Southern Area Planning Sub-Committee, Wednesday 25 June 2008 at 2.00pm

DCSW2008/0282/F - PILGRIM HOTEL, MUCH BIRCH, HEREFORD, HR2 8HJ. (Agenda Item 5)

Approved Planning 1 paper

Southern Area Planning Sub-Committee approved this item on Wednesday 25 June 2008. Below is the council's own wording, with the papers it was decided on.

Item13

Resolved

That planning permission be granted subject to the following conditions: 1 A01 (Time limit for commencement (full permission)) Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. 2 B03 (Amended Plans) Reason: To ensure the development is carried out in accordance with the amended plans and to comply with the requirements of Policy DR1 of Herefordshire Unitary Development Plan. 3 ....... C01 (Samples of external materials) Reason: To ensure that the materials harmonise with the surroundings so as to ensure that the development complies with the requirements of Policy DR1 of Herefordshire Unitary Development Plan. 4 ....... F30 (Use as holiday accommodation) Reason: Having regard to Policy H7 of Herefordshire Unitary Development Plan the local planning authority are not prepared to allow the introduction of separate units of residential accommodation in this rural location. 5 ....... Prior to the commencement of development an Arboricultural Method Statement and Tree Protection Plan shall be submitted to and be approved in writing by the local planning authority. The work shall be carried out in accordance with the approved details. Reason: To ensure the proper care and maintenance of the trees and to conform with Policy LA5 of Herefordshire Unitary Development Plan. 6 ....... G02 (Retention of trees and hedgerows) Reason: To safeguard the amenity of the area and to ensure that the development conforms with Policy DR1 of Herefordshire Unitary Development Plan. 7 ....... I16 (Restriction of hours during construction) Reason: To protect the amenity of local residents and to comply with Policy DR13 of Herefordshire Unitary Development Plan. 8 ....... I18 (Scheme of foul drainage disposal) Reason: In order to ensure that satisfactory drainage arrangements are provided and to comply with Policy DR4 of Herefordshire Unitary Development Plan. 9 ....... L01 (Foul/surface water drainage) ......... Reason: To protect the integrity of the public sewerage system and to comply with Policy CF2 of Herefordshire Unitary Development Plan. 10 ..... L02 (No surface water to connect to public system) ......... Reason: To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no detriment to the environment so as to comply with Policy CF2 of Herefordshire Unitary Development Plan. 11 ..... L03 (No drainage run-off to public system) ......... Reason: To prevent hydraulic overload of the public sewerage system and pollution of the environment so as to comply with Policy CF2 of Herefordshire Unitary Development Plan. Informative(s): 1 ....... N19 – Avoidance of doubt – Approved Plans 2 ....... N15 – Reason(s) for the Grant of Planning Permission
Word for word from the decision Herefordshire published for this meeting. Source: councillors.herefordshire.gov.uk

Follow this further

Built from Herefordshire's papers

What the report saysPro

Report to Southern Area Planning Sub-Committee

SOUTHERN AREA PLANNING SUB-COMMITTEE 25 JUNE 2008

5 DCSW2008/0282/F - ERECTION OF 4 NO. SINGLE STOREY HOTEL ACCOMMODATION SUITES, PILGRIM HOTEL, MUCH BIRCH, HEREFORD, HR2 8HJ.

For: Pilgrim Hotel per RRA Architects Ltd, Packers House, 25 West Street, Hereford, HR4 0BX.

Date Received: 5 February 2008 Ward: Pontrilas Grid Ref: 49989, 30813 Expiry Date: 1 April 2008 Local Member: Councillor RH Smith

Introduction

This proposal was deferred at the meetings on 2 and 30 April 2008.

1. Site Description and Proposal

1.1This site is located on the southern side of A49 Trunk Road adjacent to the northern limits of Much Birch. The Pilgrim Hotel is set within extensive grounds, extending up to 1.6 hectares, the major part of which is to the rear of the building. The original building is of stone construction with a slate roof. This has been extended primarily on either end in brick with tile roofs to provide additional accommodation and space for functions. To the front is a large car parking area. The access arrangements operate as a one-way system. The site is entered from the A49 but exited onto Tump Lane.

1.2The site adjoins open fields on its south-west and north-west sides but with the south- east boundary formed with recently built housing.

1.3This detailed application relates to an area next to the hotel itself and adjacent to the south-east boundary. It is proposed to construct a single storey building to provide four accommodation suites. The proposal has been revised since the original submission. The building now proposed would be some 14m by 9m with an eaves height of 2.1m and a ridge height of 4.3m. (The original proposed structure would have been 20m by 9m, with an eaves height of 2.5m and ridge height of 4.7m). In addition the corridor link to the main hotel building has been deleted. In its place a path is proposed. The external materials would be brick and tile to match those on the existing building. The existing mature trees are to be retained.

1.4On 28 March, 2008 a Tree Preservation Order was made in respect of the two beech and the cedar trees in the vicinity of the site.

2. Policies

2.1National Planning Policy

PPS1 - Delivering Sustainable Development PPG7 - Sustainable Development in Rural Areas Good Practice Guidance for Planning on Tourism

Further information on the subject of this report is available from [name removed] on 01432 260756 SOUTHERN AREA PLANNING SUB-COMMITTEE 25 JUNE 2008

2.2Herefordshire Unitary Development Plan 2007 Policy DR1 - Design Policy DR2 - Land Use and Activity Policy DR3 - Movement Policy DR4 - Environment Policy T11 - Parking Provision Policy LA2 - Landscape Character and Areas Least Resilient to Change Policy LA3 - Setting of Settlements Policy LA5 - Protection of Trees Policy LA6 - Landscaping Schemes Policy RST1 - Criteria for Recreation, Sport and Tourism Development Policy RST12 - Visitor Accommodation Policy CF2 - Foul Drainage

3. Planning History Most recent only

3.1DCSW2005/3946/F Single storey restaurant - Approved 26.01.06 extension DCSW2006/1753/F Conversion of roof space to - Approved 24.07.06 manager’s flat DCSW2007/0344/F Erection of 8 single storey - Withdrawn 05.02.08 hotel accommodation suites

4. Consultation Summary

Statutory Consultations

4.1Highways Agency has no objection. They comment that there will be some further vehicle movements but this should not significantly affect the safety or free-flow of vehicles on the A49 in this location and that the Tump Lane junction satisfies the required visibility standard.

4.2Welsh Water requests that if permission is granted conditions be imposed. These would ensure that foul and surface water is drained separately and that no surface water drainage connects to the public system.

Internal Council Advice

4.3The Traffic Manager has no objection subject to conditions.

4.4The Head of Environmental Health has no objection.

4.5Conservation Manager - Landscape Officer comments:

“There have been a number of responses, which can be summarised as follows:

Read every report as text, not just the decision

Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.

Papers for this item

Kept in our archive, download once signed in
PDF
DCSW2008/0282/F: PILGRIM HOTEL, MUCH BIRCH, HEREFORD, HR2 8HJ. (Agenda Item 5)Agenda 612 KB DownloadRead as text

At this meeting

Whole meeting

Who was there

11 of 17 attended
CB
Councillor CM BartrumMember, present
HB
Councillor Harry BramerMember, present
RC
Ricky ClarkeSecretary, expected
PC
Councillor PGH CutterChairperson, present
BD
Councillor Barry DurkinMember, present
MF
Councillor MJ FishleyVice-Chairperson, present
AG
Councillor AE GrayMember, apologies
TH
Councillor TW HuntIn Attendance, in attendance
JH
Councillor JA Hyde sadly passed away on Monday 11 February 2019.Member, present
JJ
Councillor JG JarvisMember, expected
GL
Councillor G LucasMember, present
JP
Councillor JE PembertonIn Attendance, in attendance

All 17 on the meeting page

On this subject at Herefordshire

Search all
  1. DCSW2008/0282/F - PILGRIM HOTEL, MUCH BIRCH, HEREFORD, HR2 8HJ. (Agenda Item 5)This decision
  2. DCSW2008/0282/F - PILGRIM HOTEL, MUCH BIRCH, HEREFORD, HR2 8HJ. (Agenda Item 5)Deferred
  3. DCSW2008/0282/F - PILGRIM HOTEL, MUCH BIRCH, HEREFORD, HR2 8HJ. (Agenda Item 8)Deferred

More from Herefordshire Southern Area Planning Sub-Committee

All decisions
MeetingDecisionOutcome
23 Dec 2009 MINUTESThat the Minutes of the meeting held on 25 November 2009 be approved as a correct record and signed by the Chairman. Approved Open
23 Dec 2009 Dmse09/2571/f - ashdown, llangrove, ross-on-wye, herefordshire, hr9 6ep.RESOLVED That planning permission be granted subject to the following conditions: 1 A01 Time limit for commencement (... Approved Open
23 Dec 2009 Dmsw09/1993/f - oldfield farm, garway hill, hereford,RESOLVED That, subject to the receipt of details of the visibility splay and confirmation that the Traffic Manager is... Approved Open
23 Dec 2009 Dmse09/2727/f - caradoc court, sellack, ross-on-wye, herefordshire, hr9 6ls.RESOLVED That planning permission be granted subject to the following conditions: 1 A01 Time limit for commencement (... Approved Open
23 Dec 2009 Dmse09/2758/f - green orchard, ryefield road, ross-on-wye, herefordshire, hr9 5ls.RESOLVED That planning permission be granted subject to the following conditions: 1 A01 Time limit for commencement (... Agreed Open

We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies