH
Councillor TW Huntex-officio, in attendance

All 16 on the meeting page

On this subject at Herefordshire

Search all
  1. DCSE2005/3624/F - OVERROSS FARM, OVERROSS, ROSS-ON-WYE, HEREFORDSHIRE, HR9 7GXThis decision
  2. DCSE2008/0259/F - BROOKFIELD HOUSE, OVERROSS STREET, ROSS-ON-WYE, HR9 7AT. (Agenda Item 7)Approved
  3. DCSE2006/1431/A - OVERROSS GARAGE LTD, OVERROSS STREET, ROSS-ON-WYE, HR9 7AS (Agenda Item 10)Approved
  4. DCSE2004/2701/F - LAND AT 28 OVERROSS FARM, ROSS-ON-WYE, HEREFORDSHIRE (Agenda Item 19)Approved
  5. Dcse2004/2866/f - brookfield lodge, overross street, ross-on-wye, hereford, hr9 7at (agenda item 20)Approved
  6. DCSE2004/3028/F - EDMO ENGINEERING LTD., OVERROSS INDUSTRIAL ESTATE, NETHERTON ROAD, ROSS-ON-WYE, HEREFORDSHIRE, HR9 7QQ (Agenda Item 11)Decided

More from Herefordshire Southern Area Planning Sub-Committee

All decisions
MeetingDecisionOutcome
23 Dec 2009 MINUTESThat the Minutes of the meeting held on 25 November 2009 be approved as a correct record and signed by the Chairman. Approved Open
23 Dec 2009 Dmse09/2571/f - ashdown, llangrove, ross-on-wye, herefordshire, hr9 6ep.RESOLVED That planning permission be granted subject to the following conditions: 1 A01 Time limit for commencement (... Approved Open
23 Dec 2009 Dmsw09/1993/f - oldfield farm, garway hill, hereford,RESOLVED That, subject to the receipt of details of the visibility splay and confirmation that the Traffic Manager is... Approved Open
23 Dec 2009 Dmse09/2727/f - caradoc court, sellack, ross-on-wye, herefordshire, hr9 6ls.RESOLVED That planning permission be granted subject to the following conditions: 1 A01 Time limit for commencement (... Approved Open
23 Dec 2009 Dmse09/2758/f - green orchard, ryefield road, ross-on-wye, herefordshire, hr9 5ls.RESOLVED That planning permission be granted subject to the following conditions: 1 A01 Time limit for commencement (... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies