DCSE2008/1376/F - H. WESTON & SON, THE BOUNDS, MUCH MARCLE, LEDBURY, HEREFORDSHIRE, HR8 2NQ (Agenda Item 6)
ApprovedPlanning1 paper
Southern Area Planning Sub-Committee approved this item on Wednesday 20 August 2008. Below is the council's own wording, with the papers it was decided on.
RESOLVED That planning permission be granted subject to the following conditions: 1 A01 (Time limit for commencement (full permission)) Reason: Required to be imposed by Section 91 of the Town and Country Planning Act 1990. 2 C03 (Matching external materials (general)) Reason: To ensure the satisfactory appearance of the development so as to ensure that the development complies with the requirements of Policy DR1 of Herefordshire Unitary Development Plan 3 G12 (Hedgerow planting) Reason: In order to maintain the visual amenity of the area and to comply with Policy LA6 of Herefordshire Unitary Development Plan. INFORMATIVES: 1 N19 - Avoidance of doubt - Approved Plans 2 N15 - Reason(s) for the Grant of Planning Permission
Word for word from the decision Herefordshire published for this meeting.Source: councillors.herefordshire.gov.uk
SOUTHERN AREA PLANNING SUB-COMMITTEE 20 AUGUST 2008
6 DCSE2008/1376/F - PROPOSED EXTENSION TO EXISTING BUILDING TO FORM AN OPEN SIDED LOADING BAY AT H. WESTON & SON, THE BOUNDS, MUCH MARCLE, LEDBURY, HEREFORDSHIRE, HR8 2NQ
For: H. Weston & Son per [name removed], 35 Caswell Crescent, Leominster, Herefordshire, HR6 8BE.
Date Received: 23 May 2008 Ward: Old Gore Grid Ref: 64884, 33207 Expiry Date: 18 July 2008 Local Member: Councillor BA Durkin
1. Site Description and Proposal
1.1The Bounds, Much Marcle is located in open countryside to the west of Much Marcle village. The site, which rises from the east to west, lies adjacent to the C1262. The site comprises buildings of differing sizes and designs, ranging from traditional agricultural barns, modern portal framed buildings and silo storage tanks. An orchard separates the site from the adjacent C1262 and there are also orchards on lower ground to the north and east. The site has a long history of cider production.
1.2The application proposes the erection of an open sided building to cover an existing loading area to the north east of the bottling hall and storage building. The building will provide a protected area for transporting finished products to the store and similarly for loading vehicles. The requirement for the building has arisen due to the need to address the existing movement of vehicles on site to provide both a safe environment and to improve the efficiency of operations. A one way system will operate for the loading and unloading of vehicles. The building will be 7.34m high and will join the existing building which is 12m high. The roof material will match the adjacent buildings.
2. Policies
2.1Planning Policy Guidance
PPS1 - Delivering Sustainable Development PPS7 - Sustainable Development in Rural Areas PPG4 - Industrial and Communal Development and Small Firms
2.2Herefordshire Unitary Development Plan
Policy S1 - Sustainable Development Policy S2 - Development Requirements Policy S6 - Transport Policy DR1 - Design Policy DR3 - Movement Policy E6 - Expansion of Existing Businesses Policy E8 - Design Standards for Employment Sites Policy E11 - Employment in the Smaller Settlements and Open Countryside Policy T11 - Parking Provision
Further information on the subject of this report is available from [name removed] on 01432 383083 SOUTHERN AREA PLANNING SUB-COMMITTEE 20 AUGUST 2008
3. Planning History
3.1MH90/2282 Reception Centre and Museum - Approved MH96/0100 Bottle storage building, agricultural implement - Approved shed and vehicle maintenance building. MH97/0913 Retrospective application for extension to - Approved bottle storage building NE1999/2591/F Conversion of existing agricultural buildings - Approved and change of use from existing storage to 09.11.99 offices. NE2002/0260/F Create car park for 80 cars and 2 coaches. - Approved 20.03.02 NE2002/1106/F Extension to warehouse. - Approved 24.05.02 NE2002/2772/F Cider production building - Approved 27.11.02 DCSE2004/0956/F Move weighbridge and stone surface track - Approved (retrospective) 11.05.04 DCSE2004/1003/F Finished Product Storage Building - Approved 06.06.04 DCSE2004/2759/F Extension to rear of office building to provide - Approved disabled toilet and other toilets 04.11.04 DCSE2004/2974/F Children’s play area and viewing areas to - Deemed animal enclosures Withdrawn (retrospective) DCSE2005/0857/F Alteration of building to increase height to - Approved accommodate new press machines 11.05.05 DCSE2005/0863/F Siting of four silo tanks (retrospective) - Approved 11.05.05 DCSE2005/2104/F Proposed new production building - Approved 31.08.05 DCSE2005/2704/F Installation of tanks - Approved 4.10.05 DCSE2006/3252/F Proposed new loading bay - Approved 30.11.06 DCSE2007/1288/F Installation of fifty 20,000 litre storage tanks - Approved 19.06.07 DCSE2007/3658/F Proposed new steel framed building - Approved 21.01.08
4. Consultation Summary
Statutory Consultations
4.1No statutory or non-statutory consultations required.
Internal Council Advice
Read every report as text, not just the decision
Pro opens the officer report behind each decision, searchable and quotable, across every council we cover.
Follow Southern Area Planning Sub-Committee at Herefordshire and we tell you when its next papers are published, before the meeting rather than after it.
We use a cookie to keep you signed in and run your free-paper allowance, and an optional one to count visits. You can accept all, or choose. Privacy & cookies
Necessary
Keeps you signed in and runs your free-paper allowance. Always on.
Always on
Analytics
Counts visits and which pages are used. First-party only, no advertising, never shared.