Resolved
That planning permission be granted subject to the following conditions: 1 A01 (Time limit for commencement (full permission)) Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. 2 B03 (Amended Plans) Reason: To ensure the development is carried out in accordance with the amended plans and to comply with the requirements of Policy DR1 of Herefordshire Unitary Development Plan. 3 ....... C01 (Samples of external materials) Reason: To ensure that the materials harmonise with the surroundings so as to ensure that the development complies with the requirements of Policy DR1 of Herefordshire Unitary Development Plan. 4 ....... F30 (Use as holiday accommodation) Reason: Having regard to Policy H7 of Herefordshire Unitary Development Plan the local planning authority are not prepared to allow the introduction of separate units of residential accommodation in this rural location. 5 ....... Prior to the commencement of development an Arboricultural Method Statement and Tree Protection Plan shall be submitted to and be approved in writing by the local planning authority. The work shall be carried out in accordance with the approved details. Reason: To ensure the proper care and maintenance of the trees and to conform with Policy LA5 of Herefordshire Unitary Development Plan. 6 ....... G02 (Retention of trees and hedgerows) Reason: To safeguard the amenity of the area and to ensure that the development conforms with Policy DR1 of Herefordshire Unitary Development Plan. 7 ....... I16 (Restriction of hours during construction) Reason: To protect the amenity of local residents and to comply with Policy DR13 of Herefordshire Unitary Development Plan. 8 ....... I18 (Scheme of foul drainage disposal) Reason: In order to ensure that satisfactory drainage arrangements are provided and to comply with Policy DR4 of Herefordshire Unitary Development Plan. 9 ....... L01 (Foul/surface water drainage) ......... Reason: To protect the integrity of the public sewerage system and to comply with Policy CF2 of Herefordshire Unitary Development Plan. 10 ..... L02 (No surface water to connect to public system) ......... Reason: To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no detriment to the environment so as to comply with Policy CF2 of Herefordshire Unitary Development Plan. 11 ..... L03 (No drainage run-off to public system) ......... Reason: To prevent hydraulic overload of the public sewerage system and pollution of the environment so as to comply with Policy CF2 of Herefordshire Unitary Development Plan. Informative(s): 1 ....... N19 – Avoidance of doubt – Approved Plans 2 ....... N15 – Reason(s) for the Grant of Planning Permission