Resolved
RESOLVED That planning permission be granted subject to the following conditions: 1 - A01 (Time limit for commencement (full permission)) Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. 2 - B01 (Samples of external materials) Reason: To ensure that the materials harmonise with the surroundings. 3 - Foul water and surface water discharges shall be drained separately from the site. Reason: To protect the integrity of the public sewerage system. 4 - No surface water shall be allowed to connect (either directly or indirectly), to the public sewerage system unless otherwise approved in writing by the Local Planning Authority. Reason: To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no detriment to the environment. 5 - Land drainage run-off shall not be permitted to discharge, either directly or indirectly, into the public sewerage system. Reason: To prevent hydraulic overload of the public sewerage system and pollution of the environment. 6 - No development approved by this permission shall be commenced until a scheme for the provision and implementation of a surface water regulation system including the use of Sustainable Urban Drainage Systems has been submitted to and approved in writing by the Local Planning Authority. The scheme shall be implemented in accordance with the approved details, unless otherwise agreed in writing by the Local Planning Authority, in consultation with the Environment Agency. Reason: To prevent the increased risk of flooding by ensuring the provision of a satisfactory means of surface water disposal. 7 - No works or development shall take place until a scheme for the protection of the retained trees (section 7, BS59837, the Tree Protection Plan) has been agreed in writing with the Local Planning Authority. This scheme shall include: a) a plan to a scale and level of accuracy appropriate to the proposal that shows the position, crown spread and Root Protection Area (para. 5.2.2 of BS5837) of every retained tree on site and on neighbouring or nearby ground to the site in relation to the approved plans and particulars. The positions of all trees to be removed shall be indicated on this plan. b) the details of each retained tree as required at para. 4.2.6 of BS5837 in a separate schedule. c) the details and positions (shown on the plan at paragraph (a) above) of the Ground Protection Zones (section 9.3 of BS5837). d) the details and positions (shown on the plan at paragraph (a) above) of the Tree Protection Barriers (section 9.2 of BS5837), identified separately where required for different phases of construction work (e.g. demolition, construction, hard landscaping). The Tree Protection ... view the full minutes text for item 77.