Resolved
RESOLVED THAT the determination of the application be deferred pending further discussions with the applicant in respect of the two mature beech trees.
Southern Area Planning Sub-Committee deferred this item on Wednesday 30 April 2008. Below is the council's own wording, with the papers it was decided on.
Resolved
RESOLVED THAT the determination of the application be deferred pending further discussions with the applicant in respect of the two mature beech trees.
SOUTHERN AREA PLANNING SUB-COMMITTEE 30 APRIL 2008
5 DCSW2008/0282/F - ERECTION OF 4 NO. SINGLE STOREY HOTEL ACCOMMODATION SUITES, PILGRIM HOTEL, MUCH BIRCH, HEREFORD, HR2 8HJ.
For: Pilgrim Hotel per RRA Architects Ltd, Packers House, 25 West Street, Hereford, HR4 0BX.
Date Received: 5 February 2008 Ward: Pontrilas Grid Ref: 49989, 30813 Expiry Date: 1 April 2008 Local Member: Councillor RH Smith
Introduction
This proposal was deferred at the meeting on 2 April 2008.
1. Site Description and Proposal
1.1This site is located on the southern side of A49 Trunk adjacent to the northern limits of Much Birch. The Pilgrim Hotel is set within extensive grounds, extending up to 1.6 hectares, the major part of which is to the rear of the building. The original building is of stone construction with a slate roof. This has been extended primarily on either end in brick with tile roofs to provide additional accommodation and space for functions. To the front is a large car parking area. The access arrangements operate as a one-way system. The site is entered from the A49 but exited onto Tump Lane.
1.2The site adjoins open fields on its south-west and north-west sides but with the south- east boundary formed with recently built housing.
1.3This detailed application relates to an area next to the hotel itself and adjacent to the south-east boundary. It is proposed to construct a single storey building to provide four accommodation suites. The structure would be 20m by 9m, with an eaves height of 2.5m and ridge height of 4.7m. In addition there would be a corridor link to the main hotel building. The external materials would be brick and tile to match those on the existing building. The proposal would involve the removal of the beech tree immediately adjacent to the hotel.
1.4On 28 March 2008 a Tree Preservation Order was made in respect of the two beech and the cedar trees in the vicinity of the site.
2. Policies
2.1National Planning Policy
PPS1 - Delivering Sustainable Development PPG7 - Sustainable Development in Rural Areas Good Practice Guidance for Planning on Tourism
2.2Herefordshire Unitary Development Plan 2007
Policy DR1 - Design
Further information on the subject of this report is available from [name removed] on 01432 260612 SOUTHERN AREA PLANNING SUB-COMMITTEE 30 APRIL 2008
Policy DR2 - Land Use and Activity Policy DR3 - Movement Policy DR4 - Environment Policy T11 - Parking Provision Policy LA2 - Landscape Character and Areas Least Resilient to Change Policy LA3 - Setting of Settlements Policy LA5 - Protection of Trees Policy LA6 - Landscaping Schemes Policy RST1 - Criteria for Recreation, Sport and Tourism Development Policy RST12 - Visitor Accommodation Policy CF2 - Foul Drainage
3. Planning History
Most recent only
3.1DCSW2005/3946/F Single storey restaurant - Approved 26.01.06 extension
DCSW2006/1753/F Conversion of roof space to - Approved 24.07.06 manager’s flat
DCSW2007/0344/F Erection of 8 single storey - Withdrawn 05.02.08 hotel accommodation suites
4. Consultation Summary
Statutory Consultations
4.1Highways Agency has no objection. They comment that there will be some further vehicle movements but this should not significantly affect the safety or free-flow of vehicles on the A49 in this location and that the Tump Lane junction satisfies the required visibility standard.
4.2Welsh Water requests that if permission is granted conditions be imposed. These would ensure that foul and surface water is drained separately and that no surface water drainage connects to the public system.
Internal Council Advice
4.3The Traffic Manager has no objection subject to conditions.
4.4The Head of Environmental Health has no objection.
4.5Conservation Manager - Landscape Officer comments:
Initial Comments
“From a landscape perspective, the proposed scheme is a significant improvement on the previous scheme. The fact that the new building is an extension means that it relates closely to the main hotel building and impinges much less on the parkland character of the hotel grounds.
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
PDF |
DCSW2008/0282/F: PILGRIM HOTEL, MUCH BIRCH, HEREFORD, HR2 8HJ. (Agenda Item 5)Agenda | 624 KB | DownloadRead as text |
Follow Southern Area Planning Sub-Committee at Herefordshire and we tell you when its next papers are published, before the meeting rather than after it.
| Meeting | Decision | Outcome | |
|---|---|---|---|
| 23 Dec 2009 | MINUTESThat the Minutes of the meeting held on 25 November 2009 be approved as a correct record and signed by the Chairman. | Approved | Open |
| 23 Dec 2009 | Dmse09/2571/f - ashdown, llangrove, ross-on-wye, herefordshire, hr9 6ep.RESOLVED That planning permission be granted subject to the following conditions: 1 A01 Time limit for commencement (... | Approved | Open |
| 23 Dec 2009 | Dmsw09/1993/f - oldfield farm, garway hill, hereford,RESOLVED That, subject to the receipt of details of the visibility splay and confirmation that the Traffic Manager is... | Approved | Open |
| 23 Dec 2009 | Dmse09/2727/f - caradoc court, sellack, ross-on-wye, herefordshire, hr9 6ls.RESOLVED That planning permission be granted subject to the following conditions: 1 A01 Time limit for commencement (... | Approved | Open |
| 23 Dec 2009 | Dmse09/2758/f - green orchard, ryefield road, ross-on-wye, herefordshire, hr9 5ls.RESOLVED That planning permission be granted subject to the following conditions: 1 A01 Time limit for commencement (... | Agreed | Open |
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Keeps you signed in and runs your free-paper allowance. Always on.
Counts visits and which pages are used. First-party only, no advertising, never shared.